| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L1 | Accepted-AOC TECHNO-COMMERCIALLY ACCEPTED | |
| 2 | L2₹1.8 L+₹27,231.96 (18.0%)Rejected-Finance BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | L2 | Rejected-Finance TECHNO-COMMERCIALLY REJECTED | |
| 3 | L3₹2.1 L+₹59,365.68 (39.2%)Rejected-Finance BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L3 | Rejected-Finance TECHNO-COMMERCIALLY REJECTED |
Tender Value
₹1.5 L
EMD Value
₹1,900
Closing Date
19 Aug 2022, 11:00 amClosed
AMRENDRA KUMAR
Kedla Washery, Hazaribagh Area, CCL
Rectification modification of damaged/decayed drive base frame of unit 227 and replacement of tensioning S. S. wire rope rectification of tail base frame of unit no. 122 belt conveyor main plant of Kedla Washery
2022_CCL_252665_1
PO/KW/e-Tender/22-23/56, dated 06.08.2022
Open Tender
Miscellaneous Works
Item Rate
12 days
Kedla Washery
As per NIT
2 documents required · 2 mandatory
₹1,900
9 Sept 2022
8 Aug 2022
20 Aug 2022
9 Aug 2022
19 Aug 2022
9 Aug 2022
9 Aug 2022 - 13 Aug 2022
Amount
Rectification/modification of damaged/decayed drive base frame of unit 227 belt conv. after diamantling & re-installation of gear box drive pulley motor & head snub pulley. (a) Dismantling of materials 90% of new (3.073MT) from unused plates.
(b) Shifting of materials at site.
(c) Dismantling G/box+ H. pulley +motor+ T. S. pulley for work as above.
(d) Dismantling damaged drive base frame 80% of new(3.073MT)
(e) Fabrication & erection of base frame.
(f) Installation of G/box head drive pulley snub pulley motor and alignment.
(g) Shifting of old materials.
Replacement of tensioning S. S. wire rope, rectification of tail base frame of unit 122 belt conv. after tail pulley, tail snub pulley along with take-up arrangement dismantling & re-installation. (a) Dismantling of materials 90% of new (1.272MT) from unused plates.
(b) Shifting of materials at site.
(c) Dismantling of tail snub pulley take-up wire rope.
(d) Dismantling old tail frame 60% of new(1.272MT)
(e) Fabrication & erection of tail frame.
(f) Installation of tail, snub take-up arrangement, wire rope
(g) Shifting of old materials.
Total impact of GST for the purpose of CTC
CHAHAT CONSTRUCTION COMPANY
TRIDEO CONSTRACTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .