| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.5 CrAccepted-AOC | ₹86.5 Cr | L1 | Accepted-AOC Being the lowest bidder. |
| 2 | L2₹113.0 Cr+₹26.5 Cr (30.6%)Rejected-AOC | ₹113.0 Cr+₹26.5 Cr (30.6%) | L2 | Rejected-AOC Being other than the lowest bidder. |
| 3 | L3₹114.6 Cr+₹28.1 Cr (32.5%)Rejected-AOC | ₹114.6 Cr+₹28.1 Cr (32.5%) | L3 | Rejected-AOC Being other than the lowest bidder. |
| 4 | L4₹115.8 Cr+₹29.3 Cr (33.9%)Rejected-AOC | ₹115.8 Cr+₹29.3 Cr (33.9%) | L4 | Rejected-AOC Being other than the lowest bidder. |
| 5 | Rejected-Technical C 301 SHREE BALAJI RESIDENCY BEHIND SANGATH SILVER APARTMENT SABARMATI GANDHINAGAR HIGHWAY MOTERA AHMEDABAD 380005 | AHMEDABAD | AHMEDABAD | GUJARAT | 380005 | - | - | Rejected-Technical Not approved due to non submission of Site Visit Certificate duly signed by Project Manager Along in terms of Para 13 at srl page No 9 and para 4(g) at srl page No 15 of NIT/Tender documents |
| Sl No | Description | Qty | Unit | RVR PROJECTS PRIVATE LIMITED L3 | Adhunik Infrastructures Pvt Ltd L1 | NIMMA NARAYAN ENGINEERS AND CONTRACTORS L2 | PL Raju Constructions Ltd. L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Total amount of Sch 'A' Part I (Building and Structure) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part-I) | 1 | Lump Sum | 90,80,00,000 ₹90,80,00,000 | 71,02,84,255.59 ₹71,02,84,255.59 Lowest | 90,41,95,962 ₹90,41,95,962 | 91,50,00,000 ₹91,50,00,000 |
| 2.00 | Total amount of Sch 'A' Part II (Dismantling and Demolition of Buildings) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part II) | 1 | Pre-Priced | 24,25,000 ₹24,25,000 | 28,44,259.32 ₹28,44,259.32 | 23,05,509 ₹23,05,509 Lowest | 25,00,000 ₹25,00,000 |
| 3.00 | Total amount of Sch 'A' Part III (Site Clearence, Earth Work And Area Development) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part III) | 1 | Pre-Priced | 1,80,00,000 ₹1,80,00,000 | 1,87,52,150.22 ₹1,87,52,150.22 | 1,59,15,296 ₹1,59,15,296 Lowest | 1,75,00,000 ₹1,75,00,000 |
| 4.00 | Total amount of Sch 'A' Part IV (Retaining Wall (For Height Upto 5.5 M) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part IV) | 1 | Pre-Priced | 2,38,00,000 ₹2,38,00,000 | 1,23,54,261.25 ₹1,23,54,261.25 Lowest | 2,29,53,298 ₹2,29,53,298 | 2,50,00,000 ₹2,50,00,000 |
| 5.00 | Total amount of Sch 'A' Part V (Internal Electrification and Lightning Protection) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part V) | 1 | Pre-Priced | 2,82,00,000 ₹2,82,00,000 | 1,85,26,453.32 ₹1,85,26,453.32 Lowest | 2,65,96,261 ₹2,65,96,261 | 2,75,00,000 ₹2,75,00,000 |
| 6.00 | Total amount of Sch 'A' Part VI (Internal Water Supply) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part VI) | 1 | Pre-Priced | 1,20,00,000 ₹1,20,00,000 | 44,51,259.32 ₹44,51,259.32 Lowest | 1,10,16,620 ₹1,10,16,620 | 1,35,00,000 ₹1,35,00,000 |
| 7.00 | Total amount of Sch 'A' Part VII (Road / Path / Culvert) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part VII) | 1 | Pre-Priced | 7,08,00,000 ₹7,08,00,000 | 4,52,52,963.3 ₹4,52,52,963.3 Lowest | 7,00,33,968 ₹7,00,33,968 | 7,25,00,000 ₹7,25,00,000 |
| 8.00 | Total amount of Sch 'A' Part VIII (External Electrification) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part VIII) | 1 | Pre-Priced | 1,82,00,000 ₹1,82,00,000 | 1,08,25,245.21 ₹1,08,25,245.21 Lowest | 1,69,94,687 ₹1,69,94,687 | 1,75,00,000 ₹1,75,00,000 |
| 9.00 | Total amount of Sch 'A' Part IX (External Water Supply) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part IX) | 1 | Pre-Priced | 53,75,000 ₹53,75,000 | 24,25,127.38 ₹24,25,127.38 Lowest | 40,00,757 ₹40,00,757 | 50,00,000 ₹50,00,000 |
| 10.00 | Total amount of Sch 'A' Part X (Sewage Disposal) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part X) | 1 | Pre-Priced | 1,30,45,000 ₹1,30,45,000 | 84,98,752.44 ₹84,98,752.44 Lowest | 1,28,27,129 ₹1,28,27,129 | 1,32,50,000 ₹1,32,50,000 |
Tender Value
₹81.3 Cr
EMD Value
₹15 L
Closing Date
4 Aug 2026, 6:00 pmClosed
CCE (Army) No. 1 Dinjan
HQ CCE (Army) No 1 Dinjan Assam 786183
COMPLETION OF INCOMPLETE WORK FOR PROVISION OF OTM ACCN and ALLIED FACILITIES AT ALONG UNDER CCE (ARMY) NO 1 DINJAN
2026_MES_769946_1
CCE/DIN/ALONG/03/2026-27
Open Tender
Civil Works
Lump-sum
1080 days
Along Arunachal Pradesh under PM Along
For enlisted firm Class SS and category a(i) and also refer para 8 (a) and for unenlisted firm refer para 8 (b) of NIT Ser Page No page 13 of tender documents
9 documents required · 9 mandatory
₹3,000
HQ CCE ARMY No 1 Dinjan
₹15 L
Yes
HQ CCE (Army) No. 1 Dinjan
16 Sept 2026
5 Jun 2026
11 Aug 2026
5 Jun 2026
4 Aug 2026
14 Jul 2026
5 Jun 2026 - 20 Jun 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Total amount of Sch 'A' Part I (Building and Structure) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part-I) | 1 | Lump Sum | 62,82,05,908 | ₹62,82,05,908 |
| 2 | Total amount of Sch 'A' Part II (Dismantling and Demolition of Buildings) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part II) | 1 | Pre-Priced | 29,59,261.62 | ₹29,59,261.62 |
| 3 | Total amount of Sch 'A' Part III (Site Clearence, Earth Work And Area Development) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part III) | 1 | Pre-Priced | 2,18,74,331.1 | ₹2,18,74,331.1 |
| 4 | Total amount of Sch 'A' Part IV (Retaining Wall (For Height Upto 5.5 M) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part IV) | 1 | Pre-Priced | 1,54,30,496.42 | ₹1,54,30,496.42 |
| 5 | Total amount of Sch 'A' Part V (Internal Electrification and Lightning Protection) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part V) | 1 | Pre-Priced | 1,89,39,632.54 | ₹1,89,39,632.54 |
| 6 | Total amount of Sch 'A' Part VI (Internal Water Supply) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part VI) | 1 | Pre-Priced | 48,68,224.62 | ₹48,68,224.62 |
| 7 | Total amount of Sch 'A' Part VII (Road / Path / Culvert) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part VII) | 1 | Pre-Priced | 4,79,36,403.89 | ₹4,79,36,403.89 |
| 8 | Total amount of Sch 'A' Part VIII (External Electrification) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part VIII) | 1 | Pre-Priced | - | - |
| 9 | Total amount of Sch 'A' Part IX (External Water Supply) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part IX) | 1 | Pre-Priced | 27,35,614.97 | ₹27,35,614.97 |
| 10 | Total amount of Sch 'A' Part X (Sewage Disposal) (Pre Priced Amount as in Col 7, brought forward from Total of Sch 'A' Part X) | 1 | Pre-Priced | 89,21,312.58 | ₹89,21,312.58 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.46 MB
5.ARBORICULTURE-Contour.pdf
Additional Documents • 8.59 MB
1.Survey Drawing-Layout1.pdf
Additional Documents • 2.73 MB
2.SITE PLAN-Contour.pdf
Additional Documents • 4.56 MB
3.ROAD FOOT PATH CHAIN LINK FENCING-Contour.pdf
Additional Documents • 5.18 MB
4.CULVERT & DRAIN-Contour.pdf
Additional Documents • 5.14 MB
pump house along-LINE PLAN.pdf
Additional Documents • 0.24 MB
6.Electrical Site Plan 16-04-15-ELEC.pdf
Additional Documents • 1.80 MB
7.SEWAGE-Contour.pdf
Additional Documents • 4.80 MB
8.A.pump house WITH WATER SUPPLY-LINE PLAN.pdf
Additional Documents • 0.48 MB
8.WATER SUPPLY-FINAL-Contour.pdf
Additional Documents • 4.62 MB
10.superimposed existing n proposed-Contour.pdf
Additional Documents • 4.94 MB
TenderAlongA.pdf
Tender Documents • 4.01 MB
BOQ_862236.xls
BOQ • 2.62 MB
ALONG T.D- 1 MERGED.pdf
Additional Documents • 16.40 MB
ALONG T.D - 2 MERGED.pdf
Additional Documents • 15.70 MB
SchFinishes.pdf
Additional Documents • 16.07 MB
arch2.pdf
Additional Documents • 32.71 MB
arch1.pdf
Additional Documents • 9.00 MB
Elect.pdf
Additional Documents • 20.40 MB
str2.pdf
Additional Documents • 36.70 MB
Misc.pdf
Additional Documents • 14.43 MB
str1.pdf
Additional Documents • 31.96 MB
Extn.pdf
PDF • 0.29 MB
vettedstrdrgs111229.pdf
PDF • 19.46 MB
vettedstrdrgs1110.pdf
PDF • 35.64 MB
TDandMisc.pdf
PDF • 0.66 MB
Revisedpages.pdf
PDF • 1.78 MB
78703NIT.pdf
PDF • 1.20 MB
78073Criticaldate1.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .