| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 3 NQ 11 WARD NO 5 OBRA SONBHADRA UTTAR PRADESH 231219 | SONBHADRA | UTTAR PRADESH | 231219 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical NEW COLONY NEAR SUB STATION OBRA SONBHADRA U P | Rejected-Technical As per PQC not Qualifed |
Tender Value
₹18.2 L
EMD Value
₹36,500
Closing Date
17 May 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE-V BTPS Obra
Office of SE-V BTPS Obra
Work of Operation, Routine and breakdown Maintenance, Repair/Rectification of various engine spares of BEML make Dozers of CHP-A and CHP-B of CHD-III Obra Thermal Power plant
2025_RVUNL_1027872_1
N-OBR////6000007769_00/SE-V
Open Tender
Repair and Maintenance Works
Fixed-rate
184 days
CHD-III BTPS
as per PQC
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO
₹36,500
11 Jun 2025
12 Apr 2025
19 May 2025
12 Apr 2025
17 May 2025
12 Apr 2025
12 Apr 2025 - 17 May 2025
Amount
Repairing Housing fly wheel
Repairing Radiator
Repairing Hydraulic jack cylinder
Radiator fan Dismantling of related components for taking out of radiator fan assy. Cleaning and servicing, greasing the assy. With repair/ replacement of damaged /worn-out parts like pulley fan blades, bearing etc. Reassembly of the fan assy. On chassis and its commissioning.
Dismantling of old mounted radiator fan assy. From chassis and its related components .Installation of new radiator fan assy .after greasing and its commissioning.
Repairing Hydraulic jack cylinder beam
Repairing Hydraulic tank
Repairing Main engine N-743C On chassis
Repairing Out of chassis
Repairing Main clutch
Repairing Gear box
Repairing Steering system
Repairing C-frame
Repairing Engine & clutch guard
Repairing Dozer blade & cutting edge
Repairing Track system Track bogie
Grease cylinder piston assly.
Repairing Track shoe
Repairing Link bush
Repairing Master/Regular pin
Repairing Track line
Repairing carrier roller
Repairing Sprocket
Fabrication & Erection of BEML Dozer blade after repair of base structure of blade assy.
HARD FACING OF THE DOZER BLADES
REPAIRING OF ACTUATOR BEAM
FABRICATION OF SUPPORT OF CUTTING EDGE AND END BITS.
REPAIRING OF ‘C’ FRAME
REPAIRING OF ARMS OF ‘C’ FRAME
PAINTING OF DOZERS
REPAIRING OF EXHAUST MUFFLER
Repairing Self starter (Lucas) GSL-5(24V)
Repairing Alternator (AC-5)24V
Repairing Self Armature(GSL-5)24V
Repairing Battery charger
Repairing of exide battery 12V 25 plate for dozer
Repairing Main clutch pump
Repairing Hydraulic pump
Repairing Steering pump
Repairing Cooling water pump
Repairing P.T.O. case unit (power take units)
Repairing Oil cooler
Repairing Hydraulic cylinder
Repairing Radiator
Repairing Sprocket
Repairing Idlers
Repairing Track roller single flange
Repairing Track roller double flange
Repairing of connecting rod of BEML dozer
Repairing of dozer sheets (bottom sheet 01 no. back sheet 01 no. & hand rest 02 nos. for each set.
Repairing of cylinder tray assly. of hydraulic cylinder of BEML dozer
Repairing of crank shaft of Cummins N-743-C engine
Repairing of P.T. fuel oil pump of Cummins N-743-C engine
Injector assly. of Cummins N-743-C engine
Repairing of cylinder head assly. of Cummins N-743-C engine
Repairing of rocker arm of Cummins N-743-C engine
REPAIR OF U.J. ASSEMBLY
REPAIR OF BOOSTER ASSEMBLY
REPAIR OF LUBRICATING OIL PUMP
REPAIRIONG OF RETAINER OF CLUTCH ASSLY.
Operation and routine checking of BEML D-80A-12 and BD-155 dozers in each shift round the clock at Coal Handling Plant, BTPS, Obra. (01 Job = Operation of 01 Dozer per shift in a month)
Operation and routine checking of BEML D-80A-12 and BD-155 dozers in each shift round the clock at Coal Handling Plant, ATPS, Obra. (One job = OPERATION OF 2 Dozer for one shift duty of 8 Hrs.)
HOUSING FLY WHEEL Overhauling of housing fly wheel with replacement of the worn-out ,damaged parts such as bearings, washers lock, ’O’ Ring ,plate lock, rim gear, studs with nut, spring washer ,cap screw dowel etc.
RADIATOR Dismantling the related components of radiators for taking out of the radiator from chassis. Cleaning of outer surface and air passage and its commissioning. If miner leakage are found in the tubes then its soldering before installation .If required complete replacement of radiator assy. (repaired/new)
HYDRAULIC JACK CYLINDER. Dismantling the related components for taking out of hydraulic jack from dozers chassis after draining hydraulic from tank. Cleaning and servicing with replacement of damaged worn-out parts such as backup ring, ’O’ Ring, D.A. fluid seal assy. dust cap ,split pin, ’U’ Packing set, wiper seal, seal bearing, piston, spring, bushing, plate valves etc. assy. of the complete cylinder installation and commissioning . (One set= 2 Hydraulic cylinders).
RADIATOR FAN Dismantling of related components for taking out of radiator fan assy. Cleaning and servicing, greasing the assy. With repair/ replacement of damaged /worn-out parts like pulley fan blades, bearing etc. Reassembly of the fan assy. On chassis and its commissioning.
RADIATOR FAN Dismantling of old mounted radiator fan assy. From chassis and its related components .Installation of new radiator fan assy.after greasing and its commissioning.
HYDRAULIC JACK CYLINDER BEAM Dismantling of related components for taking both side beam from dozer chassis .Taking out both side both side yokes and checking ,of its thread .If worn-out after re-metalizing, machining (done by department)their reassembly greasing ,installation on chassis and its commissioning on load.
HYDRAULIC TANK Dismantling of all related components for taking out the hydraulic tank .Draining of hydraulic oil from the tank. Dismantling of thee hydraulic tank and its cleaning. Repair/replacement of worn-out /damaged parts such as gaskets, ’O’ ring, poppet shins, spring hose, clamp etc. Assy. of all related parts and its mounting on chassis and commissioning.
MAIN ENGINE ( On CHASSIS) Decanting of oil from pump and hydraulic tank removing of foot plates, beam, ties, hydraulic metallic pipes, booster, hydraulic cylinder, radiator fan, jockey pulley, water manifold and all other related components, lifting of the engine after removing sump. Taking out of connecting rod with piston and rings and cylinder, liners. Repair/changing of damaged/worn out parts such as cylinder, liner, piston ring, connecting rod, bearing, heads, injectors, injector rod etc. Reassembly and commissioning of the Engine.
ENGINE OUT OF CHASSIS Dismantling of clutch and its related components and taking out of Engine from the chassis. Dismantling of complete Engine cleaning of all dismantled parts .Polishing of crank shaft main and complete replacement with new repaired crank shaft. Repair/replacement of bearing ,connecting rod, nut bolts, lock washers, piston, piston ring liner, injector, injector rod, heads, rocker arm housing. P.T. pump and B check kit service. Repairing/changing of all spares available in head gasket and Engine gasket set. Servicing of water pump, jockey pulley, cam shaft, bushing cam follower etc. re-assembly of complete Engine and its commissioning. NOTE: Firing order will be set right by department.
MAIN CLUTH Dismantling of related components by draining of clutch oil for taking out clutch housing with driving shaft. Dismantling of components of clutch repair/replacement of worn-out/damaged part such as bearing, clutch seal, retainer, cover, pressure plate, clutch plate, disc, driving shaft, inertia break lining, filter, rollers, bolts, washers, pin etc. Re-assy. of clutch and mounting on chassis. In taking of all dismantled related components .Commissioning of dozer in respect of clutch.
GEAR BOX Taking out of gear box from chassis after dismantling of its related components. Dismantling Of gear box, Cleaning of all the parts. Repairing /replacement of worn-out/damaged parts such as bearing ,bushings gears, couplings, lock, key soakers, ‘O’ Rings, seal, bolts, flanges, shaft, fork, lever etc. Re-Assy. Of the gear box and its installation on chassis. Re-mounting of all dismantled related components, testing and commissioning of the gear box.
STEERING SYSTEM After removing diesel fuel tank, seat assy. etc. Taking out of steering valve, steering brake lever, brake liner, flange bearing, steering housing tubes, clutch etc. from the chassis. Cleaning of all the parts of steering system. Repair/Replacement of worn out/damaged parts such as ring seal, ‘O’ Ring, bearing, shims, steering disc, plate disc, lock needle bearings, lining etc. Re-assy. Assembly Of steering system and mounting of dismantled components on chassis and its commissioning.
‘C’ FRAME Dismantling of related components for taking out ‘C’ Frame and erection of new fabricated joints hinges. Alignment of ‘C’ Frame and its dismantled related components on the chassis and its commissioning.
ENGINE & CLUTCH GUARDS Dismantling the engine and clutch guard from the chassis. Cleaning and fixing it on chassis.
DOZER BLADE & CUTTING EDGE Removal of old and damaged blade assy. Bending of 10mm.M.S. Plate to accurate profile of blade of size 4.3’’X9.25’’ from coal pushing side. Fabrication of above plate on blade assy. Throughout the blades. Fabrication of side patching of size 1.5X30X88mm on fabricated plate. Repair/replacement of cutting blade. Repair/Replacement of damaged cutting edges-5 Nos. tightening of 5 Nos. cutting by nut& bolts.
TRACK BOGEE Dismantling of track chain from its master pin and lifting the complete dozer chassis by hydraulic jack. Dismantling of idler from yoke and brackets. Taking out the track bogie from the dozer. Dismantling of 2 Nos. double flange rollers and 4 Nos. single flange rollers and other related components from the track of bogie. Repair/idler by replacement of seal ring assy., bracket taper bolts & nuts, spring, washer, attaching to yoke etc. changing of piston, cylinder, grease filling inlet and drain from the bogie. Repair of rollers by providing seal ring assy., bracket with half round lock etc. Filling of oil in idler and rollers on bogie. If required replacement of complete rollers and idler. Mounting of complete bogie in the chassis. Fitting of complete in the system and tightening by filling grease. Commissioning of the track bogie.
GREASE CYLINDER PISTON ASSY. Dismantling of track chain and related components for taking out grease cylinder piston assy. Replacement/repair of grease cylinder piston assy. After filling grease, re-assy. of the dismantled Related component and fitting, tightening of the track chain in the system of filling grease and its commissioning.
TRACK SHOE Replacement of track shoe by cutting of 4Nos. fastening bolts.
LINK BUSH Replacement of master / regular pin of track chain by heating, jacking, hammering and cutting.
MASTER /REGULAR PIN Replacement of master /regular pin of track chain by heating, jacking, hammering and ducting.
TRACK LINE Replacement of left /right track links of track chain by heating, cutting, pressing of hammering.
CARRIER ROLLER After losing the track chain, dismantling the carrier roller, cleaning of the carrier roller after draining the old lubrication .After cleaning filling of fresh lubrications .If required replacement of carrier roller complete, mounting of carrier roller on the chassis and tightening of track chain and its commissioning. (One job consists of 2Nos. rollers).
SPROCKET Dismantling of track chain, track bogie and other related components for taking out the sprocket. Repair/replacement of damaged /worn out parts such as gasket, ’O’ Ring, seal ring assy., keys, lock, nuts, bushing, spares, bearing roller. Cleaning of all the components and housing by air and oil. Filling of fresh of complete sprocket. Re-assy. Of track bogie track chain and other related components and its commissioning.
Fabrication & Erection of BEML Dozer blade after repair of base structure of blade assy. SCOPE OF WORK FOR EACH a. Dismantling of worn out blade from the base support of Dozer. b. Strengthening of the base support by heating and hammering and welding where bended. c. Cutting and grinding the sides of base where excess materials is deposited due to previous welding. d. Fabrication of the blade and bending the same for complete length of the blade in three equal parts (ABC) from the given 5/6mm. M.S. Plate as per original profile. e. Fabrication of the side support two Nos. from 8mm. M.S. Plate and welding the same as per original profile. f. Erected three Nos. blade newly fabricated as per items No. (d) on the base of welding. g. Erection of two Nos. side support (newly fabricated as per items no.) on the above erected blades by welding. h. To maintain the balancing and leveling of the new erected blades and supports.
HARD FACING OF THE DOZER BLADES a. Patching of the damaged portion of the dozer blades by 6mm. thick M.S. if required. b. Hard facing will be done in square form of size 1-1/2” with suitable hard facing electrodes. (The hard facing area are of the blade is approx. 2.8ftX13ft.)
REPAIRING OF ACTUATOR BEAM a. After dismantling the related components taking out the actuator beam from the Dozer chassis. b. Cleaning & polishing of the actuator. c. Taking out its bushing and other related parts. d. Making of its bore to original condition by welding and machining. e. Welding of the different cracks on body of actuator beam and its grinding. f. Re-assembling of parts and mounting the actuator beam on dozer chassis.
FABRICATION OF SUPPORT OF CUTTING EDGE AND END BITS. a. Dismantling of support, cutting the worn out portion of support of cutting edge. b. Fabrication of new support of cutting edge and end bits as per original profile with the M.S. Plate of 16/18mm.width. c. Drilling the holes on erected support in summery of the holes of cutting edges and end bits. (The number of holes of 03 Nos. cutting edges 24mm. and that of both side end bits is 12). d. Erection of the new fabricated support to the dozer blade by welding and cutting. e. Fixing of 3 Nos. cutting edge and both side end bits to the dozer blade by suitable size of nut and bolts.
REPAIRING OF ‘C’ FRAME a. Fixing of the 02 Nos. of bracket to the ‘C’ frame by welding and cutting ( Left and Right ) brackets will be arranged from old and used ‘C’ b. Fixing of bracket Inner 4 Nos. on the ‘C’ Frame 2Nos. for blade arms and other 02 Nos. for hydraulic jacks by cutting and welding. c. Fixing of 01 No. centre hinge suitable for centre pin on the ‘C’ frame.
REPAIRING OF ARMS OF ‘C’ FRAME a. Dismantling of related components of the arms and supporting arms of ‘C’ frame and taking out the both side arms from the ‘C’ Frame. b. Strengthening of both side arm and supporting arms of ‘C’ frame by heating and pressing by hydraulic jack. c. Machining and re-threading of arm screw after re-metaling as per original profile. d. Re-threading of inner portion of jobs. e. Assembling of the arms and supporting arms of ‘C’ frame.
PAINTING OF DOZERS a. Cleaning of the dozer body with caustic soda. The rusted portion of the dozer will be cleaned thoroughly by the emery paper. b. After thorough cleaning double coat of red oxide will be applied over complete dozer. c. After drying out the red oxide coating completely the body of the dozer will be painted in double coat with super quality Asian paint of yellow color.
REPAIRING OF EXHAUST MUFFLER SCOPE OF WORK 1. Remove the both side of exhaust muffler by cutting. 2. Complete repaired the inner portion of exhaust muffler. 3. Welding the both side muffler by providing new M.S. Plate.
Self-Starter (Lucas) GSL-5 (24 V) SCOPE OF WORK i. Dismantling of the self ii. Rewinding of armature iii. Rewinding of exciting Coil. iv. Replacement of magnet switch. v. Replacement of the following such as:- a. Commutator. b. Armature shaft. c. D.E. bushing. d. Clutch Assy. e. C.E. bushing. f. Plunger assy. g. Pinion h. Solenoid switch. i. Main field coil Assy. j. Auxiliary field coil assy. k. Castle nut. l. Clutch washer & triplet screw. m. Carbon brush assy. n. Cotton winds pole & screw. o. Shims coils, seal & belt pad. p. Through bolt, nuts, washer, C.E. Bearing, DE bearing brush leads, spring, washers, nuts, terminal, DE insulation bus, plane washer, earth terminal, poles screws key, rivets, trough studs, nuts & washers. vi. Testing of self-starter.
Alternator (AC-5)24 Volts SCOPE OF WORK i Dismantling of components. ii. Rewinding of armature. iii. Rewinding of starter coil. iv. Replacement of the following such as. a. Lucas blades, insulators, grommets, nuts & washers. b. Carbon brushes, brush holder and brush assy. c. Main terminal, baffle screw, nuts washer and gaskets. d. ‘O’ Ring, Slip Ring. Cir-clip wood ruff key. e. Bearings. f. Pulley nuts. g. Cooling fan shaft. h. Cut out. v. Testing of the alternator.
SELF ARMATURE(GSL-5 )24 V SCOPE OF WORK i. Dismantling of the self. ii. Rewinding of armature. iii. Replacement of the shaft and Commutator. iv. Balancing of the armature. v. Testing of the armature.
Battery Charger SCOPE OF WORK i. Dismantling of the Battery Charger. ii. Rewinding of Transformer Coil. iii. Replacement of the following such as :- a. Rectifier b. Regulator Contact Switch c. On & Off Switch d. Fuse Carrier e. C.E.bushing f. Ammeter g. Indicating bulb iv. Testing of charger on overload.
Repairing of Exide Battery 12V, 25 Plate for Dozer SCOPE OF WORK FOR EACH a. Replacement of damaged 6 Nos. cells each containing 25 Plates (12 Nos. +ve and 13 Nos.–ve). b. Replacement of damaged rubber shoes provided in between the +ve and –ve plates. c. Replacement of 6 Nos. connector. d. Replacement of +ve and –ve terminal. e. Testing of the batteries after filling acid and charging (Acid shall be arranged by the firm at their own cost.
MAIN CLUTCH PUMP. SCOPE OF WORK i. Dismantling of the pump ii. Repair by welding and machining of bracket, gear case and side plate housing. iii. Replacement of the following such as :- a. Gears with shaft b. bearing need c. Oil seals d. ‘O’ Ring and its pin iv. Re-assembly and testing on 12 kg/cm2 oil pressure for leakage.
HYDRAULIC PUMP. SCOPE OF WORK i. Dismantling of the pump ii. Repair by welding and machining of bracket, cover, ring backup cover plate and collar. iii. Replacement of the following such as:- a. Drive and driven gear shafts. b. Seal oil, bushing with bearings. c. Local & ‘O’ Ring. iv. Re-assembly and testing on 150 kg/cm2 oil pressure.
STEERING PUMP. SCOPE OF WORK i. Dismantling of the pump ii. Repairing by welding and machining of bracket, gear case and side plate housing. iii. Replacement of the following such as:- a. Gears with shaft b. Bearing needle c. Oil Seals. d. ‘O’ Ring and its pin iv. Re-assembly and testing on 12 kg/cm2 oil pressure.
COOLING WATER PUMP. SCOPE OF WORK i. Dismantling of pump ii. Replacement of following such as:- a. Pulley b. Shaft c. Bearing d. Impeller e. Seal & Gaskets etc. iii. Testing of the pump.
P.T.O. CASE UNITS (Power Take of Units). SCOPE OF WORK i. Dismantling of P.T.O. case. ii. Cleaning of the components. iii. Replacement of following such as:- a. Bearing No. 500346 - 2Nos. b. Bearing No. 501616 -1No. c. Bearing No. 501778 – 1No. d. Bearing No. S 16070 -2Nos. e. Shaft Pt. No. 501536 – 2Nos. f. ‘O’ Rings g. Gasket h. Cir-clip, Key & lock.
OIL COOLER. SCOPE OF WORK i. Dismantling of oil cooler ii. Cleaning of tubes iii. Replacement of following such as:- a. Damaged tubes b. Gaskets. c. Lock drain d. bolts & spring washer iv. Testing of collar for leakage.
HYDRAULIC CYLINDER. SCOPE OF WORK i. Dismantling of Cylinder. ii. Straightening of the piston rod. iii. Replacement of the following such as:- a. Backup ring b. D.A. fluid seal assy. c. Dust cap d. Split pin e. U packing seat f. Wiper seal g. Clamp bolt i. Piston and plate j. Bushing and plate k. ‘O’ Ring valves spring & oil fixes iv. Reassembly of the cylinder
RADIATORS. SCOPE OF WORK i. Cleaning of radiator cores and tank by caustic soda and air pressure. ii. Brazing of leakage tubes with replacement of the following such as :- a. Gasket b. Nut, Bolt & washers. iii. Assembly of the Radiator and hydraulic testing.
SPROCKETS. SCOPE OF WORK Repairing of sprocket teeth by removing oil welded metal, then re-depositing the metal by welding with suitable electrode, machining the teeth to its standard profile polishing the inner & outer bore to remove spots to its standard profile and dimension.
IDLERS SCOPE OF WORK Repairing of idler by welding of inner bore collar of bore flange and riding races by electrodes 1061 and machining of idler to its standard size providing 2 nos. new bearing and taping 16 Nos. holes and 12X8mm. on either side. Provided 16 bolts & 16 washer of 12mm dia. & 45 mm. lengths. Repairing of bracket by welding & machining. Reassembly after providing seal ring, seal ring assy. & ‘O’ rings on shaft.
Track Roller Single Flange SCOPE OF WORK FOR EACH Re-metalizing of the rollers outside & including its flanges with suitable electrodes & machining thereafter to the standard size as per drawing/sample. Re-metalizing with suitable electrodes on the outer surface of shaft & its collar & machining thereafter to its standard size as per drg. /sample. Drilling & taping of 6 Nos. of holes on both the side (12mm.size) blanking of oil holes & machining for proper outer surface. Assembly of the machined rollers & shaft with the replacement & fixing of the following required spares for each roller (spares are to be arranged by the contractor at their own cost). a. ‘O’ Ring 4 Nos. b. Bearing with bronze (150-30-00019) 4 Nos. c. Bolts & Spring Washer 12 Nos.
Track Roller Double Flange SCOPE OF WORK FOR EACH Re-metalizing of the rollers outside & including its flanges with suitable electrodes & machining thereafter to the standard size as per drawing/sample. Re-metalizing with suitable electrodes on the outer surface of shaft & its collar & machining thereafter to its standard size as per drg. /sample. Drilling & taping of 6 Nos. of holes on both the side (12mm.size) blanking of oil holes & machining for proper outer surface. Assembly of the machined rollers & shaft with the replacement & fixing of the following required spares for each roller (spares are to be arranged by the contractor at their own cost). a. ‘O’ Ring 4 Nos. b. Bearing with bronze (150-30-00019) 4 Nos. c. Bolts & Spring Washer 12 Nos.
Repairing of connecting rod of BEML Dozer SCOPE OF WORK a- Grinding of inner bore bearing portion. b- Polishing the inner bore portion matching with bearing (bearing shall be provided by the department). c- Strengthening of bend connecting rod.
Repairing of Dozer Seats ( Bottom Seat-1 No., Back Seat-1 No. & Hand Rest-2 Nos. for each set ) SCOPE OF WORK FOR EACH a. Fabrication of dozer seats by using by good quality of foam and rexin. All shisham wood bases are to be on horizontal and spring system arrangement. b. Providing 4nos. bolts on each seat with the base. c. Providing 2nos. fastening system on top of back seat.
Repairing of cylinder stay assy. Of hydraulic cylinder of BEML dozer. SCOPE OF WORK FOR EACH a. Complete dismantling of cylinder stay assay. And taking out yokes from both sides. b. Cutting of both side cylinder beam form threaded portion. c. Taking out the damaged bushed, re-metalizing and machining the inside portion of the cylinder and yokes to standard size. d. Making thread to both sides as per profile. e. Fitting of new brass bush (arranged by the firm at their own cost) re-joining the outer portion of the cylinder beam by welding. f. Re-assembly of the cylinder stay assy.
Repairing of crank shaft of Cummins N-743C Engine of BEML Dozer by 10/20/30 (U/S) I. Main journal (7 Nos.) II. Connecting journals (6 Nos.) SCOPE OF WORKS FOR EACH a. Grinding of Main journals (7 Nos.) with proper fillet radius. b. Grinding of connecting rod bearing journals (6 Nos.) with proper fillet radius. c. Polishing of journals (13Nos.) d. Straightening the bend crank.
Repairing of P.T. Fuel oil pump of Cummins N-743C Engine. SCOPE OF WORK a- Dismantling of the complete pump. b- Cleaning and servicing of the pump with replacement of worn out part such as F.P. shaft, ball bearing, key coupling, barrel & plunger, ring snap, half coupling ,shaft throttle tado shaft, gasket set, various type of ‘O’ ring, shim, bushing, gear, adopter, screw pap, shield fuel coil assy., dust cap, plunger cover front etc. c- Testing of the pump on 120kg/cm2 oil pressure.
Injector Assy. Of Cummins Engine N-743C Engine. SCOPE OF WORK a. Dismantling of the complete Injector Assy. b. Cleaning and servicing of injector assy. with replacement of worn-out parts such as. Kit barrel plunger, cup injector, pin springs ball point orifice plug, link injector, P. T. O. retainer etc. c. Testing the fuel pressure on 80kg./cm2
Repairing Of Cylinder Head Assy. Of Cummins N-743C Engine. SCOPE OF WORK a. Dismantling the complete cylinder head. b. Cleaning and servicing of the cylinder head by replacement of worn out part such as coolant valve, spring valve adjust valve Intake guide, guide spring, leave injector, insert valve etc.
Repairing Of Rocker Arm Of Cummins N-743C Engine. SCOPE OF WORK a. Dismantling of the complete RKR assy. b. Cleaning and servicing of RKR assy. With replacement of the worn out parts such as shaft RKR, plug, expansion, lever RKR, Fuel adjusting screw etc.
REPAIR OF U.J. ASSEMBLY 1. Welding with special L&T, SS electrodes, on the surface of cup portion (04 Nos) machining & grinding finish. 2. Replacement of needle bearing assy.(150-11-00350) with its dust seal(04 Nos). 3. Replacement of worn out parts such as both the spiders, bearing caps, grease, fitting, bolts & nuts, spring, washer etc. 4. Balancing of flanges (02 Nos). 5. Painting of complete U.J. assy.
BOOSTER ASSEMBLY Complete dismantling of booster pump assy. Through cleaning, metalizing the bore of the body valve and machining to standard size, replacement of won out parts such as washer spring, piston valve, coupling snap, ring etc. Re-assembly and painting.
LUBRICATING OIL PUMP Complete dismantling of pump, repair/reconditioning of shafts by re-metalizing and machining, replacement of worn-out parts such as bushing, gasket, lick-washer, gears, pressure relief valve, calibration and testing of pump for leakages at 6kg.cm2
REPAIRIONG OF RETAINER OF CLUTCH ASSLY. SCOPE OF WORK FOR EACH 1. Re-metaling the worn out inner and outer portion of retainer by suitable electrode. 2. Machining, grinding & finishing the re-metaling portion as per original profile.
PRIYANKA ENTERPRISES (BID ID -5195759)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .