| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance ARUVANKATTUR KOOLTHAMPALAYAM POST KONGANAPURAM SANKARI TALUK SALEM 637102 | SALEM | SALEM | TAMIL NADU | 637102 | ₹1.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.8 CrRejected-Finance | ₹1.8 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | K.P.RANGARAJU L1 | ARJ CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00(I). BT Road | |||||
| 1.10 | Charges for Cutting the BT Surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen iterms etc, complete. as per the direction of the departmental officers | 27,113 | m2 | 97 ₹26.3 L | 106 ₹28.7 L |
| 1.20 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 69 | m3 | 124 ₹8,556 | 136 ₹9,384 |
| 1.30 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 23 | m3 | 2,238 ₹51,474 | 2,461 ₹56,603 |
| 1.40 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 212 | m3 | 4,391 ₹9.3 L | 4,827 ₹10.2 L |
| 1.50 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 38,740 | m2 | 27 ₹10.5 L | 30 ₹11.6 L |
| 1.60 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 1,163 | m3 | 9,941 ₹1.2 Cr | 10,930 ₹1.3 Cr |
Updated dates
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
28 Jan 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem
Renevation of BT Road in Division No- 32, 9, 10, 36, 40, 43, 33, 35, 37, 38 and 39 of Ammapet Zone (Package -3)
2026_MAWS_641579_1
E4-EST-NO-254-R-2025-2026
Open Tender
Civil Works
45 days
Salem City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.2 L
Salem City Municipal Corporation
6 Feb 2026
10 Jan 2026
28 Jan 2026
10 Jan 2026
28 Jan 2026
10 Jan 2026
14 Jan 2026
Charges for Cutting the BT Surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen iterms etc, complete. as per the direction of the departmental officers
Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications.
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOD.pdf
Tender Documents • 0.73 MB
BOQ_768441.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid