| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC AoC |
| 2 | L2₹1.4 Cr+₹2.8 L (2.10%)Rejected-Finance GONDA | UTTAR PRADESH | 271001 | ₹1.4 Cr+₹2.8 L (2.10%) | L2 | Rejected-Finance Rejected |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
2 Jun 2026, 12:00 pmClosed
SE RED, Devipatan Circle Gonda
SE RED, Devipatan Circle Gonda ,Near SP Awas, Police Line, Gonda
Under District Gonda, Construction of road from Bambampurwa to the house of Dhruvaraj Pradhan In Gram Panchayat Bahuvan Madar Majha, Lot No 35
2026_REDUP_1151281_35
06/SE RED Devipatan/Gonda/26-27 Dt 06/04/2026
Open Tender
Civil Works
Percentage
180 days
Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹2.6 L
SE RED, Devipatan Circle Gonda
4 Aug 2026
21 May 2026
3 Jun 2026
21 May 2026
2 Jun 2026
21 May 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Construction of embankment with approved materials obtained from borrow pits with a lift upto 1.5m with normal lead upto 50m transporting to site, spreading grading to required slope and compacting to meet requirement of table 300.1 and 300.2 as per. Technical specification Clause 301.5 Mord 301.5 | - | CUM | 100.51 | - |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | - | CUM | 3,542.46 | - |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 1 | CUM | 4,888.32 | ₹4,883.43 |
| - | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, plate vibrators and finished in continuous operation as approved curing od concrete shalavs slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | - | CUM | 9,115.54 | - |
| - | Construction of Subgrade and Earthen Shouder with approved soil with all lifts and leads laying in layers, breaking clods, dressing to required lines curves,grade and sections watering and compaction to meet at least 100 % procter density complete to specification requirement Shoulder Sl.No. 3.3+3.5 MORD 301.5 | - | CUM | 101.55 | - |
| - | Construction of hume pipe culvert including supply of all material, labour T & P etc complete as per direction engineer-in-charge. | - | - | - | - |
| - | Excavation in foundation in ordinary soil as directed by the Engineer-incharges.as per SI.No. 251 | - | Cum | 118.75 | - |
| - | Concrete with 4cm. Gauge stone ballast ,fine sand of 1.25 FM & cement in proportion 8:4:1 in foundation and floors as per SI.No. 275 | - | Cum | 4,085 | - |
| - | Supply and laying dry brick ballast (OBB) under and half round of the pipe | - | Cum | 1,140 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_2156465.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .