Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC AOC given being L1 |
| 2 | L2₹9.5 L+₹1.6 L (19.9%)Rejected-Finance | ₹9.5 L+₹1.6 L (19.9%) | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹10.1 L+₹2.1 L (27.0%)Rejected-Finance | ₹10.1 L+₹2.1 L (27.0%) | L3 | Rejected-Finance Rejected being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected due not submission of documents |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected due not submission of documents |
Tender Value
₹9.1 L
EMD Value
₹18,150
Closing Date
15 May 2023, 2:00 pmClosed
Sr.Executive Engineer
Slapper Division BBMB Slapper
Providing retaining wall with plum concrete along road near main Gate at BBMB Colony Slapper and backside of model room Complex towards Satluj River at Slapper.
2023_BBMB_100719_1
NIT-15/2023-24-SLP
Open Tender
Civil Works
Item Rate
180 days
Slapper
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹18,150
29 Aug 2023
17 Apr 2023
16 May 2023
17 Apr 2023
15 May 2023
17 Apr 2023
Amount
Earth work in excavation of foundations of bridges culverts, building including handling of materials with combined lead of 15 metres dressing of bed and sides stacking the excavated soil clear from the edge of excavation and subsequent filling around:- (b) for semi conglomerate or soil of nature of pick jumper.
Cement concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type.
Centring and shuttering for faces of walls,partitions,retaing wall and the like (vertical or bartering including attached pilasters buttersses etc.
Plum cement concrete 1:3:6 with stone ballast 40mm gauge using 15 percent plum.
Stone masonry work in cement mortar 1:3 in foundation compelete as per drawing and technical specifications. (B) Random Rubble Masonry.
Providing weep holes in Brick masonry /Plain/Reinforced concrete abutment wing wall/return wall with 100 mm dia PVC pipe extending through the full width of the structure with shape of IV:20H towards drawing pre-complete as per drawing and Technical specification.
Stone filling behind retaining wall.
Stone pitching top coping only.
Grouting stone filling or pitching with mortal.
Sanjeev Kumar Sharma
gautam survey
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .