| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -5.86% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹3.5 L (2.77%)Admitted-Finance | -3.25% | ₹1.3 Cr+₹3.5 L (2.77%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹12.0 L (9.40%)Admitted-Finance | +2.99% | ₹1.4 Cr+₹12.0 L (9.40%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹14.6 L (11.5%)Admitted-Finance | +4.95% | ₹1.4 Cr+₹14.6 L (11.5%) | L4 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
1 Jun 2026, 6:00 pmClosed
Superintending Engineer, PWD Circle Dausa
Office of the SE, PWD Circle Dausa
CONSTRUCTION OF ATAL PRAGATI PATH FROM GOVT. UPPER MIDDLE SCHOOL BILONA KALLAN TO PRAJAPAT MOHALLA, LADDU PRAJAPAT HOUSE VIA KABRISTAN, PAANI KI TANKI
2026_CEPWD_562124_3
NIT 02/2026-27 SE PWD Circle Dausa
Open Tender
Civil Works - Roads
Percentage
120 days
Under Jurisdiction of Dn. Lalsot
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Through online EGras Challan Office ID 41076
₹2.9 L
Yes
9 Jun 2026
23 May 2026
2 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A : ROAD WORK
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRTH Specification Clause 201. . By Manual Means | 0.72 | P.Hect. | 6,700 | ₹4,824 |
| - | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means | 52.5 | P.Cum | 69 | ₹3,622.5 |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 4,241.25 | P.Cum | 44 | ₹1,86,615 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. (i) For Grading I Material | 1,388.03 | P.Cum | 461 | ₹6,39,881.83 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Mechanical Means | 600.19 | P.Cum | 1,002 | ₹6,01,390.38 |
| - | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 178.75 | P.Cum | 2,418 | ₹4,32,217.5 |
| - | Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 80 mm as per drawings and as per IS 15658:2006.and all materials shall conform to MoRTH Specification Clause 602 with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks. Category 'B' : Dentated only two side like I,Z,T shape as per IRC:SP:63-2004 | 1,600 | p.sqm | 781 | ₹12,49,600 |
| - | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) | 1,675.5 | P.Cum | 4,811 | ₹80,60,830.5 |
| - | Providing and Fixing of Dowel Bars and Tie Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 999.99 | P.Kg | 66 | ₹65,999.34 |
| - | PART - B : DRAIN WORK
Excavation for Structures Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 622.08 | P.Cum | 137 | ₹85,224.96 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 3.22 MB
Bid_Atal_Path_Bilona_Kala.pdf
Tender Documents • 8.67 MB
BOQ_1000262.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .