| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.8 Cr+₹70.4 L (17.1%)Admitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹4.8 Cr+₹70.4 L (17.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | - | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | K S CONSTRUCTION L2 | H.Venkateswaran L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing juliflora Jungles without uprooting including cost of all labour, lead,lift,and away from the site etc., complete as directed by Engineer at site. | 21,328 | m2 | 8 ₹1,70,624 | 7 ₹1,49,296 Lowest |
| 2.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand , silt or other loose soil, wet sand or silt not under water,light black cotton soil, sandy loom and ordinary soil including excavated earth | 2,591 | m3 | 150 ₹3,88,650 Lowest | 200 ₹5,18,200 |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 73.5 | m3 | 2,000 ₹1,47,000 | 600 ₹44,100 Lowest |
| 4.00 | Providing and laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation concrete including cost of all labour, materials, lead, lift, curing etc., complete | 73.5 | m3 | 6,800 ₹4,99,800 | 4,000 ₹2,94,000 Lowest |
| 5.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (Without form work) | 213 | m3 | 8,500 ₹18,10,500 Lowest | 9,000 ₹19,17,000 |
| 6.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (With form work) | 190.5 | m3 | 11,000 ₹20,95,500 | 9,100 ₹17,33,550 Lowest |
| 7.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBG metal for Cast in situ / Cover slab including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. | 59 | m3 | 20,000 ₹11,80,000 | 9,500 ₹5,60,500 Lowest |
| 8.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.comlete | 29.5 | MT | 90,000 ₹26,55,000 | 60,000 ₹17,70,000 Lowest |
| 9.00 | PCC 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With out form work | 109 | M3 | 6,500 ₹7,08,500 | 5,500 ₹5,99,500 Lowest |
| 10.00 | PCC 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work | 86 | M3 | 10,000 ₹8,60,000 Lowest | 10,000 ₹8,60,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
25 Jul 2023, 2:30 pmClosed
CE/TP-I/CHN
Guindy 230kV GIS SS Campus, Guindy, Chennai -32
Supplying,fabrication, erection of 230 KV lattice equipment structures ,gravel filling ,construction of cable duct and allied civil works in proposed 230/110 KV SS at Vembakkam in Villupuram Operation circle
2023_EB_329888_1
TP1-15/2023-24
Open Tender
Civil Works - Others
Works
120 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.9 L
Yes
21 Aug 2023
20 Jun 2023
26 Jul 2023
20 Jun 2023
25 Jul 2023
20 Jun 2023
Amount
Clearing juliflora Jungles without uprooting including cost of all labour, lead,lift,and away from the site etc., complete as directed by Engineer at site.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand , silt or other loose soil, wet sand or silt not under water,light black cotton soil, sandy loom and ordinary soil including excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Providing and laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation concrete including cost of all labour, materials, lead, lift, curing etc., complete
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (Without form work)
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (With form work)
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal for Cast in situ / Cover slab including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.comlete
PCC 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With out form work
PCC 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work
Brick work in CM 1:5 (one cement & five sand) using bricks of size 230*110*70mm including finishing, curing etc. complete complying with standard specification
Plastering with cm 1:5 mix using 12mm thick for inside and outside walls, plinth protection including cost of all materials,labour,lead, lift etc complete
Fabrication and supplying of Foundation bolt threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 3 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including all material, labour, lead, lift etc., complete (20 mm dia 1750 mm length)
Assembling of template for all Structures including cost of template, transport charges all labour lead, lift, etc, complete.
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection, cost of lead lift labour etc complete.
Painting 2 coats Exterior Emultion Painting two coats with approved quantity White cement over a waterbase primer as priming coat, including cost of all materials, labour, lead, lift, T&P, etc. complete.
Supplying and layling of PVC pipe with required PVC bend T&L bend, union including cutting, jointing where ever necessary earth work excavation refilling necessary fittings, all materials etc., complete. - 40mm Dia
Supplying and layling of PVC pipe with required PVC bend T&L bend, union including cutting, jointing where ever necessary earth work excavation refilling necessary fittings, all materials etc., complete. - 32mm Dia
Supplying and layling of PVC pipe with required PVC bend T&L bend, union including cutting, jointing where ever necessary earth work excavation refilling necessary fittings, all materials etc., complete. - 25mm Dia
Supplying and fixing gun mental value including cost of materisl, labour, lead, lift etc., complete. - 32 mm Dia
Supplying and fixing gunmental value including cost of materisl, labour, lead, lift etc., complete. - 25 mm Dia
Supplying & fixing chain link fencing 50 x 50 mm square (12G) of 1.80m ht including cost of GI binding wire all materials transport, labour, lead and lift etc., complete.
Providing and laying Granular sub base with quarry dust of good grade of material for 300 mm thick to give CBR of 10 on prepared sub grade in accordance with 25 % of quarry dust and 20% of Gravel for filling the voids including cost and conveyance of materials, labour charges for spreading and consolidated by power roller to the requirement of departmental officers.
Providing and laying Wet Mix Mecadam base course of 250 mm compacted thickness in two layers of 75mm thick or else as specified on the proposed sub base with graded stone aggregate and granular materials of quantity size and grading in layers as specified including mixing in base mix plant, spreading in ununiform layer with motor grader and compaction with vibrating rollers of 80 to 100 KN static weight and fine dressing to required grade and cross slope as shown on the drawing equipment as per Techinical Specification Clause 406.
Providing and laying Dense Bituminous Macadam of 50 mm consolidated thickness using % of 80/100 grade bitumen per clause 508 of MORTH specification
Providing and laying Semi Dense Bituminous Concrete 25 mm consolidated thickness using % of 80/100 grade bitumen per clause 508 of MORTH specification
Providing and laying Prime Coat over WMM surface using 6 kgs. Of bitumen emulsion for 10 sqm. Area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat bybitumen sprayer etc., complete as per clause 502 of MORTH specification.
Providing and laying Tack Coat over PC with WMM surface treated with prime coat using 2.5 kgs. Of emulsion for 10 sqm. area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MORTH specification.
Supplying and filling with well gravel in basements in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Filling with stone dust including cost of metal, labour all lead and lift etc., Complete.
Filling with 20 mm B.G metal including cost of metal, labour all lead and lift etc., Complete.
Supplying, fabrication and transporting of various equipments lattice structure including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Supplying, fabrication and transporting of various size of ISI GI Bolt&Nut with washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K S CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .