| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹1.8 L (1.25%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.4 Cr+₹1.8 L (1.25%) | L2 | Rejected-Finance Being other than lowest |
| 3 | L3₹1.5 Cr+₹6.9 L (4.80%)Rejected-Finance 1 2 GR FLOOR VITHALKUNJ NO 3 V P ROAD ANDHERI WEST MUMBAI 400 058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | ₹1.5 Cr+₹6.9 L (4.80%) | L3 | Rejected-Finance Being other than lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Three Class below |
| 5 | Rejected-Technical FLAT NO 404 A WING HILL SIDE RESIDENCY BEHIND KIRTI POLICE SOCIETY KATRAP BADLAPUR EAST DIST THANE MAHARASHTRA 451503 | 451503 | - | - | Rejected-Technical Three Class below |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
29 Dec 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR REPLACEMENT OF CENTRAL AIR CONDITIONING PLANTS AND COLD STORAGE PLANTS INSTALLED AT VARIOUS LOCATION INCLUDING MANNING AND OPERATION COMPREHENSIVE MAINTENANCE UNDER GE NW KUNJALI COLABA MUMBAI 2ND CALL
2022_MES_559357_2
8518/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) KUNJALI
Class B
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Kunjali
₹2.2 L
Yes
27 Jan 2023
1 Dec 2022
31 Dec 2022
1 Dec 2022
29 Dec 2022
15 Dec 2022
1 Dec 2022 - 13 Dec 2022
Amount
PART - I (COMPREHENSIVE MAINTENANCE) Comprehensive Maintenance of Central AC Plants to maintaining record periodical minor maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except for major repair and spare parts of central AC plants 4 x120 TR capacity Make Voltas, Model 5H120 installed at Naval Dockyard (C.NO.51/Wecors,Gr. floor, East Wing run at a time two compressors and other two and one are stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the following items fitting/ fixtures/ device components for operation daily except Sunday and Holiday Compressor make-Voltas,model 5H120 - 04Nos Compressor motor make- HBB capacity 150 HP - 04Nos. Condenser water pump and Chiller pump set mono block make Kirloskar capacity 25 HP/ 18.5 KW - 06 Nos. Air handling unit with blower motors -02 Nos. AHU motor 25HP make HBB-02Nos. (f) Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve VVE-100, thermostat solenoid valves HP/LP/OP cuts out with panel board incl installed gauges-01 Set of Each Digital type thermometer-01Set of Each Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-02Sets (l) Condensor MS piping 100/125/300mm with gate valve/sluice valves, pressure gauge, temperature gauge complete-06Sets
Comprehensive Maintenance of Central AC Plants to maintaining record periodical minor maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except for major repair and spare parts of central AC plants 3x 175 TR Make Accel Model SMC-12-100 installed at Naval Dockyard (C.NO.51/Wecors,Gr. floor,West Wing run at a time two compressors and other two and one are stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the following items fitting/ fixtures/ device components for operation daily except Sunday and Holiday including taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge Compressor make-Accel,model SMC-12-100 - 03Nos Compressor motor HBB 220 HP - 03 Nos. Condenser/ Chiller water pump set mono block, Make Kirloskar, capacity 30 HP (each) - 06 Nos. Air handling unit with blower motors -02 No. AHU motor 30HP-01No. (f) Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve MVE68, thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set of Each Digital type thermometer-01Set of Each Air supply duct with grill diffusers, dampers and Re & Pre heater etc. complete-02Sets (l) Condensor MS piping 300/100mm with sluice valves, Butter fly valve (Avoco), water pressure gauge, temperature gauge complete
Comprehensive Maintenance of Central AC Chiller Plant 3x 100 TR capacity (C.NO.54/Wecors, Main bldg 1st Phase, Gr. floor, East Wing run at a time two compressors and other one is stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the following items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge Compressor make Blue Star - 03 Nos. Compressor motor ABB 60HP- 03 Nos. Condenser & Chiller water pump set mono block 15 HP & 25 HP - 02 & 02 Nos. at C. No 54 /Wecors Main Bldg, Ph-I Ground Floor, East Wing Air handling unit with blower motor 10HP-01 No. AHU motor 15HP ABB-01No. (f) Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set (l) Condensor MS piping 300mm/125mm/100mm with sluice valves/ butter fly vaves, pressure gauges, temperature gauges complete
Comprehensive Maintenance of Central AC Plant capacity 80 Ton (4x 20 TR capacity) at Naval Dockyard C. No 51 /Wecors ARF Bldg, Ventillation Plant at Terrace , run at a time three compressor and other one is stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the following items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge Compressor make Blue Star - 04 Nos. Compressor motor HBB -02 Nos. Condenser water pump set mono block 15 HP - 02 Nos. AHU motor 18.5HP HBB-02 Nos. Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set Complete. Control devices such as expansion valve thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set of Each Digital type thermometer-01Set of Each Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-02Sets Condensor MS piping 80mm with sluice valves, pressure gauge, temperature gauge complete-02Sets
Comprehensive Maintenance of Central AC Chiller Plant 6x 135 TR capacity, Make : York at C. No 51 /Wecors ARF Bldg, Chiller Plant run at a time three compressors and other are stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge:- Compressor make York, model JS-63FQ508 - 06 Nos. Compressor motor (in built) - 03 Nos. Condenser & Chiller water pump set mono block, make Kirloskar, capacity 15 HP each - 02 & 02 Nos. at C. No 51 /Wecors ARF Bldg, Chiller Plant Air handling unit with blower motor 15HP-01 No. AHU motor make ABB (f) Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valves VVE-70 (Sporlan) thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set (l) Condensor MS piping 300mm/125mm/100mm with sluice valves, water pressure gauges, temperature gauges complete
Comprehensive Maintenance of 03 Nos Central Chiller AC Plants 3x 25.4 TR capacity each plant at C. No 43 /MECI Plant No 1, 2 & 3 IInd Floor run at a time two compressors and other one is stand by of each plants for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make Blue Star - 3x 03 Nos.= 09 Nos ( 03Nos plants) Compressor motor inbuilt Condenser & Chiller water pump set mono block, Kirloskar capacity 3 HP- 03 Nos. each at C. No 43 /MECI Plant No 1, 2 & 3 IInd Floor Air handling unit with blower motor capacity 5.5HP-01 No each plant. AHU motor 15HP ABB-01No. (f) Cooling tower induced draft type -01No each plant. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set each plant. Control devices such as expansion valve TGEX-11 Danfoss, thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set each plant. Digital type thermometer-01Set each plant. Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set each plant. (l) Condensor MS piping 80mm/100mm with sluice valves/ butter fly valves, pressure gauges, temperature gauges complete-each plants
Comprehensive Maintenance of Central AC Plants 3x 30 TR capacity each at C. No 29 /MAST 3rd Floor run at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed: Compressor make ACCEL model SMC6-65 - 03 Nos. Compressor motor 50HP- 03 Nos. Condenser & Chiller water pump set mono block 7.5 HP 02 Nos each. at C. No 29 /MAST 3rd Floor Air handling unit with blower motor 7.5HP-01 No. Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve, thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 80mm/100mm with sluice valves/butter fly vaves, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Central Chiller AC Plants 3x37.7 TR capacity each at C. No 25 /MOUT run at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor Sealed make Blue Star - 06 Nos. Compressor motor inbuilt Condenser and chiller water pump set mono block 10 HP and 7.5 HP - 02 Nos. each at C. No 25 /MOUT Air handling unit with blower motor 10 HP-01 No. Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valveTGEX-11 Danfoss thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 80/100mm with sluice valves/gate valves, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Central AC Plants installed at C. No 32 /MDAG (Main Office)1st Floor periodical maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except for major repair and spare parts of Central AC Plants 3x 40 TR capacity Make Blue Star run at a time two units of eah plant and other two and one are stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the following items fitting/ fixtures/ device components for operation daily except Sunday and Holiday including taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make-Blue Star,model - 03Nos Compressor motor make- in built Condenser and chiller water pump set mono block 5 HP &3.5KW - 02 Nos. each at (C. No 32 /MDAG) Air handling unit with blower motor -01 Nos. (10HP-01). Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valveTGEX-11 Danfoss thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges complete Set of each plant Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 50mm/80/100mm with sluice valves/butter fly/gate valves, pressure gauges, temperature gauges complete-01Sets
Comprehensive Maintenance of Package AC plant installed at Test House of C. No 32 /MDAG run except including periodical maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except for major repair and spare parts of 3x 7.5 TR Make Blue Star Model PAW run at a time two units of eah plant and other two and one are stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the following items fitting/ fixtures/ device components for operation daily except Sunday and Holiday in including taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make copland - 06 Nos. Condenser water pump set mono block 2.2KW - 02 Nos. at C. No 32 /MDAG (Test House) Blower motor 2.0 HP-03 No. Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. (f) Control devices such as expansion valve thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 50mm with sluice valves/Gate Valve, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Package AC Plants 2x 7.5 TR capacity at C.No 48 /MEPS Ist Floor Near SSK (one & two units run at a time of both plant and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make copland - 04 Nos Condenser water pump set mono block 2.2 KW 02 Nos. at C.No 48 /MEPS Ist Floor Near SSK Air handling unit with blower motor 2.5 HP-05 No. Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. (f) Control devices such as expansion valve thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 50mm with sluice valves, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Package AC Plants 3x 15 TR capacity at C.No 48 /MEPS Ist Floor Near Workshop (one & two units run at a time of both plant and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make copland - 06 Nos. Condenser water pump set mono block 2.2KW - 02 Nos. at C.No 48 /MEPS Ist Floor Blower motor 2.0 HP-03 No. Cooling tower induced draft type -01No. Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. (f) Control devices such as expansion valve thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 50mm/80mm with sluice valves/Gate Valve, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Central AC Plants 3x 10 TR capacity each at C. No 36 /MRAC (Instrumentation Bay) Ground Floor, two units run at a time (two compressors and other one is stand by) of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operationdaily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make ACCEL, model SMC4-65 - 03 Nos. Compressor motor 10 HP- 03 Nos. Condenser water pump set mono block 5 HP 02 Nos. at C. No 36 /MRAC (Instrumentation Bay) Ground Floor Air handling unit with blower motor 5 HP-01 No. Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve HVE11-100, thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 50mm/80mm with sluice valves/butter fly valves/ Gate valves, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Central AC Plants 3x 15 TR capacity each at C. No 33 /MDAG (GT fuel & Pressure Test Bay)1st Floor, two units run at a time (two compressors and other one is stand by) of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make ACCEL model SMC4-65- 03 Nos. Compressor motor 10 HP- 03 Nos. Condenser water pump set mono block 5 HP 02 Nos. at C. No 33 /MDAG (GT fuel & Pressure Test Bay) 1st Floor Air handling unit with blower motor 5 HP-01 No. Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 50mm/80mm with sluice valves/butter fly valves/ Gate valves, pressure gauges, temperature gauges complete-02Sets
Comprehensive Maintenance of Central chiller type AC Plant 2X 40TR capacity each at C. No 51 /Wecors Main Slog, Phase - 1, Ground Floor run in single shift daily for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation daily except Sunday and Holiday taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- Compressor make Accel - 02 Nos. Compressor motor 37KW/ 50HP- 02 Nos. Condenser water pump and chiller water pump set mono block, make Kirloskar, capacity 7.5 HP of each 04 Nos. at C. No 51 /Wecors Main Slog, Phase -1, Ground Floor Air handling unit with blower motor 10HP-01 No. Cooling tower induced draft type -01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCBs, MCBs voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as expansion valve MVE-42 (Sporlan), thermostat solenoid valves HP/LP/OP cuts out with panel board installed gauges-01 Set Digital type thermometer-01Set Air supply duct with grill diffusers, dampers and Re&Pre heater etc. complete-01Set Condensor MS piping 80mm/100mm with sluice valves/ butter fly valves, water pressure gauges, temperature gauges complete
PART-II (Manning and operation) Manning & operation of Central chilled water type AC plant 02 Nos x 15 TR and run in three shifts per day (each shift 08 hrs) (one running & one standby) operated by one Refg Mech in each shift including maintaining record periodical minor maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except for major repair and spare parts of central AC plant Make :- Voltas Model No ACC WC03000 MNT at COMCEN REAR ACPLANT AT INS Angre complete with cooling tower AHU & other accessories including maintain cleaness of AC plant for 24 hours run daily in three shifts (06.00 hrs to 14.00 hrs, 14.00 hrs to 22.00 hrs and 22.00 hrs to 06.00 hrs) including Sundays and Holidays consisting of followings:- ( 3 shift x 11 month = Total 33 shifts)
Compressor Make :- Voltas Model No ACC WC03000 MNT -02 Nos. Compressor motor 15 HP-02 Nos. Condenser/ chiller water pump set mono block 3HP-04Nos. Air Handling Unit with blower motor -01No. FRP Cooling tower with CT Fan- 01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCB's,Voltmeter, Ammeter, Motor Starters etc. complete-01 Set. Control devices such as expansion valve thermostat solenoid valves HP/ LP/ CP cut outs with panel board installed gauges-01Set Digital type thermometer-01Set Air supply duct with grill diffusers dampers and heater etc. complete-01Set Condensers and Condenser piping, Chilled water piping lines 100/80/50mm with valves, water pressure gauge and water temperature gauge complete-01Set
Manning & operation of following 02 Nos (two in numbers) Central AC Plants TPW and NAD run in one shift per day (shift 08 hrs) each installation operated by one Refg Mech including maintaining record periodical minor maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except for major repair and spare parts of central AC plants at TPW, NAD A-63 Building Naval Dockyard including daily cleaning of AC plants complete with cooling tower AHU & other accessories for 08 hours run daily in one shift of both plants including Sunday and Holidays from 0900 hrs to 1700 hrs. Plants detail as following:-( 1 shift x 11 month = Total 11 shifts)
NAD AC PLANT :- 02 Nos x 40 TR, Make :- Voltas Model No ACC WC04000 MNT Compressor Make Voltas Model No ACC WC04000 MNT -02 Nos. Compressor motor 60HP-02Nos. Condenser/ chiller water pump set mono block -04Nos. Air handling unit with blower motor -01No. FRP Cooling tower with CT Fan- 01No. (f) Electrical control panel cubical type floor mounted with main switch MCB's voltmeter, Ammeter, Starter condenser etc. complete-01 Set. Control devices such as expansion valve thermostat solenoid valves HP/ LP/ CP cut outs with panel, panel board installed gauges-01Set Digital type thermometer-01Set Air supply duct with grill diffusers dampers and re-heater, pre-heaters etc. complete-01Set Condensers and Condenser piping, Chilled water piping lines 100/80/50mm with valves, water pressure gauge and water temperature gauge complete-01Set
TPW AC PLANT:- 2 Nos. x 50 Ton, Make: Voltas, model No. AC WC05000MNT Compressor model No. ACCWC05000MNT-02Nos. Compressor motor 60HP-02Nos. Condenser / chiller water pump set mono block 7.5HP-04Nos. Air handling unit with blower motor 15HP-01No. FRP Cooling tower 60TR with CT Fan-01No. (f) Electrical control panel cubical type floor mounted with main switch MCB's voltmeter, Ammeter, Starter condenser etc. complete-01Set. Control devices such as expansion valve thermostat solenoid valves HP/LP/CP cut outs with panel board installed gauges -01Set Digit type thermometer-01 Set. Air supply duet with grill diffusers dampers and heater etc. complete-01Set. Condensers and Condenser piping, Chilled water piping lines 100/80/50mm with valves, water pressure gauge and water temperature gauge complete-01Set
Manning and Operation of central AC chilled water plast 03 Nos x 35 TR (Two running & one Standby) Total 70 TR Make: Voltas, model No. AC WC06000MNT at COMCEN FRONT INS ANGRE Complete including maintaining cleaness of AC plant with cooling tower AHU & other accessories for 24hours run daily in three shift, each shift 08 hour (06:00 hrs to 14:00 hrs, 14:00 hrs to 22:00 hrs & 2200 hrs to 0600 hrs) including Sundays and Holidays consisting of following :- ( 3 shifts x 11 month = Total 33 shifts)
(a) Compressor model No. ACCWC06000MNT 02 Nos. (b) Compressor motor 75 HP-02 Nos. (c) Condenser/ chiller water pump set mono block 7.5HP-04 Nos. (d) Air Handling unit with blower motor-01 No. (e) FRP Cooling tower 60TR with CT Fan-01 No. (f) Electrical control panel cubical type floor mounted with main switch, MCCB's, Voltmenter, Ammeter, Starters, condenser etc. comple-01 Set. (g) Control devices such as thermostatic expansion valve, thermostats, solenoid valves HP/LP/CP cut outs with panel board installed gauges -01 Set. (h) Digital type thermometer-01 Set. (j) Air supply dust with grills, diffusers, dampers nd heaters etc. complete-01 Set. (k) Condensers and Condenser piping, Chilled water piping lines 100/80/50 mm with valves, water pressure gauge and water temperature gauge complete-01 Set.
Manning & operation of Central AC Plants in one shift per day (shift 08 hrs) operated by one Refg Mech including maintaining record periodical minor maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except major repair and spare parts of central AC plant CCDT(B) Naval Dockyard complete of 02 Nos x 7.5 TR capacity (Make : Kirloskar Model AK- 3) with cooling tower AHU and other accessories (one running and one standby) for single shift of 08 hrs daily from 0900hrs to 1700hrs including Sundays & Holidays including maintain cleaness of AC plant all as specified and directed by Engineer- in-charge. ( 1 shift x 11 month = Total 11 shifts)
Compressor make Kirloskar model AK-3 - 02Nos. Compressor motor 10HP-02Nos. Condensor water pump set mono block 3.0HP-02Nos. Air Handling Unit with blower motor-01No. FRP Cooling tower 10TR capacity with CT fan-01No. (f) Electrical control panel cubical type floor mounted with main switch MCCB's, Voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as thermostatic expansion valve, solenoid valves HP/ LP/ CP cut outs with panel board installed gauges-01 Set. Digital type thermometer-01 Set. Air supply duct with grill diffusers dampers and heaters etc.complete-01Set. Condensers and Condenser piping, Chilled water piping lines 80/50mm with valves, water pressure gauge and water temperature gauge complete-01Set
Manning & operation of Central AC Plant in one shifts per day (each shift 08 hrs) operated by one Refg Mech in each shift including maintaining record periodical minor maint/ repairs (ie daily check, monthly, quarterly and half yearly) with all consumable parts except major repair and spare parts of central AC plants condensing unit complete of 3 Nos. x 40 Ton (two running & one standby ) (Make :- Voltas, Model No. ACWCURO0400MNT at MWC building No.173 (ND) including maintain cleaness of AC plant complete with cooling tower AHU & other accessories run for one shifts daily from (0900hrs to 1700hrs) including Sundays & Holidays (1 shift x 11 month = Total 11 shifts)
Compressor model ACWCURO0400MNT- 03Nos. Compressor motor 50HP-02Nos. Condensor water pump set mono block 7.5HP-02Nos. Air Handling Unit with blower motor-01No. FRP Cooling tower 80TR capacity with CT fan-01No. Electrical control panel cubical type floor mounted with main switch MCCB's, Voltmeter, Ammeter, Starters etc. complete-01Set. Control devices such as thermostatic expansion valve, solenoid valves HP/ LP/ CP cut outs with panel board installed gauges-01 Set. Digital type thermometer-01 Set. Air supply duct with grill diffusers dampers and heaters etc.complete-01Set. Condensers and Condenser piping, Chilled water piping lines 100/80/50mm with valves, water pressure gauge and water temperature gauge complete-01Set
Manning and Operation of Walk in Cooler ( Mutton Point CG Complex ) running round the clock in ( three shifts) each shift of 08 hour ( 06.00 hrs to 14.00 hrs, 14.00 hrs to 22.00 hrs and 22.00 hrs to 06.00 hrs) daily including Sundays and Holidays including maintaining cleaness of AC plant of the following plants :- ( 3 shift x 11 month = Total 33 shift)
03 Nos cabinet/ rooms of Walk in cooler consisting total 09 Nos refrigeraion units having capacity of each unit 2TR driven single phase, Emerson hermetically sealed compressor units model CR-1010 BCU10 ( 02 running & one standby in each walk in cooler room) for maintain the temperature range 08° C to 12°C RH 60% for eggs room. Make: Blue Star 02 Nos Walk in cooler having refrigerant unit 06 Nos x 10TR each three phase hermetically sealed compressor Model LC-2120 (02 Nos running and one stand by in each walk- in- cooler) for maintaining the temperature range (-) 18°C to (-) 20°C RH 50% for fish/ mutton/ chicken room Make :- Blue star
Manning and Operation of central AC chilled water plant 02Nos x 50 TR (one running & one standby) Total 50 TR make: Voltas, model No. AC WC06000MNT at MOC INS ANGRE complete including maintaining cleaness of AC plant with cooling tower AHU & other accessories for 24 hours run daily in three shift, each shift 08 hour ( 06.00 hrs to 14.00 hrs, 14.00 hrs to 22.00 hrs and 22.00 hrs to 06.00 hrs) including Sundays and Holidays consisting of followings:- ( 3 shift x 11 month = Total 33 shift)
Compressor model No. ACCWC06000MNT-02Nos. Compressor motor 75 HP-02Nos. Condenser / chiller water pump set mono block 7.5HP-04Nos. Air Handling unit with blower motor -01No. FRP Cooling tower 60TR with CT Fan-01No. (f) Electrical control panel cubical type floor mounted with main switch, MCCB's, Voltmeter, Ammeter, Starters, condenser etc. comple-01Set. Control devices such as thermostatic expansion valve, thermostats, solenoid valves HP/LP/CP cut outs with panel board installed gauges -01Set. Digital type thermometer-01 Set. Air supply duct with grills, diffusers, dampers and heaters etc. complete-01Set. Condensers and Condenser piping, Chilled water piping lines 100/80/50mm with valves, water pressure gauge and water temperature gauge complete-01Set
Part- III (Repair & Replacement ) Pumping down the compressor and transfer existing refrigerent gas complete for overhauling of compressor reciprocating open type model FK - 4 Kirloskar Make 2 x 7.5 TR Capacity, dismantling complete assembly & replacing of minor unserviceable parts including machining of crank shaft boring polishing etc replacing of gaskets packing reassembly and recharging of pumped down refrigerant & topping up if required to maintain the required standing pressure charging of compressor oil complete testing for smooth functioning etc.at CCDT ND (Note : Major spare parts, compressor oil and refrigerant gas for topping up will be paid separately )
All as per item No 23 above but for 2 x 60TR AC Plant at MOC INS ANGRE of compressor model no:5H60 Voltas complete all as specified & as directed by Engineer-in-Charge
All as per item No 23 but for 2 x 50TR AC Plant at NAD A-63 Naval Dockyard of compressor model no:5H60 Voltas complete all as specified & as directed by Engineer-in-Charge
All as per item No 23 but for 3 x 30TR AC Plant at COMCEN INS ANGRE of compressor model no:5F20 Voltas complete all as specified & as directed by Engineer-in-Charge
All as per item No 23 but for 3x 40TR AC Plant at MWC Bldg No 173 (ND) of compressor model no:5H60 Voltas complete all as specified & as directed by Engineer-in-Charge
All as per item No 23 but for 2 x 15 TR AC Plant at COMCEN REAR INS ANGRE of compressor model No 5H40 Voltas complete all as specified & as directed by Engineer-in-Charge
Material and labour for cleaning of cooling coil section of AHU for descaling and providing 02 Nos.15mm Tee outlet for local circulation of MAIC solution in the cooling coil (separate container and pump set of appropriate capacity to be used for circulation) pH value of solution to be kept at 4 & checked at an interval of 01 hr. duration process the scalgum / WS / Cleansol or equivalent solution to be used for descaling if ph value remains less than '7' flush with fresh water added to sodium carbonate till pH value attains '7' refix the coil section in position minor repairs to be carried out in AHU Coil bins to be cleaned by scalgum solution by spraying the solution with washing pump up to required level, AHU and complete all as specified and directed for the followings :-
AHU of 2 x 50TR Capacity AC Plant at NAD A-63 Naval Dockyard complete all as specified & as directed by Engineer-in-Charge
AHU of 2 x 60TR Capacity AC Plant at MOC INS ANGRE complete all as specified & as directed by Engineer-in-Charge
AHU of 3 x 30TR Capacity AC Plant at COMCEN INS ANGRE complete all as specified & as directed by Engineer-in-Charge
AHU of 2 x 15 TR Capacity AC Plant at COMCEN REAR INS ANGRE complete all as specified & as directed by Engineer-in-Charge
Dismantling AHU of 2 x 60TR TR capacity AC plant carefully by removing side and top panel removing unserviceable blower shaft bearings,removing motor & blower assembly, replacement of new AHU blower shaft bearings reassembling blower assembly and refixing electric motor & top side panel in original position with new nut bolts washers & shafts keys & checking the shafts balancing & testing for smooth running all as specified and directed at MOC INS ANGRE.
All as per item No 25 but for 2 x 50TR AC Plant at NAD A-63 Naval Dockyard.
All as per item No 25 but for 3 x 30TR AC Plant at COMCEN INS ANGRE
All as per item No 25 but for 2 x 7.5 TR AC Plant at CCDT(ND)
All as per item No 25 but for 3x 40TR AC Plant at MWC Bldg No 173(ND)
All as per item No 25 but for 6x 7.5 TR AC Plant at A - 14 Bldg (ND)
All as per item No 25 but for 2 x 15 TR AC Plant at COMCEN REAR INS ANGRE .
Material and labour for dismantling cooling tower by removing CT Fans, sprinklers, PVC filler and clean cooling tower body by removing scale , dust, dirt and refix PVC filler by cleaning with diluted HCL solution reassembling, connecting , cleaning external surface and applying two coats of approved synthetic enamel paint including writing SM number/ marking and testing etc. complete all as specified and directed for the following capacity cooling towers for the following :-
Cooling tower of 3 x 30 TR Capacity at COMCEN INS ANGRE
Cooling tower of 2 x 50 TR Capacity at NAD A-63 Naval Dockyard
Cooling tower of 6 x 7.5 TR Capacity at A - 14 (Naval Dockyard)
Cooling tower of 3 x 40 TR Capacity at MWC Bldg. No. 173.(Naval Dockyard)
Cooling tower of 2 x 15 TR Capacity at COMCEN REAR INS ANGRE .
Supply and fix in replacement of unserviceable / worn-out 'V' Belt of AHU's of Make Fenner/Dunlop/ Nerlon or as approved by GE
Supply and fix in replacement of unserviceable / worn-out rubber coupling suitable for compressor shaft and motor shaft complete all as specified & as directed by Engineer-in-Charge Make Fenner /Dunlop/ Nerlon or as approved by GE
Taking out old unserviceable 2 x 15 TR Delta make cooling tower fills sheets from the site and supply and fix new fibre fills sheet of same size for cooling tower as per the existing at site and complete all as specified & as directed by Engineer-in-Charge at COMCEN REAR INS ANGRE.
Taking out old unserviceable 3x30 TR Delta make cooling tower fills sheets from the site and supply and fix new fibre fills sheet of same size for cooling tower as per the existing at site and complete all as specified & as directed by Engineer-in-Charge at COMCEN INS ANGRE.
Taking out old unserviceable cooling tower fills sheets of 2X50 TR from the site and supply and fix new fibre fills sheet of same size for cooling tower as per the existing at site and all as specified and directed at NAD A-63 Naval Dockyard
Taking out old unserviceable cooling tower fills sheets of 6x7.5 TR from the site and supply and fix new fibre fills sheet of same size for cooling tower as per the existing at site and all as specified and directed at Vajrabahu Naval Dockyard complete all as specified & as directed by Engineer-in-Charge.
Taking out old unserviceable cooling tower nozzles and supply and fix new cooling tower nozzles suitable for 3x30 TR Mihir make cooling tower as per existing at at COMCEN INS ANGRE complete all as specified & as directed by Engineer-in-Charge.
Taking out old unserviceable cooling tower nozzles and supply and fix new cooling tower nozzles suitable for 2x 60 TR Mihir make cooling tower as per existing at NAD A-63 Naval Dockyard complete all as specified & as directed by Engineer-in-Charge.
Material and labour for disconnecting condenser for descaling & plugging them & providing of 15 mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) pH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7 flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & pH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed by Engineer-in-Charge of for the following :-
Condenser of 2 x 50TR Capacity AC Plant at NAD A-63 Naval Dockyard
Condenser of 2 x 60TR Capacity AC Plant at MOC INS ANGRE
Condenser of 3 x 30TR Capacity AC Plant at COMCEN INS ANGRE
Condenser of 2 x 7.5 TR Capacity AC Plant at CCDT (ND)
Condenser of 3 x 40TR Capacity AC Plant at MWC Bldg. No. 173(ND)
Condenser of 2 x 15TR Capacity AC Plant at COMCEN REAR INS ANGRE
Material and labour for disconnecting for Chiller descaling & Plugging them & providing of 15 mm tee outlet for local circulation of mild acid solution in the Chiller (separate container and small pump set to circulate diluted acid solution to be used) pH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7, flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & pH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed by Engineer-in-Charge of for the following :-
Chiller of 2 x 50TR Capacity AC Plant at NAD A-63 Naval Dockyard
Chiller of 2 x 60TR Capacity AC Plant at MOC INS ANGRE
Chiller of 3 x 30TR Capacity AC Plant at COMCEN INS ANGRE
Chiller of 2 x 15 TR Capacity AC Plant at COMCEN REAR INS ANGRE
Pumping down the existing refrigerant from the condensor and carrying out the leak test of plant with the pressure of Nitrogen gas and monoitoring for 24hrs asses leakages by brazing & replacement of necessary gasket wherever required including copper tubes of suitable size vacumizing of the plant by vaccum pump finally reharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed. (Note: Refrigerant required for topping up will be measured and paid separately under relevant items)
Rewinding of unserviceable electric motor 3 phase 50 Hz 415volt of following capacity pump set complete comprises as under :- Disconnecting & removing the electric motor from installed position including, loading, unloading and transporting to approved workshop. Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class 'F' insulation. Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continuously to check the RPM etc. to the satisfactory performance etc. complete. NOTE: Any damage caused during handling will be made good by contractor without any extra cost to department
7.5 HP Chiller / Condenser Water Pump Motor .
15 HP Chiller/Condenser Water Pump Motor.
5.0 HP Chiller/Condenser Water Pump Motor.
3.0 HP Chiller/Condenser Water Pump Motor.
10 HP Condenser/Chiller Water Pump Motor.
15 HP Compressor Motor .
60 HP Compressor Motor .
40 HP Motor.
50 HP Motor.
25 HP Motor.
Over hauling of Monoblock pump set after removing from the base plate, disconnecting from pipe line, dismantling the pump set, replacing unserviceable gland packing, gun metal bush bearing water seal applying grease etc. complete and reassembling the pump set connecting with pipe line reconnection of electric supply, including buts bolts, gaskets etc. complete testing of pumps for smooth functioning with following capacity of pumps and motors complete all as specified & as directed by Engineer-in-Charge:-
7.5 HP Chiller / Condenser Water Pump
15 HP Chiller/Condenser Water Pump
5.0 HP Chiller/Condenser Water Pump
3.0 HP Chiller/Condenser Water Pump
10 HP Condenser/Chiller Water Pump
Over hauling sevicing of electric motor after removing from the base foundation including disconnecting of electric connection and replacement of unserviceable ball bearing complete and reassembling, realignment and reconnection of electric supply complete and testing on load for smooth functioning of following capacity motors complete all as specified & as directed by Engineer-in-Charge:-
15 HP Motor .
60 HP Motor .
40 HP Motor.
50 HP Motor.
25 HP Motor.
10 HP Motor
Supply and charge refrigerant R-22 gas in AC plant system as per requirement complete all as specified & as directed by Engineer-in-Charge.
Replacement of compressor oil with new compressor oil complete all as specified & as directed by Engineer-in-Charge
Material and labour for repairs to Microprocessor of 50/60 TR Capacity chiller unit including replacing diods , transistors and wiring etc for AC Plant at NAD A-63 Naval Dockyardall complete all as specified & as directed by Engineer-in-Charge
Material and labour for Expansion valve of 50TR/60TR chiller unit including taking down old unserviceable valve complete all as specified and directed by Engineer-in-Charge .Make: Sporlon or as approved by GE
Material and labour for Expansion valve of 30/40TR chiller unit including taking down old unserviceable valve complete all as specified and directed by Engineer-in-Charge.Make: Sporlon or as approved by GE
Material and labour Expansion valve of AC plant capacity 7.5/15 TR including taking down old unserviceable valve complete all as specified and directed by Engineer-in-Charge. Make: Sporlon or as approved by GE
Taking down old unserviceable shaft seal assembly complete and Supply and fix new shaft seal assembly suitable for 60/50 TR Capacity chiller unit all as specified and directed by Engineer-in-Charge .
Taking down old unserviceable shaft seal assembly complete and Supply and fix new shaft seal assembly suitable for 30/40 TR Capacity chiller unit all as specified and directed by Engineer-in-Charge .
Taking down old unserviceable shaft seal assembly complete and Supply and fix new shaft seal assembly suitable for 15/7.5 TR Capacity chiller unit all as specified and directed by Engineer-in-Charge .
Taking down old unserviceable CI butter fly valve and supply and fix new CI Butter fly valve slim seal design with nitrile rubber lined seat with clutch lever (p10)as per IS 13095 of the following size complete all as specified & as directed by Engineer-in-Charge. Make: AUDCO/SANT as approved by GE.
Taking down old unserviceable Non Return valve and supply and fix new CI Non Return valve of the following size complete all as specified & as directed by Engineer-in-Charge.
Taking down old unserviceable Strainer of any make and size and supply and fix new Strainer of the following size complete all as specified & as directed by Engineer-in-Charge
Supply and fix Condensor safety valve suitable for chiller unit all as specified and directed by Engineer-in-Charge .
Material and labour for HP cut out including taking down old one complete all as specified & as directed by Engineer-in-Charge Make : Indofoss as approved by GE
Material and Labour for LP cut out including taking down old one complete all as specified & as directed by Engineer-in-Charge Make : Indofoss as approved by GE
Material and labour for oil pressure cut out controls for compressor including taking down old one complete all as specified & as directed by Engineer-in-Charge Make : MP 55 Indofoss as approved by GE
Removing old unserviceable power contactor and supply & fix new power contactor MNX -32 all as specified & directed by Engineer-in-Charge
Removing old unserviceable power contactor and supply & fix new power contactor MNX -40 all as specified & directed by Engineer-in-Charge
Removing old unserviceable power contactor and supply & fix new power contactor MNX-18 all as specified & directed by Engineer-in-Charge
Removing old unserviceable contactor and supply & fix new power contactor ML-2 all as specified & directed by Engineer-in-Charge
Removing old unserviceable contactor and supply & fix new power contactor ML-3 all as specified & directed by Engineer-in-Charge
Removing old unserviceable contactor and supply & fix new power contactor ML-4 all as specified & directed by Engineer-in-Charge
Removing old unserviceable contactor and supply & fix new Auxiliary contactor all as specified & directed by Engineer-in-Charge
Removing old unserviceable timer from compressor panel and supply & fix Timer 800 SD of Simens make for Compressor motor all as specified & directed.
Removing old unserviceable timer and supply & fix GT Timer of L&T make for Condenser motor complete all as specified & as directed by Engineer-in-Charge
Replacement of bimetal over load relay of range 14-23 Amps direcectly operated suitable for 10 HP motor complete all as specified & as directed by Engineer-in-Charge
Replacement of bimetal over load relay of range 9-15 Amps direcectly operated suitable for 5 HP motor complete all as specified & as directed by Engineer-in-Charge
Taking down old unserviceable AHU Blower and Supply and fix new AHU Blower complete all as specified & as directed by Engineer-in-Charge
Taking down old unserviceable AHU Blower Drum and Supply and fix new AHU Blower Drum complete all as specified & as directed by Engineer-in-Charge
Taking down old unserviceable AHU Blower shaft and Supply and fix new AHU Blower shaft complete all as specified & as directed by Engineer-in-Charge
Taking down old existing MS pipes supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc of following sizes:
Taking down old existing GI pipes supply, lay and welding GI pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc of following sizes complete all as specified & as directed by Engineer-in-Charge:
Removing the unserviceable liquid line valve of size 15 mm from the liquid line after pumping down the compressor & supply and fixing new liquid line valve 15 mm including connected works as required for smooth functioning of AC plants complete all as specified & directed by Engineer-in-Charge
Removing the unserviceable liquid line valve of size 25 mm from the liquid line after pumping down the compressor & supply and fixing new liquid line valve 25 mm including connected works as required for smooth functioning of AC plants complete all as specified & directed by Engineer-in-Charge
Removing unserviceable thermostat of central AC plant & supplying and fixing new thermostat of range 5 degrees centigrade to 25 degrees centigrade complete with all accessories complete all as specified & as directed by Engineer-in-Charge
Removing the unserviceable solenoid valve assembly 5/8" flare size and Supply and fix new solenoid valve assembly 5/8" suitable for AC plant of various capacities complete all as specified & as directed by Engineer-in-Charge
Removing the unserviceable solenoid coil and Supply and fix new solenoid coil suitable for AC plant of various capacities complete all as specified & as directed by Engineer-in-Charge
Removing the unserviceable chiller water sensor and supplying and fixing new chiller water Sensor of suitable capacity complet all as specified & directed by Engineer-in-Charge
Removing the unserviceable pressure Sensor HP / LP / OP from and supplying and fixing new pressure Sensor of suitable capacity complet all as specified & directed by Engineer-in-Charge
Removing the unserviceable pressure gauges HP / LP / OP from existing position and supplying and fixing new pressure gauge of capacity 0 to 30 Kg / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge
Removing the unserviceable water pressure gauges from water line & supplying and fixing new water meter up to pressure 0 to 7 Kg / square centimeter complete with all accessories all as specified and directed by Engineer-in-Charge
Material and labour for scraping cleaning and preparation of external surface and painting complete installation at 2 X 7.5 TR (15 TR capacity) including compressor motor piping cooling tower condenser AHU and panel Board etc with two coats of synthetic enamel paint over a coat of red oxide primer as per ENCs colour code as given including writing to SM & MES numbers complete all as per specified & as directed by Engineer-in-Charge. Location : CCDT ND
All as per item No 82 above but of 3 x 40 TR (120 TR Capacity) complete all as specified & as directed by Engineer-in-ChargeLocation : MWC Bldg. No.173
All as per item No 82 above but for 2 x 60TR (120 TR Capacity )AC Plant at MOC INS ANGRE.
All as per item No 82 above but for 2 x 50TR (100 TR Capaciry)AC Plant at NAD A-63 Naval Dockyard.
All as per item No 82 above but for 3 x 30TR (90 TR Capacity) AC Plant at COMCEN INS ANGRE .
Taking down old unserviceable AHU pre filter and Supply and fix new pre filters efficiency 90% down to particular size of 10 micron double knitted twisted polymer fabric (washable) rated with press drop of 6 mm WC, including aluminium anodized frame work of 16 SWG to be mounted in AHU filter assembly size as per existing complete all as specified & as directed by Engineer-in-Charge. Make: ASPAWYMAN/DYNA/MHP as approved by GE
Taking down old unserviceable aluminium rectangular duct grill of any size and make and supply and fix new fresh air /return air of aluminium rectangular grills complete with wooden frame work made out of II nd class hard wood, volume control damper including gasket and connected accessories complete all as specified & as directed by Engineer-in-Charge
Supply, errect and fabricated rectangular square duct made out of 24/22 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal the longitudinal joints with and including approved sealant complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable Duct insulation from any surface and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on Duct surface by using approved adhesive and sealing the joints by weather proof tape all as directed by Engineer-in-Charge.
M & L for pipe insulation, cleaning the pipe surface with steel wire brush, apply one coat of zinc chromate paint and allowed to dry, apply two coats of cold setting adhesive compound on around surface of pipe, stick expanded Nitrile 50 mm thick or nitrile sheets tightly pressed, wrapped with one layer of aluminium cladding with 26 guage AL sheet suitable for covering the surface of pipe line insulation for protection against the demage of PUF insulation slab complete for 250 mm pipe complete all as specified & as directed by Engineer-in-Charge
Ditto- all as per item No 91 above but 200 mm dia.
Ditto- all as per item No 91 above but 150 mm dia.
Ditto- all as per item No 91 above but 125 mm dia.
Ditto- all as per item No 91 above but 100 mm dia.
Ditto- all as per item No 91 above but 80 mm dia.
Ditto- all as per item No 91 above but 65 mm dia.
Ditto- all as per item No 91 above but 50 mm dia.
Ditto- all as per item No 91 above but 40 mm dia.
Suuply and fix in repairs volume control damper made out of galvanized iron or anodized aluminium with overlapping leafs to avoid any leakage from the damper as per existing at site complete all as specified & as directed by Engineer-in-Charge
Suuply and fix in repairs leather type canvas in AHU duct of any size as per existing at site complete all as specified & as directed by Engineer-in-Charge
Cleaning of Air handling ducts (GI/AL) internally by using special T&P like robrtic arm, air compressor, air jet nozzles, flipper, vaccum pump and a suction blower with hepa filter and check before and after the cleaning complete all as specified & as directed by Engineer-in-Charge
Taking down (GI/AL) or any other type pf false celling/ perforted board and material and labour new perforted sheet of size 2x2 sqft complete all as specified & as directed by Engineer-in-Charge
Manning & operation of following 02 Nos (two in numbers) Central AC Plants in one shift per day (shift 08 hrs) operated by one Refg Mech including maintaining record periodical (ie daily check, monthly, quarterly and half yearly) central AC plants (i) 4 x120 TR capacity Make Voltas, Model 5H120 & (ii) 3x 175 TR Make Accel Model SMC-12-100 installed at Naval Dockyard (C.NO.51/Wecors,Gr. floor, East Wing & West Wing) run at a time two compressors and other two and one are stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5% run for 8hrs daily except Sunday and Holiday in one shift.(i.e 0900 to 1700 Hrs) one AC plant operator( Ref/Mech) per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central AC Chiller Plant 3x 100 TR capacity (C.NO.54/Wecors, Main bldg 1st Phase, Gr. floor, East Wing run at a time two compressors and other one is stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 8hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech) per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge: ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central AC Plant capacity 80 Ton (4x 20 TR capacity) at Naval Dockyard C. No 51 /Wecors ARF Bldg, Ventillation Plant at Terrace , run at a time three compressor and other one is stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 to 1700 Hrs) one AC plant operator ( Ref/Mech) per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge: ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central AC Chiller Plant 6x 135 TR capacity, Make : York at C. No 51 /Wecors ARF Bldg, Chiller Plant run at a time three compressors and other are stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech) per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of 03 Nos Central Chiller AC Plants 3x 25.4 TR capacity each plant at C. No 43 /MECI Plant No 1, 2 & 3 IInd Floor run at a time two compressors and other one is stand by of each plants for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech) per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central AC Plants 3x 30 TR capacity each at C. No 29 /MAST 3rd Floor run at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech) per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as directed:-( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central Chiller AC Plants 3x37.7 TR capacity each at C. No 25 /MOUT run at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of following 02 Nos (two in numbers) (i) Central AC Plants 3x 40 TR capacity Make Blue Star and (ii) Package AC plant 3x 7.5 TR Make Blue Star Model PAW installed at C. No 32 /MDAG (Main Office)1st Floor & Test House of C. No 32 /MDAG run in one shift per day (shift 08 hrs) each operated by one Refg Mech except including periodical (ie daily check, monthly, quarterly and half yearly) central AC plant run at a time two units of eah plant and other two and one are stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5% run for 8hrs daily except Sunday and Holiday in one shift.(i.e 0900 to 1700 Hrs) one AC plant operator per shift and including taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of following 02 Nos Package AC Plants 2x 7.5 TR & 3x 15 TR capacity at C.No 48 /MEPS Ist Floor Near SSK & C.No 48 /MEPS Ist Floor Near Workshop (one & two units run at a time of both plant and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central AC Plants 3x 10 TR capacity each at C. No 36 /MRAC (Instrumentation Bay) Ground Floor, two units run at a time (two compressors and other one is stand by) of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% 08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central AC Plants 3x 15 TR capacity each at C. No 33 /MDAG (GT fuel & Pressure Test Bay)1st Floor, two units run at a time (two compressors and other one is stand by) of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% 08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as specified & as directed by Engineer-in-Charge:- ( 1 shift x 11 month = Total 11 shift)
Manning & operation of Central chiller type AC Plant 2X 40TR capacity each at C. No 51 /Wecors Main Slog, Phase - 1, Ground Floor run in single shift daily for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% 08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift and taking care cleaning etc any pilferage, theft or damage etc complete all as directed:- ( 1 shift x 11 month = Total 11 shift)
Note for Item No. 16,17,18,19,20,21,22,104,105,106,107,108,109,110,111,112,113,114 & 115 (i) Passes will be processed only after verification of antecedence of deployed employees and submission of verified experience certificate, Pass shall not be granted without submission of qualification proof & experience certificate. (ii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operator (iii) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (iv) AC and Installation Operator shall be available as per the shift timings specified in the tender and he will report to JE E/M in-Charge. In case of emergency he will function according to their direction. If he is found absent or move without intimating to in-Charge or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected.(v) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (v) The individual employed as operator should has minimum qualification of ITI course equivalent from state or central board
(vii) Contractor shall submit the labour licenece VAT as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (ix) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest laws/acts alongwith RAR failing which RAR will not be progressed for payment. (x) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (xi) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost of work mentioned in BOQ item No 16 to 22 & 104 to 115, i.e Rs 97,35,660.00, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (Cover No 2). The deposited amount shall be the difference between estimated cost mentioned in BOQ item No 6 to 22 & 104 to 115 (i.e) Rs 97,35,660.00 and amount quoted by lowest bidder. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall sumbit 03 Nos of BGBs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment/ release as the case may be. (xii) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working
Shree Ayyappa Engineering
Darpan Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .