Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹2,100
Closing Date
7 Mar 2026, 5:00 pmClosed
Executive Engineer,Div-II
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Garbage point at Bisinabar near MSWC-I in Ward No.37.
2026_ORULB_125571_4
MC(CMC)CTC_Div-IINo.33/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2,100
Yes
18 Sept 2026
23 Feb 2026
11 Mar 2026
23 Feb 2026
7 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation in all kind of soil within 50 m Initial lead and 1.50 m Initial lift icluding rough dressing and bracking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.30 m in depth and as per the direction of the EIC. | 33 | Cum | 300.82 | ₹9,927.06 |
| 2 | Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. | 10.34 | Cum | 613 | ₹6,338.42 |
| 3 | PCC (1:4:8) with 40 mm size CBGS metal including all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete. 38 | 10.34 | Cum | 6,034 | ₹62,391.56 |
| 4 | RCC work of M20 grade with 20 mm and down grade CBHGC including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete. 57 | 16.5 | Cum | 6,597.5 | ₹1,08,858.75 |
| 5 | Requirement of HYSD/ MS rod and labour for cutting, bending,binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. 62 | 0.99 | Qtl. | 9,398 | ₹9,304.02 |
| 6 | Rigid and smooth centering and shuttering for CC/ RCC works including false works and dismantling them after casting including cost of materials complete Etc. | 13.56 | Sqm | 248.9 | ₹3,375.08 |
| 7 | Transporting the excavated earth by Mechanical means within 5.00 km lead including initial lead and lift, loading & unloading etc all complete. 20 | 29.7 | Cum | 276.01 | ₹8,197.5 |
stage.html
html • 0.03 MB
finance_582527.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 2.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_582527.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .