Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17,146Accepted-Finance | ₹17,146 | 1 | Accepted-Finance L1 |
| 2 | 2₹45,919+₹28,773 (167.8%)Accepted-Finance | ₹45,919+₹28,773 (167.8%) | 2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
16 Apr 2021, 4:00 pmClosed
EX ENGINEER
EX ENGINEER ED KISHTWAR
pl refer tender doc
2021_PDD_121753_1
ENIT NO.30 OF 2021-22
Open Tender
Electrical Works
Item Rate
365 days
ED KISHTWAR
refer SBD
3 documents required · 3 mandatory
₹1,000
EX ENGINEER ED KISHTWAR
₹60,000
2 May 2021
5 Apr 2021
17 Apr 2021
5 Apr 2021
16 Apr 2021
5 Apr 2021
5 Apr 2021 - 16 Apr 2021
Amount
25 KVA Distribution Transformer (Aluminium /Copper)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Reconditioning of LV Coil….. (Copper)
Reconditioning of LV Coil…..(Aluminium)
Winding of HV Leg coil…. (Copper)
Winding of LV Leg coil…. (Copper)
Winding of HV Leg coil…. (Aluminium)
Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat treatment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of HT Bushing
Fitting of HT Bush Rod
Fitting of LT Bushing
Fitting of LT Bush Rod
Filtration/Dehydration of old oil including filling.
Filling of new transformer oil.
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Arranging T&P items required for site repair, their carriage during work and back carriage to stacking site
Dismantling and refixing of HT jumper sets
Dismantling and refixing of LT Ckt.
Dismantling of transformer from bed and mounting of transformer at bed after repair.
Dragging of Transformer from Dismantling site to work site and from work site to mounting site for site repair.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Labour charges for weighing ,stacking and loading of Aluminium/Copper scrap etc.
63/50 kva Transformer
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators .
Reconditioning of LV Coil….. (Copper)
Reconditioning of LV Coil…..(Aluminium)
Winding of HV Leg coil…. (Copper)
Winding of LV Leg coil…. (Copper)
Winding of HV Leg coil…. (Aluminium)
Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of HT Bushing
Fitting of HT Bush Rod
Fitting of LT Bushing
Fitting of LT Bush Rod
Filtration/Dehydration of old oil including filling
Filling of new transformer oil.
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Arranging T&P items required for site repair, their carriage during work and back carriage to stacking site
Dismantling and refixing of HT jumper sets
Dismantling and refixing of LT Ckt.
Dismantling of transformer from bed and mounting of transformer at bed after repair.
Dragging of Transformer from Dismantling site to work site and from work site to mounting site for site repair.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Labour charges for weighing ,stacking and loading of Aluminium/Copper scrap etc.
100 kva Transformer
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including .
Reconditioning of LV Coil….. (Copper)
Reconditioning of LV Coil…..(Aluminium)
Winding of HV Leg coil…. (Copper)
Winding of LV Leg coil…. (Copper)
Winding of HV Leg coil…. (Aluminium)
Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of HT Bushing
Fitting of HT Bush Rod
Fitting of LT Bushing
Fitting of LT Bush Rod
Filtration/Dehydration of old oil including filling
Filling of new transformer oil.
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Arranging T&P items required for site repair, their carriage during work and back carriage to stacking site
Dismantling and refixing of HT jumper sets
Dismantling and refixing of LT Ckt.
Dismantling of transformer from bed and mounting of transformer at bed after repair.
Dragging of Transformer from Dismantling site to work site and from work site to mounting site for site repair.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Labour charges for weighing ,stacking and loading of Aluminium/Copper scrap etc.
200KVA/250/300 KVA Distribution transformer
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators etc
Reconditioning of LV Coil….. (Copper)
Reconditioning of LV Coil…..(Aluminium)
Winding of HV Leg coil…. (Copper)
Winding of LV Leg coil…. (Copper)
Winding of HV Leg coil…. (Aluminium)
Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of HT Bushing
Fitting of HT Bush Rod
Fitting of LT Bushing
Fitting of LT Bush Rod
Filtration/Dehydration of old oil including filling.
Filling of new transformer oil.
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Arranging T&P items required for site repair, their carriage during work and back carriage to stacking site
Dismantling and refixing of HT jumper sets
Dismantling and refixing of LT Ckt.
Dismantling of transformer from bed and mounting of transformer at bed after repair.
Dragging of Transformer from Dismantling site to work site and from work site to mounting site for site repair.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Labour charges for weighing ,stacking and loading of Aluminium/Copper scrap etc.
N.K SHARMA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .