Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrRejected-Finance | ₹1.4 Cr | L1 | Rejected-Finance Rejected by the competent autority |
| 2 | Not Admitted-Fee/PreQual/Technical RZ 151 BLOCK Y NEW ROSHANPURA PAPRAWAT ROAD NAJAFGARH SOUTH WEST DELHI DELHI 110043 | WEST DELHI | DELHI | 110043 | - | - | Not Admitted-Fee/PreQual/Technical Others-Technical bid not opened as not submitted in prescribed manner as per NIT Condition |
| 3 | Not Admitted-Fee/PreQual/Technical D 69 FOURTH FLOOR ABUL FAZAL ENCLAVE PART 1 JAMIA NAGAR OKHLA DELHI 110025 VOGELKOPEP QMAIL COM | - | - | Not Admitted-Fee/PreQual/Technical Others-Technical bid not opened as not submitted in prescribed manner as per NIT Condition |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
25 Oct 2023, 6:00 pmClosed
Executive Engineer Civil, BSNL Civil Div Guru Gram
Executive Engineer(C) BSNL CIVIL Division TE Building Sector-18, Gurgaon
Construction of boundary wall at Wireless Colony Rajeev Chowk Gurugram Haryana.
2023_BSNL_170888_1
31/EE/BSNL/CD/GRG/2023-24
Open Tender
Civil Works
Item Rate
180 days
BSNL Wirelesss Colony Rajeev Chowk Guru Gram
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,180
Accounts Officer (Cash) O/o GMT, BSNL Gurugram BA
₹3.2 L
3 Dec 2023
16 Oct 2023
3 Nov 2023
16 Oct 2023
25 Oct 2023
16 Oct 2023
16 Oct 2023 - 25 Oct 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size)
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, xcluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain windowsills, staircases and spiral stair cases above plinth level up to floor five level,excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size).
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :
cement mortar 1:4 (1 cement : 4 coarse sand)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
12 mm cement plaster of mix :
1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix:
1:6 (1 cement: 6 coarse sand)
12 mm cement plaster finished with a floating coat of neat cement of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with water proofing cement paint of required shade :
New work (Two or more coats applied @ 3.84 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire,stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineerin-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Demarcation By Drone fitted with a high-resolution optical device or camera used for survey of BSNL Plot at Rajeev Chowk GuruGram having TE building, Staff Quarters , Guest House having perimeter, of around 1710 meter from the Reveneue Department of Haryana by fulfiiling all the paperwork and depositiong all the fees to be deposited. And physically marking on site complete as per direction of Engineer in charge
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .