Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance MIRZAPUR MUMTAZ NAGAR AYODHYA AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | Admitted-Finance |
| 3 | Rejected-Technical 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | Rejected-Technical Reject |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
10 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC GONDA
SE EWC GONDA
06/EWC(G)/2022-23
2023_MVVNL_787427_2
NVS_05-06/EWC(G)/2022-23
Open Tender
Electrical Works
Item Rate
90 days
GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE EWD GONDA
₹3,500
Yes
19 Apr 2023
20 Mar 2023
11 Apr 2023
20 Mar 2023
10 Apr 2023
20 Mar 2023
Amount
Carraige of all the concerning material from Electricity store centre, Gonda to J.E.'s dump store and from J.E.'s dump store to the side of work including loading, unloading and proper stocking at work side. (Distance approx. 3 Km.)
11 KV XLPE Cable 3*300 sq.mm
11 KV cable J/Kit 3*300 sq.mm
Miscellancous works of Increasing capcity of 33/11 S/S Badganv, Gonda [(2x5 MVA) ] to [(1x5 MVA + 1x10 MVA)
Hiring of D/G Set including Carriage,Loading, unloading operating charges (with fuel) at 33/11 KV Substation Under Construction in case L.T. Supply is not available near S/s within preseribed accessible limit. 63 KVA, There phase D/G Set for fabrication work.
Removal of existing 5 MVA Transformer and other accessories equipments.
Disconnecting HT cable connection from 33KV side & 11KV side of 05 MVA Power transformer for removing power transformer from plinth after proper shutdown Dismantling of UKV cable support structure, copper bus bar structure, M.S.Frame etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 05 MVA Power transfomer.
Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S Nandgram into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor.
Removal of conservator, radiators and other accessories from on existing MVA Power transformer.
Safe shifting of 05 MVA Power transformer main body and other accessories from the Substation switchyard to outside the switchyard at suitablw place assigned by concern J.E/S.D.O. (Distribution).
Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
Re-filling the transfomer oil (old & used in existing 5 MVA T/F)
Installation for 33/11 kv 10 mva T/F
Safe Shifting of 10MVA. 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard
Erection & Installation of 10 MVA Power transformer on Power Transformer plinth by fixing all accessories like Job radiators conservator tank filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect Reconnecting 2 Nos earthing strip to transformer body.
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at 20 Mtr depth Job or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
H.T. Power Cable Laying:
Laying 11 KV. (3x300) /(3x400) mm XLPE, Cable from power transformer to 11 KV incoming switch gear in from power transformer to 11 KV incoming switch gear in the cable trench 0.45 in wide, 0.90 m depth Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length) The cable shall be dully protected by brick On both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 Nos. of bricks are to be laid top and outer side along the cable. The work includes digging of trenches, laying of cable in under ground trenches, digging of trenches, joining of terminal's back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
Preparation of 11 KV Power Cable ends:
Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV. 3x300Sq.mm XLPE cable Suitable size cable Jointing Kit will be provided by department free of cost execution of work. Providing fixing and crimping of proper size good quality lugs complete in all respect. (Cable jointing kit shall be provided by department.)
Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV. 3x300Sq.mm XLPE cable Suitable size cable Jointing Kit will be provided by department free of cost execution of work. Providing, fixing and crimping of proper size good quality lugs complete in all respect. (Cable jointing kit shall be provided by department.)
Providing & Erection of G.I. Strip size 50x6mm for earthing of outdoor & indoor equipment.
Testing & commissioning of Power T/F and all 33 KV & 11 KV switchgears / Panels providing required No. technicians with proper testing equipments during commissioning & energisation.
Hindustan Electric Work
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .