| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹15.3 L+₹4.0 L (35.4%)Rejected-Finance | L2 | Rejected-Finance HIGHEST | |
| 3 | L2₹19.4 L+₹8.1 L (72.1%)Rejected-Finance | L2 | Rejected-Finance HIGHEST | |
| 4 | L3₹16.0 L+₹4.7 L (42.1%)Rejected-Finance D 44 GANESH NAGAR PANDAV NAGAR COMPLEX DELHI EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | L3 | Rejected-Finance HIGHEST | |
| 5 | L4₹18.0 L+₹6.8 L (60.0%)Rejected-Finance | L4 | Rejected-Finance HIGHEST |
Tender Value
₹23 L
EMD Value
₹23,000
Closing Date
30 Nov 2021, 1:00 pmClosed
SE EDC-I, Mathura
Near Kali Mandir, Mathura, Cantt, Mathura
The Work for Shifting of 11 KV/LT Line by MVDA Mathura at Newly Constructed Jan Suvidha Kendra Goverdhan Mathura on Semi Turnkey Basis under Deposit Scheme in the jurisdiction of EDD-IV, Goverdhan, Mathura
2021_DVVNL_645090_1
62/EDC-I(M)/2021-22
Open Tender
Electrical Works
Item Rate
90 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Dvvnl Portal (dvvnl.org)
₹23,000
Yes
29 Aug 2022
20 Nov 2021
30 Nov 2021
20 Nov 2021
30 Nov 2021
20 Nov 2021
Amount
Part-A (Supply of Material) 11 KV 3 Core Al. XLPE Insulated 3x120 mm sq. Cable
11KV XLPE Cable (3x120 sq.mm.) Heat Shrinkable Jointing kit Outdoor
Danger board of size 8x12 inch.
G.I. Barbed Wire
Lighting Arrester for 250/400 KVA Tranformer
11 KV TPMO Set
LT Distribution Board (Type-B Panel) with structure.
Stone Pad
HDPE Pipe PN6
Cable Stand size 65x65x6 sqmm angle of 5' hieght.
Bolt, Nuts & Washer
Part -B (Labour Work) Carriage of 9/11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 11 KV XLPE Cable size 3x120 sq.mm. from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Dismentling of single pole structure on 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure 11 Mtrs on ST Pole and fitting of all relevant accessories as per RESPO norms.
Dismentling of Double pole structure on 9/11 Mtrs on ST Pole with all relevant accessories.
Erection of Double pole structure 11 Mtrs on ST Pole and fitting of all relevant accessories as per RESPO norms including grouting of pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Chopping of Tree branches to Clear the route properly.
Fixing of Lighting Arrester for 250/400 KVA Tranformer
LT Distribution Board (Type-B Panel) with structure.
Digging of trench for laying of 3x120 sqmm 11 KV cable as per direction of supervising engineer. (Approximate depth 1.8/2.5 Mtr deep)
Making of trench for laying of 11 KV/ 33 KV cable with cement sand and bricks and refilling with sand after laying of cable as per direction of supervising engineer.
Cutting of CC Road for digging of trench.
Laying of HDPE pipe PN6 of dia 160 mm In trench for laying of cable by below the ground level of 1.0 to 2.5 mtr.
Laying of 11 KV XLPE Cable size 3x120 sq.mm. in the trench/G.I pipe/HDPE pipe for proper completion of work as per direction of supervising engineer.
Laying of Arial Bunch Conductor size 3x120 sq.mm. for proper completion of work as per direction of supervising engineer.
Laying of LT All. Cable size 1x630 sq.mm. in the trench/G.I pipe/HDPE pipe for proper completion of work as per direction of supervising engineer.
Fixing of 11 KV Cable Jointing Kit 3x120 sq.mm outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.
Re-dressing of trench after laying of cable properly by Sand/Earth work as per norms and direction of supervising engineer.
Painting of ST Pole by using aluminum paint in two coat. (Painting rate mentioned as per pole.) including cost of labour T&P and required material for such work.
Dismentling/Removal of 250/400 KVA Transformer from Plinth structures and opening of all connections thereof.
Mounting of 250 KVA Transformer on the Double pole/Plinth structures and making connections thereof.
Mounting of 400 KVA Transformer on the Double pole/Plinth structures and making connections thereof.
Installation of Distribution Box with N&B and clamp as per direction of supervising engineer.
Cutting of CC Road for making depth foundation for erection of pole.
Body and neutral earthing of 250/400 KVA transformers by digging pits 6” dia up to 3 mtr deep including inserting lowering 80mm dia G.I. and insert 50mm G.I. pipe chemical filled pipe (Pipe in pipe earthing) I.S.I. Mark B-Grade connecting with G.I. flat 50x6 mm Power Transformer to 80mm dia G.I. pipe and filling of chemical mixture around the G.I. pipe up to 3mtr. Including making of chamber.
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Fixing of Danger board of size 8x12 inch at 11 mtr. long ST pole for the safety point of view.
Construction of plinth of 250/400 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work. (Plinth made on the Drain(Nala) with foundation as per requirment of site)
Making of wire mesh fencing around constructed 250/400 KVA T/f plinth 4mtr. x 3 mtr. with proper grouting Erection and construction of Toe-wall around the transformer plinth including digging of pits and making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting of wire mesh fencing and plastering around the wall in ratio 1:4 cement and sand providing of one no. main gate in the wire mesh fencing for shifting the transformer size of gate 8 ft. x 4ft. including fixing of dandala for locking system, (Size of angle iron 50x50x6mm. and size of wire mesh fencing 1.5x2 sq. inch wire gauge 10 SWG.) All material/labour will be arranged by the contractor.
Making of jumphers for HT Line by ACSR Insulated Weasel Conductor as per direction of supervising engineer.
Dismantle of Old/unused 250/400 KVA T/F Pilnth.
Dismantle of old/damaged ACSR Dog conductor from the existing line and its bundling and stacking in roll and send to J.E. Store/ Mathura Store.
Febrication of T-Off Channel, V Cross Arm, Cable Stand etc.
Installation of 11KV Drop out fuse set on various capacity Transformer.
Carriage of Dismentalled ST Pole from site to J.E. Store with loading & unloading at both ends
Removal/Dismantling of consumer’s cable service connection from existing line feeding consumer supply.
Re-installation of consumer’s cable service connection from existing line feeding consumer supply.
M/S S.P. & CO
SPARK UTILITY SERVICES PRIVATE LIMITED
M/S MAA VISHARI DEVI ENTERPRISES
M/S VIKAS ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .