| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC 36 RANJEET NAGAR SHAHBAD MARKANDA NH 1 KURUKSHETRA HARYANA 136135 | KURUKSHETRA | HARYANA | 136135 | L1 | Accepted-AOC AWARD | |
| 2 | L2₹5.0 L+₹1.2 L (30.1%)Rejected-Finance 86 INDUSTRIAL AREA PHASE 1 PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹5.5 L+₹1.6 L (41.8%)Rejected-Finance FCA 560 BLB EAST CHAWLA COLONY SAURAJ SINGH YADAV BALLABGARH VILLAGE TOWN CHAWLA COLONY CITY FARIDABAD FARIDABAD HARYANA 121004 INDIA | FARIDABAD | HARYANA | 121004 | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹5.8 L+₹1.9 L (49.0%)Rejected-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | L5₹6.7 L+₹2.8 L (71.5%)Rejected-Finance VILL JAMALPUR P O NAYA MAHMMADPUR DISTT BHOJPUR ARA PIN 802163 | ARA | BHOJPUR | BIHAR | 802163 | L5 | Rejected-Finance OTHER THAN LOWEST |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
8 Apr 2023, 6:00 pmClosed
GE
GARRISON ENGINEER DANAPUR CANTT PIN 801503
SOIL INVESTIGATION FOR PROVN OF 500 MTR BAFFLE WALL RANGE AT BRC UNDER GE DANAUR CANTT
2023_MES_586344_1
GE/DNR/T- OF 2022-23 / 8671/E8
Open Tender
Civil Works
Item Rate
45 days
DANAPUR CANTT
AS PER NIT
8 documents required · 8 mandatory
₹500
GE DANAPUR
₹13,000
Yes
15 May 2023
18 Mar 2023
11 Apr 2023
18 Mar 2023
8 Apr 2023
3 Apr 2023
Amount
Mobilisation of Mechanical drilling equipment / rig and shifting of entire arrange ment from one bore to another bore hole location and setting of boring/drilling rig as required/directed by Engineer-in-charge Boring 150 mm dia bore hole, 10 mtr depth for BAFFLE RANGE :
(A) Boring 150mm dia bore hole to 10 mtr through the following type of strata for baffle range (i) Any type of soil Note: Depth of bore holes may be taken 10m or N value reaches 50, whichever is earlier in any type of soil/soft disintegrated rock/hard rock for isolated /combined / raft foundation. To ensure that boulders or layers of cementeous soil is not mistaken for bed rock, core drilling to be done to a depth of atleast 3.0m in bed rock in areas where boulders are found & collection/ preparation of rock samples and determination of bulk density, water absorption and compressive strength is done. However the maximum depth of bore hole is 10m in any case.
(B) Collection of undisturbed soil sample at 1.5m intervals or at any change in strata in 150mm bore thin walled tube including waxing, sealing, packing and transporting to the lab.
(C) Carrying out Standard Penetration test(SPT) including collection of disturbed soil samples in bore holes at every 1.5m depth or any change in strata and submit the report with all requisite data.
(D) Conducting necessary tests as per relevant IS codes :-1892/NBC 2005/SP36 on all collected samples which include the determination of:- (a) Atterberg limits- Liquid limit, Plastic limit , Shrinkage limit (b) Wet and dry density, degree of saturation of soil. (c) Unit weight(Bulk density), Natural Moisture content, Plasticity index, Specific gravity (d) Grain size analysis, Identification and classification of soil, Soil particle size distribution using sieve/hydrometer analysis (e) Shear parameter (C-Phi Analysis), Tri-axial shear test and C-Phi determination. (f) Consolidation test and permeability test (g) Specific gravity test for sand/rock (h) Crushing strength, Degree of weathering(CR value) and RQD of rock samples (j) Permeability test (k) Chemical analysis of ground water sample (min 02samples) (water to be obtained from the bottom of bore hole) (l) Free swelling Index and Swelling pressure if expansive soil encountered (m) Depth of water table below Ground level (maximum and minimum) (n) Presence of loose soil if any and its depth (o) If weak soil with lesser N value as specified in Table-I of IS 1893(Part-I):2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial action to be adopted shall be specified. (p) Chemical analysis of soil and recommendation and type of cement to be used for RCC foundation. (q) Recommendation for soil suitable for backfilling including plinth protection. (r) RL of Ground level near each bore hole shall be also part of report.
Boring 150 mm dia bore hole, 8 mtr depth for BUILDING WORK :
(A) Boring 150mm dia bore hole to 8 mtr through any type of strata for baffle range Note: Depth of bore holes may be taken 12m or N value reaches 50, whichever is earlier in any type of soil/soft disintegrated rock/hard rock for isolated /combined / raft foundation. To ensure that boulders or layers of cementeous soil is not mistaken for bed rock, core drilling to be done to a depth of atleast 3.0m in bed rock in areas where boulders are found & collection/ preparation of rock samples and determination of bulk density, water absorption and compressive strength is done. However the maximum depth of bore hole is 10m in any case.
(B) Collection of undisturbed soil sample at 1.5m intervals or at any change in strata in 150mm bore thin walled tube including waxing, sealing, packing and transporting to the lab.
(C) Carrying out Standard Penetration test(SPT) including collection of disturbed soil samples in bore holes at every 1.5m depth or any change in strata and submit the report with all requisite data.
(D) Conducting necessary tests as per relevant IS codes :-1892/NBC 2005/SP36 on all collected samples which include the determination of:- (a) Atterberg limits- Liquid limit, Plastic limit , Shrinkage limit (b) Wet and dry density, degree of saturation of soil. (c) Unit weight(Bulk density), Natural Moisture content, Plasticity index, Specific gravity (d) Grain size analysis, Identification and classification of soil, Soil particle size distribution using sieve/hydrometer analysis (e) Shear parameter (C-Phi Analysis), Tri-axial shear test and C-Phi determination. (f) Consolidation test and permeability test (g) Specific gravity test for sand/rock (h) Crushing strength, Degree of weathering(CR value) and RQD of rock samples (j) Permeability test (k) Chemical analysis of ground water sample (min 02samples) (water to be obtained from the bottom of bore hole) (l) Free swelling Index and Swelling pressure if expansive soil encountered (m) Depth of water table below Ground level (maximum and minimum) (n) Presence of loose soil if any and its depth (o) If weak soil with lesser N value as specified in Table-I of IS 1893(Part-I):2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial action to be adopted shall be specified. (p) Chemical analysis of soil and recommendation and type of cement to be used for RCC foundation. (q) Recommendation for soil suitable for backfilling including plinth protection. (r) RL of Ground level near each bore hole shall be also part of report.
Boring 150 mm dia bore hole, 06 mtr depth for BOUNDARY WALL :
(A) Boring 150mm dia bore hole to 8 mtr through any type of strata for baffle range
(B) Collection of undisturbed soil sample at 1.5m intervals or at any change in strata in 150mm bore thin walled tube including waxing, sealing, packing and transporting to the lab.
(C) Carrying out Standard Penetration test(SPT) including collection of disturbed soil samples in bore holes at every 1.5m depth or any change in strata and submit the report with all requisite data.
(D) Conducting necessary tests as per relevant IS codes :-1892/NBC 2005/SP36 on all collected samples which include the determination of:- (a) Atterberg limits- Liquid limit, Plastic limit , Shrinkage limit (b) Wet and dry density, degree of saturation of soil. (c) Unit weight(Bulk density), Natural Moisture content, Plasticity index, Specific gravity (d) Grain size analysis, Identification and classification of soil, Soil particle size distribution using sieve/hydrometer analysis (e) Shear parameter (C-Phi Analysis), Tri-axial shear test and C-Phi determination. (f) Consolidation test and permeability test (g) Specific gravity test for sand/rock (h) Crushing strength, Degree of weathering(CR value) and RQD of rock samples (j) Permeability test (k) Chemical analysis of ground water sample (min 02samples) (water to be obtained from the bottom of bore hole) (l) Free swelling Index and Swelling pressure if expansive soil encountered (m) Depth of water table below Ground level (maximum and minimum) (n) Presence of loose soil if any and its depth (o) If weak soil with lesser N value as specified in Table-I of IS 1893(Part-I):2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial action to be adopted shall be specified. (p) Chemical analysis of soil and recommendation and type of cement to be used for RCC foundation. (q) Recommendation for soil suitable for backfilling including plinth protection. (r) RL of Ground level near each bore hole shall be also part of report.
Recommendation and submission of sources for CNS (Cohesive Non Swelling) soil suitable for filling available in nearby proximity in 50-60 Km range.In case same is not available, submission of suitable proportion after trials of tests of available soil found in 50-60 Km rangeto get soil with properties equivalent to CNS soil.NOTE: Contractor shall propose the exact proportion of soil along with the quarry for mixing to come by the soil with properties equivalent to CNS soil as per IS 9451:1994 tested in accordance with IS 2720(part41):1977 .
Submission of report in four sets giving site plan showing the test points, sub soil profile, results of field investigations, laboratory test results, calculation of SBC, Comprehensive type of foundation and colour photographic record of geoexploration and lab testing.
Interstellar Testing Centre Private Limited
Shree Balaji Test House Pvt. Ltd.
GEO DESIGNS AND RESEARCH PVT LTD
J K CONSTRUCTION
MS JODHI PRASAD SINGH SONS
M/s KUMAR ENTERPRISES
M/S Harsh Traders
M/S SHEO KUMAR SINGH AND SONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .