Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted as per Prahari |
| 2 | Accepted-Technical | Accepted-Technical Accepted as per Prahari |
| 3 | Accepted-Technical 142 SECTOR 16 AVAS VIKAS COLONY FRONT OF RAILWAY LINE SIKANDRA AGRA AGRA UTTAR PRADESH 282007 | AGRA | UTTAR PRADESH | 282007 | Accepted-Technical Accepted as per Prahari |
| 4 | Accepted-Technical 102 114 MOHADDIPUR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | Accepted-Technical Accepted as per Prahari |
Tender Value
₹1.3 Cr
EMD Value
₹8.4 L
Closing Date
20 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE PWD Gorakhpur Circle PWD Gorakhpur
-
Vishesh Marammat Yojanantargat Captanganj- Siswa-Nichlaul- Thuthibari-Nautanwa Marg ODR ke km-65 70 and 75 Me Purane Kshatigrast Puliya ke Sthan Par RCC Puliya Box Culvert ka Nirman Kary FY 2026-27 Lot 5 of 5
2026_CEGKP_1207525_5
8593/33Com-Gkp Circle/2026 Dated 31-10-26
Open Tender
Civil Works
Percentage
Maharajgnaj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.4 L
27 Nov 2026
11 Nov 2026
20 Nov 2026
11 Nov 2026
20 Nov 2026
11 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with material obtained from Boorrow Pit with a lift of 1.50 m. and transporting upto site. spreading,grinding to required slope and compacting to meet requirement to table no. 30.1 and 300.2 (Cartage Earth) as per clause 301.5 & MORTH Sr No. 3.16 (Including labour cess but GST will be paid extra as applicable) | 3,400 | Cum. | 170 | ₹5,78,000 |
| 2 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar/spigot & Socketed type joint, confirming to BIS specification as per IS 458:2003 with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. As per directed by the engineer-in-charge. 900 mm Dia Hume pipe. As Per SOR Sr. No. 9.3, 1100 (D) (Including labour cess but GST will be paid extra as applicable) | 30 | Rm | 4,090 | ₹1,22,700 |
| 3 | Construction of granular sub-base by providing Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MORTH Sr. No. 4.01 B (Including labour cess but GST will be paid extra as applicable) | 349 | Cum. | 5,200 | ₹18,14,800 |
| 4 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the-Engineer-in-charge within a distance of 60 m (200ft.) as per PWD S.No. 692 (Including labour cess but GST will be paid extra as applicable) | 180 | Cum. | 400 | ₹72,000 |
| 5 | Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 m. as per PWD S.NO. 694 (Including labour cess but GST will be paid extra as applicable) | 20 | Cum. | 855 | ₹17,100 |
| 6 | Earth work in excavation of foundation of structure as per drawing and technincal specification including setting out construction fo shoring and bracing, removal of stumps and others deleterious matter, dressing of sites and bottom and back filling with approved material. As per MoRTH Specification 304 & S.I. No. 12.01 (i) (Including labour cess but GST will be paid extra as applicable) | 600 | Cum. | 105 | ₹63,000 |
| 7 | Plain/Reinforced Cement Concrete M-15 in Open Foundation complete as per Drawing and Technical Specifications. 1500, 1700, 2100. As per MoRTH Sr No-12.08A (Case-II) (Including labour cess but GST will be paid extra as applicable) | 244 | Cum. | 9,250 | ₹22,57,000 |
| 8 | Plain/Reinforced Cement Concrete M-20 in Open Foundation complete as per Drawing and Technical Specifications 1500, 1700 & 2100. As per MoRTH Sr No-12.08B (Case-I) (Including labour cess but GST will be paid extra as applicable) | 148 | Cum. | 9,300 | ₹13,76,400 |
| 9 | (M30) Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. 1500, 1700 & 2100. As per MoRTH Sr No 12.08G Case-I (Including 18 labour cess but GST will be paid extra as applicable) | 164 | Cum. | 9,400 | ₹15,41,600 |
| 10 | (M30) Furnishing and Placing Reinforced cement concrete in slab as per drawing and Technical Specification 1500,1600 & 1700. MoRTH Sr No-14.01C Case-II (Including labour cess but GST will be paid extra as applicable) | 111 | Cum. | 12,800 | ₹14,20,800 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_2290712.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .