Loading…
Loading…
Tender Value
₹16.0 L
EMD Value
₹1.6 L
Closing Date
4 Aug 2026, 12:00 pm
Executive Officer
Nagar palika Parishad Chitrakootdham
Construction of kothi talab Atal Park me Ladies open Gym work
2026_DOLBU_1171351_1
1346/2026-27/E-Tendar Date 18-07-2026
Open Tender
Civil Works
Fixed-rate
60 days
Nagar palika Parishad Chitrakootdham
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,883
Yes
Executive Officer
₹1.6 L
Yes
21 Jul 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation All kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and for all lift as derected by Engineer-in-charge | 1 | cum | 129.22 | ₹129.09 |
| 2 | Laying & consolidation of 22.4.53mm GSB with screening 13% 6.7mm grit and 6% 2.8mm stone Dust including supply of all materials labour T&P etc. for proper completion of work. | - | cum | 1,966 | - |
| 3 | Rainforced cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) work in walls (any thickness) including attached pilasters buttresses, plinth and string courses fillets, columns, pillars, piers, abutments posts nad struts etc. above plinth level up to floor five level excluding cost of centering shuttering finishing and reinforcement. | - | cum | 7,900.95 | - |
| 4 | Rainforced cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) work in plinth etc. above plinth level up to floor five level excluding cost of centering shuttering finishing and reinforcement. | - | cum | 7,900.95 | - |
| 5 | Centring and shuttring in Plinth beams including strutting, propping etc. and removal of form work. | - | sqm | 536.1 | - |
| 6 | Rainforced cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) work in columns, etc. above plinth level up to floor five level excluding cost of centering shuttering finishing and reinforcement. | - | cum | 7,900.95 | - |
| 7 | Centring and shuttring in Columns strutting, propping etc. and removal of form work. | 1 | sqm | 699.83 | ₹699.13 |
| 8 | Providing and Laying in position cement concrete of specified Grade excluding the cost of centring and shutterig-All work up to plinth lavel -1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 4,959.14 | - |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: Cement mortar 1 :4 (1 cement : 4 coarse sand) | 1 | cum | 6,802.69 | ₹6,795.89 |
| 10 | 12mm cement plaster or mix 1:4(1 cement: 4 coarse sand) | - | sqm | 260.15 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_2198828.xls
BOQ • 0.29 MB
1346NITopengymstampsulkNew.pdf
Tender Documents • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].