Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹41,972
Closing Date
17 Jul 2026, 2:00 pm6d left
The Executive Engineer PWD,ECD
O/O The Executive Engineer PWD Electrical Construction Division New office Complex Building(5th Floor) Bhabani Bhawan Alipore, Kolkata
Temporary EI Work incl hiring of DG Sets for Stadium Flood Lights and broadcasting in connection with the upcoming 135th Durand Cup Tournament 2026 at Kishore Bharati Krirangan, Jadavpur,Kolkata.
2026_WBPWD_5016275_1
WBPWD/EE-ECD/e-NIQ-31/2026-27
Open Tender
ELECTRICAL WORKS ORG
12 days
Jadavpur
please refer tender documents
5 documents required · 5 mandatory
₹41,972
O/O The Executive Engineer PWD ECD
2 Jul 2026
2 Jul 2026
20 Jul 2026
2 Jul 2026
17 Jul 2026
7 Jul 2026
2 Jul 2026 - 7 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply & drawing on hire basis 1.1 KV single core stranded 'FR' PVC insulated & unsheathed copper wire of following size in polythene pipe incl. making necy. connection as required for circuit wiring and branch wiring and dismantling the same after the function/programme as per direction of E.I.C | |||||
| 1.1 | 2 x4 + 1x2.5 sqmm ( Up to 3 days). | 235 | Mtr | 1.25 | ₹293.75 |
| 1.2 | [Next 9 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 235 Mtr. X 9 No of Days = 2115 mtr)l | - | Mtr per day | 2.25 | - |
| 2Supply & drawing on hire basis 1.1 KV single core stranded 'FR' PVC insulated & unsheathed copper wire of following size in polythene pipe incl. making necy. connection as required for circuit wiring and branch wiring and dismantling the same after the function/programme as per direction of E.I.C | |||||
| 2.1 | 2 x2.5 + 1x1.5 sqmm (Up to 3 days.) | 350 | Mtr | 2.25 | ₹787.5 |
| 2.2 | [Next 9 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty =350 Mtr. X 9 No of Days = 3150 mtr) | - | Mtr per day | 1.25 | - |
| 3 | Providing on hire basis 200 W/150 W LED flood light to be fixed properly with clamping arranegent & other fixing accessories as required alongwith earthing attachment and dismantling the same after the function/programme as per direction of E.I.C. ( Up to 3 days.) | 30 | Sets | 2.25 | ₹67.5 |
| 3.1 | [Next 9 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty =30 Set. X 9 No of Days = 270 Sets) | - | Sets per day | 3.25 | - |
| 4 | Providing on hire basis 600mm. Sweep Air-Circulator fan of metal body with earthing attachment and dismantling the same after the function/programme as per direction of E.I.C (Up to 3 days) | 20 | Sets | 4.25 | ₹85 |
| 4.1 | [Next 9 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty =20 Set. X 9 No of Days = 180 Sets) | - | Sets per day | 1.25 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_5085613.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid