Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81.5 LAdmitted-Finance | -51.51% | ₹81.5 L | L1 | Admitted-Finance |
| 2 | L2₹97.4 LAdmitted-Finance | -42.01% | ₹97.4 L | L2 | Admitted-Finance |
| 3 | L3₹100.0 LAdmitted-Finance | -40.50% | ₹100.0 L | L3 | Admitted-Finance |
| 4 | L4₹1.0 CrAdmitted-Finance | -37.81% | ₹1.0 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.1 CrAdmitted-Finance | -36.64% | ₹1.1 Cr | L5 | Admitted-Finance |
Updated dates
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
30 Jan 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division CHENANI
Executive Engineer PWD (RandB) Division CHENANI
PLEASE REFER TO BOQ
2026_PWDJK_299978_1
E-NIT No.63 of 2025-26 Dated 06-01-2026
Open Tender
Civil Works
365 days
CHENANI
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹3,000
Superintending Engineer PWD RandB Udhampur Ramban
₹3.4 L
Superintending Engineer PWD (RandB) Udhampur- Ramb
17 Feb 2026
6 Jan 2026
31 Jan 2026
6 Jan 2026
30 Jan 2026
7 Jan 2026
15 Jan 2026
Construction of substructure and superstructure of 60.0 mtr span steel girder foot Bridge at kokaini (Kokani) Panchound over river Tawi having carriage way 2.00 mtr comprising of sub-structure (RCC) including foundation, footing, abutments, wing walls, Retaining walls, abutments caps, seismic stoppers and approach slabs etc, complete and the super structure i.e providng, fabrication, launching of super structure, appropriate bearing steel railing painting etc. complete job in all respect inclduing design of bridge and its components duly approved and vetted by competent authority i.e, DIQC/IIT/NIT latest version to be followed including soil investigation, subsoil investigation and subsoil exploration and all test complete including consultancy and vetting, incluidng quality control/testing of all material to be used at site and final load test / deflection test etc. including total approach wall on both sides upto 40 mtr length are as rquired at site (height as per site requirement) as per the approved and vetted design, including pacca path both sides upto 10 mtr length, protection work for abutments , approach path, steps, RBM filling behind abutments / protection walls etc. including carriages of all material involved by MT / headload (all compelte job).
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_973299.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid