RequiredExperience with Government
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Note: 1. OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years
Requiredending on 31st March of the previous financial year
Requiredshould be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant/Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution/incorporation of the OEM is less than 3 year old
Requiredthe average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. Refrigerated Micro-centrifuge ( 1 pieces ) Technical Specifications * As per GeM Category Specification 1/3 Specification Specification Name Values Bid Requirement (Allowed Values) SET 1 Microprocessor controlled High speed Micro centrifuge Yes * Maximum permissible Speed (RPM): - * Relative Centrifugal Force (RCF)
RequiredMax: 20
Required000 x g to 22
Required000 x g * Temperature Range - 10 degree C to +40 degree C * Refrigeration System: Must be CFC free. * Display for Speed
RequiredRCF
RequiredTemperature and Time parameters: Yes * Type of Display: LCD display LCD display Facility for short run operation Yes * Imbalance System and Selectable acoustic Alarms Yes * Running Modes available: soft/fast accelerate
Requireddecelerate and break off mode Yes * Operation of equipment: By keypad operations By keypad operations Angle rotor Polypropylene/metallic 24 x (15/10) ml or Dual row rotor with same capacity/volume Yes * Lid Aerosol tight Polysulfone or equiv. Lid * Certification: CE(European) * Adopter for PCR tube sizes: 0.2 ml and 0.5 ml * Time Selection: 1 to 99 min or continuous * * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.