Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-technical document is incomplete and irregular. |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
5 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Dharmapuri
Office of the Superintending Engineer Dharmapuri Electricity Distribution Circle TNEB Building Salem Main Road Dharmapuri
Survey Supply Erection Testing AND Commissioning of 1.37 Km length of 3X 1 X 95 SQ mm HT AB CABLE With all accessories for erection of 11 KV line 5 Location for New HT service HPCL 0.735Km New line and 0.635Km Conversion of LT into HT LT line
2021_EB_217365_1
ET/068/2021-22,Dt.22.12.2021
Open Tender
Electrical Works
Turn-key
Superintending Engineer Dharmapuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
Yes
6 Jan 2022
22 Dec 2021
6 Jan 2022
22 Dec 2021
5 Jan 2022
22 Dec 2021
180 days
Amount
Supply of 3 x 95 + 1 X 95 SQ MM ,11 KV AB Cable with all other accessories (Piercing Connector, suspension clamps, Dead end clamp/Anchor clamp assembly, Universal hook,Bolt & Nutts, T-Connector, Cable straight joint/Termination kits Pre insulated lugs, End cap etc) as per specification. ((Materials only) (The bidder should submit the split up details for all the materials with the corresponding GST)
New line -Erection, testing and Commissioning of 3 x 95 + 1 X 95 SQ MM ,11 KV AB Cable with all other accessories as per specification. The loading, unloading and transportation of the Poles and Stayset from Substores/Adhiyamankottai to work spot and erection of poles and stay set with concreting(Labour only) (The bidder should submit the split up details for all the works with the corresponding GST,EPF 13.36% and ESI 3.25%)
Conversion of LT line into HT/LT line -Erection, testing and Commissioning of 3 x 95 + 1 X 95 SQ MM ,11 KV AB Cable with all other accessories as per specification. The loading, unloading and transportation of the Poles and Stayset from Substores/Adhiyamankottai to work spot and erection of poles and stay set with concreting(Labour only) (The bidder should submit the split up details for all the works with the corresponding GST,EPF 13.36% and ESI 3.25%)
Freight Charges including GST
G.S.T. in % for Materials
G.S.T. in % For Labour only
E.P.F. @ 13.36 % For Labour only
E.S.I. @ 3.25 % For Labour only
V BEST ENGINEERS
stage.html
html • 0.02 MB
finance_257206.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .