| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC LOWER BID VALUE |
| 2 | L2₹4.7 LRejected-Finance | ₹4.7 L | L2 | Rejected-Finance HIGHER BID VALUE |
| 3 | L3₹4.7 LRejected-Finance | ₹4.7 L | L3 | Rejected-Finance HIGHER BID VALUE |
Tender Value
₹4.7 L
EMD Value
₹9,386
Closing Date
29 May 2026, 2:00 pmClosed
ASSISTANT ENGINEER KALIYAGANJ Q C SUB DIVISION
OFFICE OF THE ASSISTANT ENGINEER KALIYAGANJ Q C SUB DIVISION KALIYAGANJ UTTAR DINAJPUR 733129
New construction of 600mm Dia Hume Pipe HP Culvert at 12.00 km and allied work at 10.00km 11.50km 0f Vandabari Mahapukur Road under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
2026_WBPWD_5014208_1
AE/KQCSD/WB/PWRD/NIT01_2026_27
Open Tender
CIVIL WORKS
Percentage
30 days
KALIYAGANJ
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,386
Yes
11 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. (Extra quantity of earth for filling shall be obtained from road side borrow pits) | 1.24 | Cum | 277 | ₹343.48 |
| 2 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint.
b) Two Coats | - | Cum | 453 | - |
| 3 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds | 50.66 | Cum | 124 | ₹6,281.84 |
| 4 | Bamboo Pile Walling made of 6.5cm to 7.5cm diabamboo (in single line) driven about half-length intoground at very close spacing of 30cm c/c side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and fixed with nails etc. and lining exposed portion with sheets made from cut drums (empty bitumen drums) fitted and fixed with a lap width of 100 mm at each joint, complete as per direction including the cost of drum sheets and including the cost of nails, wires etc.
(ii) With bamboos of length above 2.00m and
upto 2.50m | - | Cum | 1,213.8 | - |
| 5 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. | 12.62 | Cum | 5,887.69 | ₹74,302.65 |
| 6 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. | 10.13 | Cum | 92 | ₹931.96 |
| 7 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. | - | Cum | 5,114.04 | - |
| 8 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. | 10 | m | 3,224.72 | ₹32,247.2 |
| 9 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. | 8 | nos | 115 | ₹920 |
| 10 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. | - | Cum | 2,103.57 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_5082189.xls
BOQ • 0.32 MB
2911NEW.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].