| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAdmitted-Finance | ₹6.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.6 CrAdmitted-Finance S 511 A S 511 B SHOP NO 202 A 2ND FLOOR SCHOOL BLOCK SHAKARPUR EAST DELHI DELHI 110092 UDYAM UP 29 0006890 | EAST DELHI | DELHI | 110092 | ₹7.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹8.0 CrAdmitted-Finance 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | ₹8.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹8.1 CrAdmitted-Finance HO PLOT NO 11 1ST FLOOR LSC SECTOR B 1 VASANT KUNJ NEW DELHI 110070 | NEW DELHI | DELHI | 110070 | ₹8.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹8.9 CrAdmitted-Finance | ₹8.9 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L9 | EURO SMILE FACILITY MANAGEMENT SERVICES PVT LTD L2 | G L GOLDEN L7 | Perfecter Fabritech Pvt. Ltd. L1 | ANERI CONSTRUCTION PRIVATE LIMITED L10 | RUDRA GAS ENTERPRISE PVT LTD L8 | ANNU PROJECTS LIMITED L4 | Yash Construction Co L3 | M/S JSE INFOTECH PRIVATE LIMITED L5 | Vichitra Constructions Pvt Ltd L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | GST rate/ amount, SAC & Total amount incl. GST | 1 | Nos | 12,73,72,992.23 ₹15.0 Cr | 6,41,96,944.6 ₹7.6 Cr | 8,51,29,931.12 ₹10.0 Cr | 5,37,12,056.8 ₹6.3 Cr | 18,75,23,138.03 ₹22.1 Cr | 10,86,93,336.86 ₹12.8 Cr | 6,87,95,579.6 ₹8.1 Cr | 6,80,50,600.73 ₹8.0 Cr | 7,54,17,614 ₹8.9 Cr | 8,07,06,044.25 ₹9.5 Cr |
Tender Value
₹9.2 Cr
EMD Value
₹11.0 L
Closing Date
6 Jan 2026, 2:00 pmClosed
MR. SANJOY BHATTACHARYYA (ED ENGG)
Bridge and Roof Company (India) Limited, 4th/5th Floor, Kankaria Centre, 2/1 Russel Street - 700071, West Bengal (IN)
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER RANCHI GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
2025_GAIL_255291_1
GAIL/BNR/PROJ/WORKS/STEEL LAYING/25-26/61
Open Tender
Pipe Laying Works
365 days
RANCHI GA
PLEASE REFER TO THE TENDER DOCUMENT
11 documents required · 11 mandatory
₹0
₹11.0 L
Yes
ONLINE (THROUGH VC)
5 Feb 2026
20 Dec 2025
7 Jan 2026
20 Dec 2025
6 Jan 2026
30 Dec 2025
29 Dec 2025
BoQ_Ver4.0
Notice Inviting e-Tender (eNIT) No : GAIL/BNR/PROJ/WORKS/STEEL LAYING/25-26/61 Tender ID: 2025_GAIL_255291_1
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
PIPELINE LAYING / INSTALLATION
Size: 100 NB, 6.4 mm thickness (Normal Soil / Hard Soil Strata)
Size: 100 NB, 6.4 mm thickness (Any type of rocky strata, including soft or hard rock)
Size: 150 NB, 6.4 mm thickness (Normal Soil / Hard Soil Strata)
Size: 150 NB, 6.4 mm thickness (Any type of rocky strata, including soft or hard rock)
16. Contractor shall ensure that no tree/plant cutting shall be carried out during Pipe Line Laying operations.Trenching shall be carried out manually if needed, so as to ensure no damage to plant/tree/OFC /water pipe line /foreign pipeline/telephone line/sewage line/electric cable and other under ground utilities. 17. Payment for items above under pipeline laying in all type of Rocky strata including hard rock of single piece exceeding 1.5 meter in any direction within the trench dimension with respect to length, width & depth and removal only by pneumatic chisel/ drill/ rock-breaker.Trenching in rockey starta shall be done by rock breaking tool / rock hammer. Supply and installation of padding materials (i.e, sand / soft soil) shall be done as per direction of EIC. Bidder to quote accordingly. 18. Bidder has to familiarise themself the entire pipeline route and all locations /region/ charge area within the GA and ascertain all type of eventuality/uncertaintity before qouting their bid.
Size: 100 NB, 6.4 mm thickness (Normal Soil / Hard Soil Strata)
Size: 100 NB, 6.4 mm thickness (Any type of rocky strata, including soft or hard rock)
Size: 150 NB, 6.4 mm thickness (Normal Soil / Hard Soil Strata)
Size: 150 NB, 6.4 mm thickness (Any type of rocky strata, including soft or hard rock)
(ii) Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.
Preparation and submission of as built drawings & other drawings/documents etc. duly approved by EIC/RCM.
Crossing of Railway/NH Road/ Nala/Canal/Water Bodies by HDD method
Crossing for carrier pipeline of size 100 mm NB x 6.4mm Thk. of API 5L Grade X-52 in any type of Strata including soft/Hard rock
GROUND PENET
RATING RADAR
1.Survey Agency for execution of GPR Survey Work to be engaged by the Contractor shall be submitted for approval of GAIL/CMC prior to start of work.
Asphalting
Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material requierd, as per local authorities norms, obtaining NOC from land owners/ third party inspection agencies/Consultant designated by GAIL and to the satisfaction of Engineer-in-charge.
Tiles/ Paver/ Blocks/ Curb Stones,Red sand stone
Restroration of the all kind of pathway: Restoration by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC 1:4:8 of 50mm thickness below after compaction of the filled soil, fixing the Tiles/Paver blocks/Granite etc and matching it to the existing surface. Item includes providing of extra finished material if required.such as Tiles/Paver blocks/Granite etc matching to original pathways.
Asphalt road : Restoration of bitumen Asphalt road after laying of pipe line as per the specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done as per requirement of RMC/MCD/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA and to get NOC from the concerned authorities. Restoration of the asphalt road cut portion for pipeline trench width shall be carried out by filling the bottom layer with good earth/Soil filling followed by 225mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. DBM & 40mm thk. BC matching with the existing road top level. This item also includes disposal of surplus soil /debris with all lift & leads, cutting of Top layer of asphalt road by mechanized saw/cutters for maintaining straight line.
Cement Concrete
Brick Soling/ Stone Soling, etc.
Additional work over and above item 1.0 for supply of specified and approved quality of borrowed local soft graded soil / sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including local transportation of such special backfill material over all distances, complete.
EXCAVATION FOR PIPE TOP COVER BEYOND 1.5M DEPTH IN CASE OF CROSSING OF UTILITIES/ DRAIN/ CULVERTS ETC. THROUGH OPEN CUT UPTO THE FOLLOWING DEPTH (INCLUDING RESTORATION OF THE DAMAGED AREA TO ITS ORIGINAL CONDITION AND SATISFACTION OF THE ENGINEER-IN-CHARGE / CONCERNED AUTHORITIES) .THE OTHER ACTIVITIES ARE AS PER Item Code A00101 to A00104.
Deeper than 2.5 m & upto 4.5 m below existing level (for 150/100 mm NB Pipeline)
Note: (i) Quantities indicated in tentative and for various locations.
(ii) Prior permission from EIC is required before execution of above item.
SUPPLY OF WARNING MAT Supply of warning mat for pipeline as per the technical specification enclosed in the bid document. The material of warning mat shall be of high density polyethylene and non biodegradable type. It shall have non-toxic and anti rodent properties.
6" NB Pipeline
REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)
Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of "receiving and taking over" by Contractor in the presence of Engineer-in-charge.
REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)
Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:
Specified OD, mm
Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:
REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)
Repair of Holiday in Coating (Noted and recorded at the time of "receiving and taking over")
Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cm of the exposed steel area exposed steel area.
PERMANENT MARKERS
Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.
Pipeline RCC boundary / route marker as per drawing
Pipeline warning markers with post & foundations
Pipeline KM marker with post & foundations
LEAK / BURST (ATTRIBUTABLE TO OWNER)
All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner /Engineer-in-charge/ Engineer in-charge
For 4" NB Line
For 6" NB Line
(i) This rate is applicable for manufacturing defects in Owner supplied material only.
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
GAUGING (Applicable for main pipeline route, excluding branch pipelines as decided by the EIC)
As per specification and procedure approved by Engineer–in–charge (EIC)/ RCM.
100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)
150 6.4 API 5L Gr. X-52 3 Layer PE Double
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
GAUGING (Applicable for main pipeline route, excluding branch pipelines as decided by the EIC)
random Coating (Externally) (approx. 11.5 m to 12.5 m)
NOTE- (i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during execution stage. (ii) The total quantities mentioned against the above SOR items are applicable for main steel pipeline and multiple/various crossings at different location within GA . (iii) Payment for the above item shall be made only for the certified executed length of the pipeline by the Engineer-in-Charge (EIC)/RCM. All work shall be carried out as per tender specifications, OISD/PNGRB requirements, and shall be approved by the Engineer-in-Charge (EIC)/RCM
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
GAUGING (Applicable for main pipeline route, excluding branch pipelines as decided by the EIC)
HYDROSTATIC TESTING OF BURIED PIPELINE
Carrying out cleaning, gauging, pigging & hydrostatic testing a of complete pipeline section laid by HDD/Opencut method as approved by EIC/RCM to specified pressures (i.e. 1.5 times of the design pressure) for 24 hours holding period; providing all equipment, pumps, test headers, fittings, instruments, dead weight tester, pressure recorder, tempearature recorder , pressure & temperature gauge etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required for successful completion of hydrotesting of pipeline to acceptance criteria as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document. Complete dewatering and swabbing of the pipeline as per specification and to the entire satisfaction of the EIC/RCM.
Notes: i) The above quantity is not for a single section but for no. of sections for pipeline laying. ii) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during excecution stage. iii) Payment for gauging activities shall be made under a separate SOR item mentioned elsewhere in this SOR.
Swabbing of pipeline sections
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
GAUGING (Applicable for main pipeline route, excluding branch pipelines as decided by the EIC)
Notes:- i) Above quantities for various pipelines sections.
ii) For swabbing, a minimum of five (5) runs using a combination of low-density and high-density pigs shall be carried out. Swabbing shall continue until the acceptable limit, as mentioned in the technical specifications, is reached.
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.
GAUGING (Applicable for main pipeline route, excluding branch pipelines as decided by the EIC)
Drying by Vacuum drying / Super air drying / Super dry nitrogen
Complete work of carrying out drying by Vacuum drying / Super air drying / Super dry nitrogen & commissioning of pipeline section including supply of manpower, equipments & consumables (nitrogen reqiured for purging etc.), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.
Note: The quantities mentioned above for various pipeline sections. Final methodology of drying shall be decided by EIC at the time of execution.
COMMISSIONING ASSISTANCE / COMMISSIONING FOR UNDERGROUND PIPELINE LENGTH AND STATIONS
Pipeline KM marker with post & foundations
LEAK / BURST (ATTRIBUTABLE TO OWNER)
Note:- The above rates are applicable for no. of pipeline sections.
Pipeline KM marker with post & foundations
LEAK / BURST (ATTRIBUTABLE TO OWNER)
PRESERVATION OF PIPELINE
Preservation of pipeline sections and associated facilities (in event of delay in ROU acquisition/statury permissions, comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.
For every additional period of one month or part thereof
Notes: i) The above length is not for a single section but for no. of sections.
ii) All accessrious ie;Two nos. of dished end caps and two nos tappings of 3/4 inches,PG to be considered per section and rate for the same shall be quoted by bidder under this item.
iii) If month is partially complete, payment shall be made on prorata basis.
PIPELINE LAYING LIASIONING & CO-ODRINATION (INCLUDING UTILITY CROSSING) AND OBTAINING PERMISSION / NOC FROM THE STATUATORY / CONCERNED AUTHORITIES. ASSISTANCE IN ROU OPENING & CLOSING AND THEIR MAINTAINENCE/ MANAGEMENT. (EXCLUDING STANDALONE CROSSINGS)
Submitting request for (after obtaining the letter from client) permission , follow up , assisting in site inspections / route suevey / site report making/making site inspection drawings , submitting at designated offices , resubmission after correction , modification if required , soft and hard copy in nos. as required /if required in sizes , and collecting permission from the statuatory authorities including NHAI , PWD , Railways , Irrigation , Forest , Municipal Corporation, District administration, River Authority,SEZ etc. Obtaining work permits /NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations /conditions/recommendations of the said authorities. Only statutory fees shall be paid by the owner. Assistance in required length and width/restricted width of ROU opening & closing and their maintainence/ management both side of the crossings.
TRANSPORTATION OF LINE PIPE FROM OUTSIDE RANCHI GA
"Receiving and taking over", handling, lifting, loading on trailers, transportation and unloading of Company supplied line pipe from any storage yard (other than the designated storage yard for the project) to worksite / contractor's storage yard/ any other storage yard or as decided by EIC. The above work also includes stacking the pipes on wooden sleepers/ sand pads. Above work shall be carried out as per standard drawing, specification, instruction of Owner and other provision of contract document.
Notes: i) The quantities given in above item no. are tentative only and shall not be considered to be binding. The quantities may be increased, decreased or deleted as per the actual site requirement and instructions / recommendations of Owner. The unit rate shall be operated to work out the final payment to the contractor.
PIPELINE LAYING LIASIONING & CO-ODRINATION (INCLUDING UTILITY CROSSING) AND OBTAINING PERMISSION / NOC FROM THE STATUATORY / CONCERNED AUTHORITIES. ASSISTANCE IN ROU OPENING & CLOSING AND THEIR MAINTAINENCE/ MANAGEMENT. (EXCLUDING STANDALONE CROSSINGS)
Submitting request for (after obtaining the letter from client) permission , follow up , assisting in site inspections / route suevey / site report making/making site inspection drawings , submitting at designated offices , resubmission after correction , modification if required , soft and hard copy in nos. as required /if required in sizes , and collecting permission from the statuatory authorities including NHAI , PWD , Railways , Irrigation , Forest , Municipal Corporation, District administration, River Authority,SEZ etc. Obtaining work permits /NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations /conditions/recommendations of the said authorities. Only statutory fees shall be paid by the owner. Assistance in required length and width/restricted width of ROU opening & closing and their maintainence/ management both side of the crossings.
ii) Above price shall be inclusive of all type of taxes & duties, transit insurance during transportation & other insurance etc. including all financial & commercial implication as per the tender document. No other payment except as per quoted unit rate & executed quantities will be payable by the Owner.
iii) Safe storage of transported linepipe till installation , reconcillation & handingover to client shall be part of the above item.Contractor has been advised to quote accordingly.
TRANSPORTATION OF FITTINGS, FLANGES, VALVES, BARREL, ANY OTHER MATERIAL EXCEPT LINE PIPE AS PER PROJECT REQUIREMENT ..ETC FROM OUTSIDE RANCHI GA
"Receiving and taking over", handling, lifting, loading on truck, transportation and unloading of Company supplied DRS/MRS/, Metering Skids, fittings, flanges and valves ...etc from any storage yard (other than the designated storage yard for the project) to worksite / contractor's storage yard/ any other storage yard or as decided by EIC. The above work also includes stacking the DRS/MRS/Metering Skids, flanges, fittings and valves etc. properly. Above work shall be carried out as per standard drawing, specification, instruction of Owner and other provision of contract document.
iii) Safe storage of transported material till installation shall be part of the above item.Contractor has been advised to quote accordingly.
TEMPORARY CATHODIC PROTECTION WORKS
Design, detail engineering, Manufacturing, Inspection/FAT (Factory acceptance test), supply, Packing, insurance, transportation to site, storage at site, Handling, Transportation, Loading, installation, testing & commissioning of the temporary Cathodic protection system using Mg (Min 5.0 Kg Each) galvanic anodes to protect the external surface of 6"/4" dia x 16 km (appox.) long 3LPE Coated pipeline & associated works at Jamshedupur & Ranchi GA, against corrosion for a design life of minimum 2 year or till commissioning of PCP system whichever is later, as per standard specification for temporary cathodic protection system, Scope of work, Data Sheets & te
nder drawings. Scope shall also include but not limited to the following for completion of jobs:
Soil resistivity Survey & soil/water chemical analysis
Measurement of soil resistivity along the right of way of the main pipeline (At 500mtr Interval at depth of 1.5M, 2.5M & 3.5M) & collection of additional data as per specification for corrosion survey & applicable NACE standard including preparation of Design, detailed engineering, preparation of design document, preparation of Test station schedule & Bill of Material.
Collection of soil & water samples along ROW at depth of 1M, 2M & 3M at every 5 km interval (Min 03 sample at each location) for its chemical & microbial analysis along the pipeline route as per specification for corrosion survey & NACE Standard TM0106-2006 for detection of SRB, ARB & Total dissolved H2S etc.
Sacrificial anodes- Pre packed Mg anodes
Prepacked Magnesium anodes for Carrier/Casing Pipe protection (Min 5.0 Kg Each) as per tender specification (1/2/3/4 Nos. of anodes). The total nos. of anodes shall be calculated as per the corrosion survey, soil chemical analysis, total weight and current requirement of the pipeline section. However, Min one anode is to be installed at every one KM with test station.
Supply, laying, termination, Glanding and ferruling TCP-Cables--The Cables shall be annealed high conductivity, stranded copper conductor, 650/1100V grade, XLPE Insulated & PVC Sheathed in new/existing test stations and junction boxes.
1c x 6 mm2 - Anode tail cable - unarmored
1 core x 6 mm2 - Potential Measurement, TLP to pipeline, armoured
1 core x 10 mm2 - current measurement cable & Pipeline to Test station- armoured
1 core x 25 mm2 -Bonding, Earthing, Surge diverter, HT line, etc.
Test Stations
New test stations Normal Size-(Weather Proof with IP-55) as per tender drawings with name plate
New test stations Big Size-(Weather Proof with IP-55) suitable for Polarisation Cells as per tender drawings with name plate
All Cable to pipe connections by Exothermic Process or Pin Brazing for all sizes (Upto 1C x 25mm2) for complete TCP system of whole pipeline.
Solid State type Polarisation cells (3.7 kA @ 30 Cycle) for HT power line crossings (66KV & above).
20 Kg Sacrificial Zinc anodes for HT line crossing, Earthing of block valves on Cathodically Protected portion of pipeline.
Cu-wire mitigator for AC Mitigation encased in low resistance backfill with corrosion inhibitors and braiding (M/s MATCOR make or equivalent) (20 Mtr wire shall be installed on each side of HT crossing, Cables running parallel etc).
Solid state Surge Diverters rating 100 kA (10/350 uS) for Insulating Joints.
HDPE sheet (Non-toxic and Rodent Resistant, 6mm thick & 5000mm wide (1200mmx5)) between the GAIL pipeline and the other CP protected foreign pipelines at the crossing locations for providing electrical isolation.
Supply, installation, testing, commissioning of the complete earthing protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including all associated civil work with all material and labour as per specification and drawings approved by the company.
Earthing Electrodes 65mm dia x 3mtr long & 4.5 mm thick GI pipe for earthing of cathodically unprotected pipeline at CNG station/consumer station/DRS station/Metering skid and earthing. Total grounding resistance shall be limited to 2-3 Ohm max.
GI Strip (50X6) mm
GI Strip (25X3) mm
Copper Strip (25X3) mm
GI Wire (8mm-Stranded), Cu- wire rope (Min 8 mm dia solid) and all balance earthing material including copper strip (50 mm x 2 mm thick) jumper for flanges etc. as per the specification for all stations.
Monitoring of the TCP system, on monthly basis, till commissioning of the permanent cathodic protection system.
Polarisation coupons (100 mmx 100mm) with Magnetic reed switch as per NACE SP 104 with permanent ref cell.
SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGES
Complete work of supply of pipes, fittings and flanges including all taxes, duties, transportation and inspection charges but not limited to the following items in accordance with relevant specifications indicated in clause of SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.
Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshop for fabrication and/ or to work site for field fabrication and erection for all piping items supplied by Contractor.
CARBON STEEL PIPES
6"NB, S40, ASTM A106, Gr. B (Charpy), Seamless, BE
4"NB, S40, ASTM A106, Gr. B (Charpy), Seamless, BE
2" NB, XS, ASTM A106, Gr. B (Charpy), Seamless, BE
1" NB, XS, ASTM A106, Gr. B, Seamless, PE
3/4" NB, S160, ASTM A106, Gr. B, Seamless, PE
FLANGES
Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) (End Thickness to match pipe thickness)
1" NB, Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5), 300#
3/4" NB, Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5), 300#
Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF)
1" NB, Blind Flanges (B-16.5, A105, 125 AARH, RF)
3/4" NB, Blind Flanges (B-16.5, A105, 125 AARH, RF)
1" NB, Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5), 300#
ELBOW, 90° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW
ELBOW, 45° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW
TEE, Equal / Reducing Tee (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW
TEE, Unequal / Reducing Tee (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW
6"X6"X4" (S40 x S40)
4"X4"X2" (S40 x XS)
BARRED TEE (As per Standard Specification and Data Sheets enclsoed) (Bevel end thickness of run & branch size to match with connecting pipe thickness)
6"x6"x6" (As per datasheet)
6"x6"x4" (As per datasheet)
4" x4"x 4" (As per datasheet)
SOCKOLET (A105, SW)
WELDOLET (A105 (Charpy), BW)
6" x 2" (S40 x XS)
4" x 2" (S40 x XS)
Reducer (A 234 Gr. WPB (Charpy), BW)
4" x 2" (S40 x XS)
INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed)
End Caps (A 234 Gr. WPB (Charpy), BW)
2", Sch. XS
Note:a) All butt-welded fitting ends shall generally match the connecting pipe wall thickness; however, in case of any misalignment, the Contractor shall carry out the required end preparation at no extra cost.
B)All couplings, nipples, etc., as required, shall be supplied by the contractor; however, no separate payment shall be made, as the cost is deemed to be included in the erection rate.
c) Quantities mentioned against Item Codes E00100 to F00133 are tentative and may increase or decrease during the execution of the work depending on site requirements. The contractor shall obtain certification of the required material quantities from the EIC before placing any orders. Materials shall be supplied by the bidder within the quoted price, either in multiple lots or as per the Release Order/Sub-Purchase Order, as decided by the EIC..
Supply of Valves
Complete work of supply of valves, including all taxes, duties, transportation, and inspection charges, but not limited to the items specified below, shall be carried out in accordance with the relevant specifications and data sheets indicated in the Scope of Work under the SCC, as well as the drawings, specifications, instructions of the EIC, and all provisions of the Contract Document.
Plug Valves
Ball Valves
6", BW, FB(Fully welded), 300#
4", BW, FB(Fully welded), 300#
2", BW, FB(Fully welded), 300#
Globe Valves
2" NB, XS, ASTM A106, Gr. B (Charpy), Seamless, BE
1" NB, XS, ASTM A106, Gr. B, Seamless, PE
3/4" NB, S160, ASTM A106, Gr. B, Seamless, PE
Note: Quantities mentioned against each above Item Code G00100 to G00131 are tentative and may increase or decrease during execution of work depending upon site requiremen
t. Contractor required to supply materials after assessing the site requirement and in multiple lot or as per Release Order/ Sub Purchase Order wise. All material either in multiple lot or as per Release Order/ Sub Purchase Order wise or as decided by EIC shall be supplied by bidder within the quoted price.
ERECTION OF VALVES (Above Ground)
Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site and installation of all types of valves including assembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of Engineer-in-charge including servicing/ cleaning of valve wherever requried.(This excludes erection of pipeline,other fittings,welding and Radiography)(Payment for welding and Radiography will be done separately under relevant SOR)
Welded Valves (Full Bore/ Reduced Bore)
Flanged Valves (Full Bore/ Reduced Bore)
Sockolet Welded Valve (Ball / Plug / Valves)
Erection of Pipelines (Above Ground) along with all fittings except Valves etc
1" NB, Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5), 300#
Erection of pipelines ( As per P & ID ) (Above Ground)alongwith all fittings etc.including supply of studs,nuts,gasKets etc for making the line single piece for Gas-In and painting as per Specification (Sizes upto 6")
Welding of joints for pipeline erection,fittings and Valves as per Specification (Sizes upto 6")
Hydrotesting of various dia station piping as per Specification (Sizes upto 6")
Note : The above quantity is for aboveground piping only. Erection of underground valves(for Sectionalizing Valves,Tap Off and any other purpose as per the instructions of EIC/GAIL GA Incharge) already covered in mainline SOR.
RADIOGRAPHY
Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding.
FIELD INSTRUMENTS
Supply of Pressure Gauges inclusive of supply of erection accessories as per data sheet. (upto 300#)
Installation, Calibration, Testing & Commissioning of Pressure Gauges inclusive of supply of necessary piping materials/tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/manifolds & hydraulic testing as per installation standard.
Note: Quantities mentioned for above items are tentative and shall be supplied with prior approval of EIC with in the quoted price.
EARTH WORK IN EXCAVATION/ SITE GRADING AND BACKFILLING
Earth work in excavation /site grading in all kinds of soil including soft rock in any plan dimension up to required depth including backfilling of excavated earth at any location in layers of 300mm and compacted up to 95% to its MDD at all heights and depths. Surplus and unserviceable earth shall be disposed up to any lead in all conditions. Soil to be levelled and neatly dressed complete in all respect as per scope of work, detailed construction drawings, technical specifications and direction of the Engineer-in-Charge.
1. This Rate shall be applicable only for excavation which are not included as a part of respective SOR Item.
FIELD INSTRUMENTS
3.Rate to include cost of all labour, tools, tackles, equipment, hire charges, shoring, bailing and pumping out water as required etc. with all bye works and sundry works complete in all respects.
4.NET CUM of excavated quantity in CUM shall be measured for payment.
5. To be read in conjunction with Particular Job Specification.
BRICK WORK
Providing and laying brick work with brick class designation M-5.0 of IS:1077 in Cement Mortar 1:4 (1cement : 4 sand) in steps, load bearing structures, drains, or at any other location at all depths & height for all leads including providing required finishes, curing, scaffolding, etc., complete as per specifications and drawings with all bye-works as per direction of the Engineer-in-charge.
3.Rate to include cost of all labour, tools, tackles, equipment, hire charges, shoring, bailing and pumping out water as required etc. with all bye works and sundry works complete in all respects.
1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC), bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, excavation, PCC M10, plastering with 15 mm thick cement plaster on exposed faces with 1:4 cement mortar( 1 cement : 4 Sand) , painting with bitumen etc. as per requirement with all bye-works and sundry works complete as per drawings.
2. To be read in conjunction with Particular Job Specification.
BRICK WORK
PLAIN CEMENT CONCRETE
Supplying and laying plain cement concrete of grade M 10 with stone aggregate 40mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, mass concrete works, chambers, cable trench, under floors and any other locations, at all levels and locations (which are not covered as part of composite items) as per drawings, specifications and directions of the Engineer-in-charge.
1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.
BRICK WORK
REINFORCED CEMENT CONCRETE
Providing and laying Reinforced Cement Concrete of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, beam, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall etc. including excavation, PCC M10 in mud mat, shuttering, construction joints, bitumen painting on surfaces in contact with soil,supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer-in-charge.
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete.
2. To be read in conjunction with Particular Job Specification.
REINFORCEMENT STEEL
Supplying and Fabricating and Fixing in position HYSD Steel Reinforcements/ TMT Grade Fe-415/Fe 500D conforming to IS1786-2008 at all levels and positions including the Cost of transportation, Straightening, Cutting, Bending, Cranking, Binding, Welding, Provision of necessary Chairs and Spacers, Preparation of bar bending schedule, getting the same approved by EIC etc., complete as per Drawings and Specifications and including Cost of binding wire, Labour etc., all complete in all respects as per scope of work, detailed construction drawings, technical specifications and
BRICK WORK
direction of Engineer-in-charge. The Chairs and Spacer Bars provided will not be measured for payment.
Supplying and laying plain cement concrete of grade M 10 with stone aggregate 40mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, mass concrete works, chambers, cable trench, under floors and any other locations, at all levels and locations (which are not covered as part of composite items) as per drawings, specifications and directions of the Engineer-in-charge.
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as steel Reinforcement, binding wire and other minor construction materials, testing etc. all bye works and sundry works.
2. Chairs, Laps, Spacers, Wastage etc. shall be to contractor's account.
3. To be read in conjunction with Particular Job Specification.
CONCRETE PAVEMENT
Providing and laying reinforced cement concrete pavement 150 mm thick in M-25 grade with 20 mm and down grade crushed stone aggregate in pavement, including earthwork in excavation, preparation of base (i.e. compacted subgrade, 200 thk sand and 100 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen sand mix filler material etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge.
150mm thick in Pavements in Process Areas (Type - I)
1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, providing and fixing reinforcement steel, shuttering, earthwork in excavation and backfilling using serviceable earth in all conditions, preparation of base, etc. with all bye works and sundry works. Cost of works towards pipe supports & sleepers being raised from pavement is covered under respective RCC items.
VALVE PIT
Construction and handing over of RCC Valve Pit as per tender drawing, technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per tender drawing.
Construction and handing over of RCC Valve Pit of approx. 3.0 m x 1.6 m in size (internal dimension) as per technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per Sketch attached with the tender.
Construction and handing over of RCC Valve Pit of approx. 2.5m x 1.7 m in size (internal dimension) as per technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per Sketch attached with the tender.
Construction and handing over of RCC Valve Pit of approx. 2.0m x 1.6 m in size (internal dimension) as per technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per Sketch attached with the tender.
STEEL STRUCTURAL WORKS
Steel structure Fabrication
Supplying, Fabricating & Erecting in position steel structures fabricated out of MS Girders, channels, Tees, angle, flats, plate, square hollow sections pipes etc. conforming to IS:2062 and/or from pipes conforming to IS:1161 for structural purpose for cascade supporting structure, loading/unloading platform, Gratings for platform, catladder,handrails, hoardings for sinages,Lcv stand, etc. of any size/dia for required design including cutting, welding, bolting, hoisting, fixing in position, including application of one coat of primer at shop and second coat of primer at site after erection and two coats of finishing paint at site .The work is to be completed in all respect as per specification ,scope of work, detailed construction drawings and directions of the Engineer-in-charge.
[ Rate to include cost of all labour, nut, bolts, tools, tackles, hire charges royalties, levies, transportation, scrap value, gas cutting, welding, other consumables, paints, compressed air, water, electric power etc. all complete.]
Providing and fixing Fencing Structure
Supplying, fabricating & fixing steel structural fencing fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including applying two coats of approved quality of synthetic enamel paint over a priming coat of in approved shade including supply of all raw materials, bolts, electrodes, transportation, including making pokets & pouring with PCC (1:2:4) in of block 500x500x500 for fixing of posts etc complete as per enclosed drawing, technical specifications,scope of works and directions of the Engineer-In-Charge.
Fencing height 2.1m
Notes:
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
eTender.pdf
Tender Documents • 32.97 MB
BOQ_300582.xls
BOQ • 0.81 MB
Download all tender documents and submit your bid