| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹15.4 L+₹1.2 L (8.20%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹15.5 L+₹1.3 L (8.96%)Admitted-Finance 12 NURUDDIN CHAK DARGAH SHAREEF BAHRAICH BAHRAICH BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical GHASYARI PURA BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | - | Rejected-Technical Bid technically not fit |
| Sl No | Description | Qty | Unit | M/S RADHIKA CONSTRUCTION COMPANY L1 | M/s R.K.Constructions L3 | Raj Kumar Singh L2 |
|---|---|---|---|---|---|---|
| 1.00 | E/w in digging foundation in all type of soil including all lead, lift, royalty, back filling and disposal of surplus earth for proper completion of work. | 2,835.03 | M3 | 50 ₹1,41,751.5 Lowest | 51 ₹1,44,586.53 | 91 ₹2,57,987.73 |
| 2.00 | Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 16.1 | M3 | 10,000 ₹1,61,000 | 10,555 ₹1,69,935.5 | 9,000 ₹1,44,900 Lowest |
| 3.00 | Laying cement concrete in 1:2:4 with 10 to 20 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 1.19 | M3 | 11,000 ₹13,090 | 11,400 ₹13,566 | 9,000 ₹10,710 Lowest |
| 4.00 | Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc. | 105.27 | M3 | 150 ₹15,790.5 Lowest | 370 ₹38,949.9 | 350 ₹36,844.5 |
| 5.00 | Laying RCC in 1:1.5:3 with 10 to 20 mm size crushed Kabrai stone ballast and Hamirpur coarse sand having FM not less than 2.00 including all taxes, cost of all material, labour & T&P etc. With manual compaction required for proper completion of work. | 47.48 | M3 | 11,000 ₹5,22,280 | 11,870 ₹5,63,587.6 | 9,100 ₹4,32,068 Lowest |
| 6.00 | Centering & shuttering for R.C.C. work including cost of all material , labour and T&P etc. required for proper completion of work | 399.03 | M2 | 350 ₹1,39,660.5 Lowest | 370 ₹1,47,641.1 | 360 ₹1,43,650.8 |
| 7.00 | Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, Steel, Labour and T&P etc. required for proper completion of work . Note- Reinforcement steel bars should be used only Steel Authority of India Limited ( SAIL)/ TATA TMT bars. | 4.21 | MT | 83,000 ₹3,49,513 Lowest | 88,200 ₹3,71,410.2 | 88,662 ₹3,73,355.68 |
| 8.00 | Dewatering Hiring charges of 5 H.P. diesel pump/Gen set includingoperator and P.O.L for running hours as per SOR Chap.-I/1-B/2(j) | 1,566.6 | Kwh | 5 ₹7,833 Lowest | 14.5 ₹22,715.7 | 35 ₹54,831 |
| 9.00 | Supply laying and fixing 150 MM dia Hume pipe of Approved make including cost of all labour, material, T&P etc. complete | 54 | RM. | 1,200 ₹64,800 | 920 ₹49,680 | 900 ₹48,600 Lowest |
| 10.00 | E/W in embankment for making bundha in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work including all taxes but excluding G.S.T. | 201 | M3 | 10 ₹2,010 Lowest | 78 ₹15,678 | 100 ₹20,100 |
Tender Value
₹18.1 L
EMD Value
₹36,000
Closing Date
27 Jul 2026, 1:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER SARYU NAHAR KHAND-3 BAHRAICH
Construction of Kulaba at (Km.0.250 RB, Km.0.300 LB, Km.0.600 LB, Km.0.600 RB, Km.1.100 LB, Km.1.140 RB, Km.1.460 RB) Persohana Minor
2026_UPIDC_1171098_1
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
PERSOHNA BHINGA SRAWASTI
Plz refer Tender Documents
3 documents required · 3 mandatory
₹854
₹36,000
Yes
3 Oct 2026
21 Jul 2026
27 Jul 2026
21 Jul 2026
27 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in digging foundation in all type of soil including all lead, lift, royalty, back filling and disposal of surplus earth for proper completion of work. | 2,835.03 | M3 | - | - |
| 2 | Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 16.1 | M3 | - | - |
| 3 | Laying cement concrete in 1:2:4 with 10 to 20 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 1.19 | M3 | - | - |
| 4 | Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc. | 105.27 | M3 | - | - |
| 5 | Laying RCC in 1:1.5:3 with 10 to 20 mm size crushed Kabrai stone ballast and Hamirpur coarse sand having FM not less than 2.00 including all taxes, cost of all material, labour & T&P etc. With manual compaction required for proper completion of work. | 47.48 | M3 | - | - |
| 6 | Centering & shuttering for R.C.C. work including cost of all material , labour and T&P etc. required for proper completion of work | 399.03 | M2 | - | - |
| 7 | Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, Steel, Labour and T&P etc. required for proper completion of work . Note- Reinforcement steel bars should be used only Steel Authority of India Limited ( SAIL)/ TATA TMT bars. | - | MT | - | - |
| 8 | Dewatering Hiring charges of 5 H.P. diesel pump/Gen set includingoperator and P.O.L for running hours as per SOR Chap.-I/1-B/2(j) | 1,566.6 | Kwh | - | - |
| 9 | Supply laying and fixing 150 MM dia Hume pipe of Approved make including cost of all labour, material, T&P etc. complete | 54 | RM. | - | - |
| 10 | E/W in embankment for making bundha in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work including all taxes but excluding G.S.T. | 201 | M3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Bid_Doc_Lot1.pdf
Tender Documents • 1.66 MB
BOQ_2198090.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .