| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹4.1 L (3.69%)Rejected-Finance | ₹1.2 Cr+₹4.1 L (3.69%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 Cr+₹8.2 L (7.34%)Rejected-Finance | ₹1.2 Cr+₹8.2 L (7.34%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.2 Cr+₹9.8 L (8.76%)Rejected-Finance | ₹1.2 Cr+₹9.8 L (8.76%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.3 Cr+₹15.2 L (13.6%)Rejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.3 Cr+₹15.2 L (13.6%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISES L6 | MA AND SONS L5 | GOMATINETRA CONSTRUCTIONS L1 | mamber singh L2 | M/S RAJPAL SINGH CONTRACTOR L4 | VIJAY ASSOCIATES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | 140.57 | Cum | 275 ₹38,656.75 | 400 ₹56,228 | 250 ₹35,142.5 Lowest | 400 ₹56,228 | 284.85 ₹40,041.36 | 300 ₹42,171 |
| 2.00 | Surface Dewatering for digging earth etc . | 4,028.4 | KWH | 35 ₹1,40,994 | 10 ₹40,284 Lowest | 50 ₹2,01,420 | 20 ₹80,568 | 11.69 ₹47,092 | 30 ₹1,20,852 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead including back filling, watering and ramming of excavated earth in to the trenches or in to the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as direction by the engineer-in-charge. | 1,027.9 | Cum | 70 ₹71,953 | 90 ₹92,511 | 50 ₹51,395 | 80 ₹82,232 | 45 ₹46,255.5 Lowest | 70 ₹71,953 |
| 4.00 | Providing and laying C.C. (A20 M15) (1:2:4) including all cost of materials, labour & T&P etc.complete. | 255.6 | Cum | 5,600 ₹14,31,360 | 5,600 ₹14,31,360 | 5,000 ₹12,78,000 Lowest | 5,000 ₹12,78,000 Lowest | 5,865.51 ₹14,99,224.36 | 5,500 ₹14,05,800 |
| 5.00 | Providing and laying R.C.C. (A20 M20) (1:1.5:3) including all cost of materials, labour & T&P etc.complete. | 134.68 | Cum | 5,900 ₹7,94,612 | 6,400 ₹8,61,952 | 6,000 ₹8,08,080 | 5,500 ₹7,40,740 Lowest | 6,610.56 ₹8,90,310.22 | 6,800 ₹9,15,824 |
| 6.00 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, T&P and labour etc.complete. | 595.18 | Cum | 7,750 ₹46,12,645 | 8,000 ₹47,61,440 | 7,000 ₹41,66,260 | 6,700 ₹39,87,706 Lowest | 7,279.04 ₹43,32,339.03 | 7,400 ₹44,04,332 |
| 7.00 | Ordinary Centering and shuttering work including all cost of materials, T&P and labour etc.complete. | 474.06 | Sqm | 600 ₹2,84,436 | 450 ₹2,13,327 | 250 ₹1,18,515 Lowest | 600 ₹2,84,436 | 731 ₹3,46,537.86 | 400 ₹1,89,624 |
| 8.00 | Special Centering and shuttering work including all cost of materials, T&P and labour etc.complete. | 1,184.85 | Sqm | 900 ₹10,66,365 | 600 ₹7,10,910 | 400 ₹4,73,940 Lowest | 700 ₹8,29,395 | 805 ₹9,53,804.25 | 500 ₹5,92,425 |
| 9.00 | Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 42.94 | M.T. | 67,000 ₹28,76,712 | 72,000 ₹30,91,392 | 70,000 ₹30,05,520 | 70,000 ₹30,05,520 | 63,239.44 ₹27,15,248.6 Lowest | 70,000 ₹30,05,520 |
| 10.00 | Providing and fixing P.V.C. pipe 110mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc.complete.. | 10 | R.M. | 50 ₹500 Lowest | 200 ₹2,000 | 220 ₹2,200 | 200 ₹2,000 | 263.2 ₹2,632 | 250 ₹2,500 |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
12 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1068184_17
02/SE-1/2025-26
Open Tender
Civil Works
Piece-work
180 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3 L
SE OFFICE 1ST IWC MEERUT
26 Oct 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
10 Sept 2025
Amount
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge
Surface Dewatering for digging earth etc .
Earth work in foundation in all types of soil including all lift and all lead including back filling, watering and ramming of excavated earth in to the trenches or in to the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as direction by the engineer-in-charge.
Providing and laying C.C. (A20 M15) (1:2:4) including all cost of materials, labour & T&P etc.complete.
Providing and laying R.C.C. (A20 M20) (1:1.5:3) including all cost of materials, labour & T&P etc.complete.
Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, T&P and labour etc.complete.
Ordinary Centering and shuttering work including all cost of materials, T&P and labour etc.complete.
Special Centering and shuttering work including all cost of materials, T&P and labour etc.complete.
Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work.
Providing and fixing P.V.C. pipe 110mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc.complete..
Providing and laying Thermacol sheet in expention joint including all cost of materials, T&P and labour etc.complete.
Providing & dumping 20-40 Kgs. Boulder in Aprons of floor of head regulator within 30M lead including all cost of materials, T&P and labour etc.complete.
Earth work for filling in Approch road and strengthening of banks including all lift and all lead with ramming and dressing, proper completion of work as per direction of Engineer-in-charge.
Providing and laying one layer of tarfelt including all cost of materials, T&P and labour etc.complete.
Supply & fixing 6mm thick rubber water seal of approved quality in construction/ contraction joint as per drawing complete in all respect.
Providing & laying 1st class (M-150) Brick work pitching in 1:4 with cement, Coarse sand including all cost of materials, T&P and labour etc.complete.
Providing struck deep pointing in 1:2 with cement and coarse sand motar including all cost of materials, T&P and labour etc.complete.
Distempring two coat with oil bound distemper of approval brand and manufacture and of required shade on undercoated wall surface to given an even shade an including a priming coat cement primenr of approved brand and manufecture such as barger,j&n,asian paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials.
Painting Letter including cost of material for writing chainage of vrb & name including all cost of materials, T&P and labour etc.complete.
Proving and fixing of retro-reflectorised coutionary, mandatary and informatory sign as per IRC 67:2012 made of high intensity grade sheeting wide clause 801.3, fried over aluminium sheeting tyes iv 1.5mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with m15 grade cement concrete 45cmx45cmx60cm below ground level as per approved drawing the retro-reflectective sheeting shall be tested for 3 year outdoor weathering test an indian condition etc complete
Removing Bandha etc. including all lift and all lead with ramming and dressing, proper completion of work .
Supplying and laying Over burnt brick kharanja with local sand filling in joints including all cost of material labour and T&P etc.
mamber singh (BID ID -5530224)
VIJAY ASSOCIATES (BID ID -5521386)
M/S RAJPAL SINGH CONTRACTOR (BID ID -5529667)
MA AND SONS (BID ID -5530332)
SHIVAM ENTERPRISES (BID ID -5529398)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .