Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.1 LAdmitted-Finance | ₹90.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Technical LOCATION HARYANA HR | GURUGRAM | HARYANA | 122001 | - | - | Not Admitted-Technical Not Complied with technical specification |
| 4 | Not Admitted-Technical | - | - | Not Admitted-Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | KIRPAL SINGH CONTRACTOR L1 | Sube Ram Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (more then 20 HP) for 19 month (From the date of commencement ) and all other works mentioned in Scope of Work. 390 BHP x 19 Month = Total 7410 BHP. | 7,410 | Per BHP | 300 ₹22.2 L | 400 ₹29.6 L |
| 2.00 | Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (upto 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 40 BHP x 19 Month = Total 760 BHP. | 760 | Per BHP | 300 ₹2.3 L | 400 ₹3.0 L |
| 3.00 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (more then 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 1150 BHP x 19 Month = Total 21850 BHP. | 21,850 | Per BHP | 300 ₹65.5 L | 400 ₹87.4 L |
Tender Value
₹32.2 L
EMD Value
₹64,478
Closing Date
8 Dec 2025, 3:00 pmClosed
BHANU PARKASH SHARMA
Jind PHED No. 1
Repair/ Rewinding of Pumping Machinery of Jind town.
2025_HRY_485426_1
20255E4EB174 793B 4CAA 8A7A 73E9B72F3DFB568PUH
Open Tender
Civil Works
570 days
Jind
4 documents required · 4 mandatory
₹2,500
₹64,478
Yes
13 May 2026
25 Nov 2025
8 Dec 2025
25 Nov 2025
8 Dec 2025
25 Nov 2025
Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (more then 20 HP) for 19 month (From the date of commencement ) and all other works mentioned in Scope of Work. 390 BHP x 19 Month = Total 7410 BHP.
Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (upto 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 40 BHP x 19 Month = Total 760 BHP.
Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (more then 20 HP) for 19 month (From the date of commencement) and all other works mentioned in Scope of Work. 1150 BHP x 19 Month = Total 21850 BHP.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_563459.xls
BOQ • 0.31 MB
0G23ULZ130036.pdf
Additional Documents • 2.02 MB
OT0130036.pdf
Other Document • 2.02 MB
Download all tender documents and submit your bid