Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹87.3 LAdmitted-Finance | -1.00% | ₹87.3 L | L1 | Admitted-Finance |
Tender Value
₹88.2 L
EMD Value
₹1.8 L
Closing Date
6 Apr 2026, 12:00 pmClosed
DCF north udaipur
Near Gulab Baag
Gogunda Range Gabian Construction work 45 nos.
2026_FORES_548430_1
E-168/2025-26
Open Tender
Civil Works
180 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
refer tender document
₹1.8 L
Yes
21 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Gabion Construction work | |||||
| 2Excavation including loading unloading disposal and dressing of excavated earth within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de- watering wherever required complete in all respect. 1C ,Hard Soil Mixed with kankar ,boulder morrum | |||||
| 3Providing and laying in postion of Cement concrete Nominal mix (1:4:8) including leads of all construction material, curing, compaction and finishing with rendereing in cement sand mortar 1:3 (1 cement :3 coarse sand ) and making good the joints excluding the cost of centering ,shuttering and reinforcrmrnt . Well graded crusher broken stone aggregate of maximum size upto:40mm | |||||
| 4Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In foundation - in ratio C:M- 1:6 | |||||
| 5Dry stone masonry including all leads of all construction materials. | |||||
| 6Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio :In Cement sand mortar 1:4 | |||||
| 7Side shuttering including propping etc. complete (to achieve fininsh F2) : )Block joints of foundation stilling basins buckets, apronsetc. (non suspended horizontally laid mass concrete on coping | |||||
| 8Providing and laying in postion of Cement concrete Nominal mix (1:2:4) including leads of all construction material, curing, compaction and finishing with rendereing in cement sand mortar 1:3 (1 cement :3 coarse sand ) and making good the joints excluding cost of centering and shuttering and reinforcement . Well graded crusher broken stone aggregate maxmimum size upto 20mm (BSR ch.9 item no 7d) | |||||
stage.html
html • 0.03 MB
technical_977764.pdf
techsummary_977764.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
nit168.pdf
Tender Documents • 14.29 MB
BOQ_977764.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid