Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | -3.03% | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 L+₹7,883.37 (2.09%)Admitted-Finance | -1.00% | ₹3.8 L+₹7,883.37 (2.09%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Renewal Reciept of Contractor Card duly Signed by Executive Engineer is upto ending march 2026 which has expired. |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Treasury Challan date before the Publishing of tender and closing date. Forged Challan used in different work. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-CDR copy uploaded is not clearly visible. Credentials of depositor not verifiable. Seal and Stamp of vendor not available on affidavit. |
Tender Value
₹3.9 L
EMD Value
₹7,760
Closing Date
7 Sept 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
P/work near H/O naresh kumar and charran jeet s/O gashu ram and others wno 3
2026_RDPR_322850_2
e-NIT No.202/REW/K of 2026-27 Dated 31/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Mahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,760
17 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil : | 23.46 | Cum | 479.3 | ₹11,244.38 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.57 | Cum | 4,826.5 | ₹17,230.61 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 45 | Cum | 5,733.6 | ₹2,58,012 |
| 4 | Dumping of stone including cost of stones in horizontal on level. | 19.36 | Cum | 937.9 | ₹18,157.74 |
| 5 | Providing and fixing on un-plasticized Rigid PVC rain waterpipes conforming to IS: 13592 Type A 75mm dia. | 49.64 | m | 226.15 | ₹11,226.09 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 88.4 | Sqm | 286.35 | ₹25,313.34 |
| 7 | Carriage of Sand for 38 Km by MT | 22.91 | cum | 608.66 | ₹13,944.4 |
| 8 | Carriage of Agg. Below 40 mm for 38 Km by MT | 40.2 | cum | 608.66 | ₹24,468.13 |
| 9 | Carriage of Agg. Above 40mm for 38 Km by MT | 3.18 | Cum | 661.64 | ₹2,104.02 |
| 10 | Carriage of stone for 8 Km by MT | 19.36 | Cum | 291.45 | ₹5,642.47 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.04 MB
BOQ_1084734.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .