Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC Due to lowest amount | |
| 2 | L2₹7.3 L+₹1.5 L (25.1%)Rejected-Finance | L2 | Rejected-Finance due to 2nd lowest amount | |
| 3 | L3₹7.4 L+₹1.6 L (27.2%)Rejected-Finance H NO G162 SECTOR 10 FARIDABAD 121006 | FARIDABAD | FARIDABAD | HARYANA | 121006 | L3 | Rejected-Finance due to 3rd lowest amount |
Tender Value
Refer Docs
EMD Value
₹16,200
Closing Date
31 May 2021, 5:00 pmClosed
Manoj Kumar, XEN
HSVP office complex Sec-12 Palwal
Maintenance of sewer line including attending day to day complaint and constant security of sewer line fixtures in Sector2 Palwal and all other works contingents thereto.
2021_HBC_170980_2
340/EE/HSVP Divsion Palwal
Open Tender
Civil Works
Works
365 days
Sector-2
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹16,200
28 Oct 2021
24 May 2021
2 Jun 2021
24 May 2021
31 May 2021
24 May 2021
Amount
Providing Service for attending day to day complaints of different size of sewer line and watch & ward of the area in Sector-2 , Palwal including EPF, ESI etc. The mtc. job including the work of cleaning desilting of sewer lines and manholes by mechanically, plugging-out the sewer line, active redressal to sort out the day to day complaints/occasionally pumping required if any, on sewer line in order to maintain smooth running and operation of sewerage system. The contractor shall provide all kinds of safety equipments, gogals, gum boots, uniform, raincoat, soap, mustered oil and other material to the sewer man workers engaged on work. All tools & plants and other consumable items such as kassi, chain pulley basket, tourch, bamboo rodding set and any other equipment shall be provided the contractor at his own expenses. Note:- The contractor may keep proper watch & ward with regard to dislocation, misplacement, damage & unauthorized use of machinery. The contractor shall have to give contact No. for getting information of complaints for residents/JE/SDE & the contractor shall have to report back about the compliance to JE/SDE.
MANOHAR LAL
Allied Engineers and Errectors
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .