18 Sept 2026, 3:00 pm6d left
CPO-WEST ZONE
DRAIN CONSTRUCTION AT TT GANTRY INDORE LPG PLANT
2600027839-HD-07350
5100027839
Open Tender
Two Bid
Indore, Madhya Pradesh
₹0
₹29,000
28 Aug 2026
28 Aug 2026
18 Sept 2026
18 Sept 2026
28 Aug 2026 - 4 Sept 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | excavation | excavation — As per scope of work | - | cubic meter |
| 2 | RCC EXCAVATION | RCC EXCAVATION — EXCAVATION : EARTH WORK IN EXCAVATION IN HARD ROCK, PCC AND RCC, UPTO A DEPTH OF 0.3 M FROM EXISTING GROUND LEVEL. CONTRACTOR MAY USE DRILLING/BREAKING UNITS/MACHINES TO BREAK INTO THE RCC/PCC. ALL ITHERS TERMS ARE OF SOFT ROCK EXCAVATION. | - | cubic meter |
| 3 | PROVIDING LAYING PCC | PROVIDING LAYING PCC — PROVIDING AND LAYING PCC (1:2:4) AS PER TECHNICAL SPECIFICATIONS AS PER SOR | - | cubic meter |
| 4 | REINFORCEMENT BAR | REINFORCEMENT BAR — SUPPLY, FABRICATION, TYING AND LAYING IN POSITION TMT (THERMO MECHANICALLY TREATED) STEEL REINFORCEMENT CONFORMING TO IS 1786, FE-415 (LATEST EDITION) MANUFACTURED BY SAIL/TISCO/RINL. JOB INCLUDES, CUTTING, COLD BENDING, TYING WITH 20 SWG BLACK ANNEALED BINDING WIRE AND PLACING IN POSITION AT ALL HEIGHTS/LINE/LEVELS ETC., COMPLETE IN ALL RESPECTS AS PER STANDARD SPECIFICATION AND AS PER DIRECTION OF EIC. LAPS, CHAIRS AND SPACER BARS SHALL NOT BE CONSIDERED FOR MEASUREMENT AND PAYMENT PURPOSES. JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION/CODAL PROVISIONS/ SOUND ENGINEERING PRACTICES AND AS DIRECTED BY EIC COMPLETE | - | Metric ton |
| 5 | LAYING RCC OF GRADE M 25 | LAYING RCC OF GRADE M 25 — 1. Supplying and providing of approved design mix, reinforced cement concrete of (moderate) M-25 (excluding shuttering and reinforcement) with 20 mm and down size stone aggregates at specified depths and heights including curing and testing in all types of foundations, footings, equipment foundations, columns, pedestals, wall, lintels, plinth beams, brackets, parapets, bands and any other works all complete as per drawings, specification and instruction of engineer. 2. rate also to include necessary polythene sheets of approved quality to be placed before laying the concrete in case of rcc driveways, floors and wherever required and directed by hpcl eic. for design mix, moderate exposure shall be considered and water cement ratio shall be limited to 0.5. design mix shall be as per is:456-2000 and is: 10262 and same shall be carried out by a lab/agency/institution approved by hpcl. 3. RCC will be permitted based on prior inspection by hpcl. Cement would be ordinary portland cement. | - | cubic meter |
| 6 | SPLY & FAB OF STRUCTURE | SPLY & FAB OF STRUCTURE — S/F/P OF STRUCTURE STEEL: SUPPLY, FABRICATION AND ERECTION OF STRUCTURE/GRATING IN POSITION; BOLTED AND/OR WELDED STRUCTURAL STEEL WORKS AT ALL LEVELS; INCLUDING ALL BUILT-UP SECTIONS/COMPOUND SECTIONS MADE OUT OF ROLLED SECTIONS AND/OR PLATES IN TRUSSES; RAFTERS; PURLIN; WIND TIES; COLUMN; PORTALS; PLATFORMS; STAIRCASES; LADDERS; STOPPERS; BRACKETS SAG RODS; SUPPORTS FOR EQUIPMENT AND ACCESSORIES; HAND RAILINGS POSTS CUTTING TO REQUIRED SIZE AS PER APPROVED DRAWINGS; STRAIGHTENING IF REQUIRED BOLTING/WELDING OF JOINTS, NOTE:1. ALL STRUCTURAL STEEL SHALL OF APPROVED MAKE STEEL (AS PER HPCL APPROVED LIST), 2. PAINTING SPECIFICATIONS: THE COST INCLUDES SURFACE PREPARATION BY MANUAL CLEANING. PRIMER COAT: AFTER SURFACE PREPARATION ONE COAT OF INORGANIC ZINC SILICATE AT 65 MICRONS. INTERMEDIATE COAT: ONE COAT OF EPOXY HIGH BUILT MIO AT 100 MICRONS. TOP FINISH COAT:2 COATS OF ACRYLIC ALIPHATIC POLYURETHANE AT 30 MICRONS PER COAT. TOTAL DFT 225 MICRONS MINIMUM. THE RATE INCLUDES THE COST OF MATERIALS, CONSUMABLES, LABOUR, TOOLS, TRANSPORTATION, LOADING, UNLOADING, MACHINERY, SAFETY REQUIREMENT, INCIDENTAL CHARGES, IF ANY, ALL COMPLETE. 3. PREPARING DRAWING OF STRUCTURAL STEEL IS IN VENDOR COPE, DRAWING APPROVAL NEED TO BE TAKEN FROM LOCATION-IN-CHARGE. NOTE: SUPPLY OF ALL REQUIRED MACHINERIES LIKE. HYDRA, JCB, BREAKER, AND TOOLS-TACKLES ETC. WILL BE IN VENDOR SCOPE. | - | kilogram |
| 7 | SAND FILLING -SUPPLY & | SAND FILLING -SUPPLY & — SAND FILLING -SUPPLY & LAYING AS PER ATTACHMENT. | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600027839-HD-07350.pdf
TENDER_DOCUMENT • 20.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .