| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JANANI ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking debris of existing control room floor tiles including cost of all materials , lead , lift & transport etc. | 8 | m2 | 61.27 ₹490.16 Lowest |
| 2.00 | Dismantling, clearing away and carefully stacking debris of existingbattery room PCC (Flooring concerte) | 1.46 | m3 | 486.2 ₹709.85 Lowest |
| 3.00 | Dismantling, clearing away and carefully stacking debris of existing battery Stone mansory including cost of all materials , lead , lift & transport etc | 1.1 | m3 | 283.14 ₹311.45 Lowest |
| 4.00 | Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil | 11.3 | m3 | 124 ₹1,401.2 Lowest |
| 5.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. | 1.95 | m3 | 6,042.2 ₹11,782.29 Lowest |
| 6.00 | Brick work in CM 1:5, using good quality chamber bricks for super structure of size 23 x 11 x 7 cm including cost of all materials, labour, lead, lift, curing and transporting etc., complete. | 4.85 | m3 | 6,669.27 ₹32,345.96 Lowest |
| 7.00 | Plastering with CM 1:5, 12mm thick for inside and out side walls including cost of all materials, labour, lead, lift etc., complete. | 54.85 | m2 | 269.7 ₹14,793.05 Lowest |
| 8.00 | Colour washing two coats by using cement paint over primer one coat of approved quality and colour for yard wall including cost of all materials ,labour lead lift curing etc complete. | 46.6 | m2 | 215 ₹10,019 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for precast slab & Road Crossing culvert with form work including all cost labour materials lead lift curing etc complete but excluding cost of steel reinforcement ( By using mixer machine and vibrator ) | 0.15 | m3 | 8,793 ₹1,318.95 Lowest |
| 10.00 | Supplying and fabrication and placing in position MS/ RTS steel reinforcement for RCC works including labour for curing , bending, tying and fixing in position including cost of all materials, lead, lift, binding wire etc., complete. | 0.01 | MT | 90,024 ₹900.24 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,651
Closing Date
6 Aug 2025, 2:00 pmClosed
SE/TEDC/TPR
Office of The Superintending Engineer Office TEDC Tirupattur
Providing new cable duct with slabs for placing new twin c and R panels under RDSS scheme and providing new partition wall in battery room in pakkam 110 KV SS
2025_EB_587623_1
T.S.C.No.132025-2026
Open Tender
Civil Works
Item Rate
Pakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,651
11 Aug 2025
31 Jul 2025
7 Aug 2025
31 Jul 2025
6 Aug 2025
31 Jul 2025
Amount
Dismantling, clearing away and carefully stacking debris of existing control room floor tiles including cost of all materials , lead , lift & transport etc.
Dismantling, clearing away and carefully stacking debris of existingbattery room PCC (Flooring concerte)
Dismantling, clearing away and carefully stacking debris of existing battery Stone mansory including cost of all materials , lead , lift & transport etc
Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m - In Hard Gravely Soil
PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete.
Brick work in CM 1:5, using good quality chamber bricks for super structure of size 23 x 11 x 7 cm including cost of all materials, labour, lead, lift, curing and transporting etc., complete.
Plastering with CM 1:5, 12mm thick for inside and out side walls including cost of all materials, labour, lead, lift etc., complete.
Colour washing two coats by using cement paint over primer one coat of approved quality and colour for yard wall including cost of all materials ,labour lead lift curing etc complete.
RCC 1:1.5:3 mix using 12mm to 20mm HBG metal (machine crushed) for precast slab & Road Crossing culvert with form work including all cost labour materials lead lift curing etc complete but excluding cost of steel reinforcement ( By using mixer machine and vibrator )
Supplying and fabrication and placing in position MS/ RTS steel reinforcement for RCC works including labour for curing , bending, tying and fixing in position including cost of all materials, lead, lift, binding wire etc., complete.
Supply and fixing of MS angle for cable duct and MS square channel for placing C&R panels including aligining in position including labour lead, lift etc., complete.
Labour charges for Transport of Pre cast slab, including aligining in position including labour lead lift etc., complete.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .