Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC ADAM KANAN JHARGRAM 721507 | JHARGRAM | WEST BENGAL | 721507 | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.2 L+₹2,054.27 (0.25%)Rejected-Finance 211 2 NARAYANTALA EAST BAGUIHATI KOLKATA | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.3 L+₹4,108.19 (0.50%)Rejected-Finance GHORADHARA JHARGRAM | L3 | Rejected-Finance L3 | |
| 4 | L4₹8.3 L+₹6,162.60 (0.75%)Rejected-Finance MAITANA BATTALA PURBA MEDINIPUR | MEDINIPUR EAST | WEST BENGAL | 721130 | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹32,500
Closing Date
16 Feb 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Government of West Bengal Office of the Executive Engineer, Midnapore Mechanical Division P.H. Engineering Directorate Inda P.H.E. Complex, Kharagpur
Stand alone water supply arrangement at Ghatal Basanta Kumari Girls High School, Block - Ghatal, District - Paschim Medinipur under MMD, P.H.E.Dte.
2021_PHED_324971_1
WBPHE/EE/MMD/NIeT-17OF2020-21
Open Tender
Electrical Work/ Equipment
Item Wise
15 days
Kharagpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹32,500
26 Feb 2021
9 Feb 2021
19 Feb 2021
10 Feb 2021
16 Feb 2021
10 Feb 2021
150 days
Geophysical investigation of the acquifer by electrologging systems with all tools and plants as necessary including supply of necessary report.
Boring through any type soil for sinking Tube well of Required dia with up to top enlargement by Rig Boring system (either by reverse circulation system or by direct rotary method/Combination method) including hire charges and labour for Rig machine, tools, plants, staging, force pumping set and making arrangement for water required for boring etc complete and lowering of pipes strainers, blind pipes etc. complete(where no lowering pipe is involved corresponding rate would be reduced 30%). For 125 mm X 80 mm dia Tube well (For 2 nos T/W) a) First 50 mtr
b) Next 50 mtr
c) Next 25 mtr
Supply and Delivery of following materials at site: a) ф 125 mm UPVC rigid pipe and fittings(medium duty) conforming to ASTM D 1785 (Schedule 80)threaded pipes . (Make:Oriplast/Karan/Dupol/Aquaduct/JISL/BANSAL/ Approved Make
b) ф 80 mm UPVC rigid pipe and fittings(medium duty) conforming to ASTM D 1785 (Schedule 80)threaded pipes . (MakeOriplast/Karan/Dupol/Aquaduct/JISL/BANSAL/Approved Make)
c) ф 80 mm high density polythene strainer/uPVC ribbed screen(Maximum slot width 0.5 mm) of approved make with adapter /socket end conforming to IS-12818: 1992.
d) ф 80 mm Buttom Plug.
e) Ø125mm X Ø80mm dia UPVC reducing socket.
f) Centre Guide of approved quality for ф 125mm pipe
g) Housing Clamp for ф125 mm made of (G.I/M.S)
h) ф 125mm Top Cap(G.I/M.S).
Collecting sample of water for bactrological and chemical test from any depth during execution of work with sterilising of the equipments, paying all charges and fes, testing etc. complete in all respect including submission of test report as per direction of EIC
Packing the annular space between the outside of the Tube Well pipes and strainers and the bore with pear size washed gravel of approved quality having size from 02 mm to 05 mm or the size approved by the EIC. Including cost of all materials labour and equipment complete
Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and plants and scaffolding as required upto entire satisfaction of E.I.C.
Arrangement for yield test by hire charges of Submersible pump including generator and all other accessoreies etc. with measurement draw down in every 30 minutes of interval for minimum 5 times with total pumping hours of 6(six) hours and transportation loading, unloading etc. of necessary equipmetns all complete including cost of fuels and lubricants, labour etc. as per direction of E.I.C.
Construction of Platform :- Excavation of earth for construction of 1.58 mtr. Dia by works at the ratio 1:2:4 Cement Concrete platform ( plaster with net polished cement finish) with ф 20 mm down stone chips (crusher broken) max. length 2.5 mtr. Of a average drain (minimum) so far as practically feasible in site as per departmental type and design with 1:50 slope grouting fitting fixing of Pedestal in complete. After proper curing of platform removing of the steel shutter as per direction of E.I.C. Rates are inclusive of the cost of Coarse sand, Stone Chips, cement etc. to complete the platform as per enclosed drawing and direction of EIC.
Supplying, installation and lowering in position solar Panel based AC Submersible pumping machinery (Preferably with stainless steel fabricated components) with solar cable & cable connector kit, PV Panel (IEC 61215:2015 certified),Controller,Overhead protection, Dry run protection, Auto Restart facility, Float switch with water level sensors, software for start-up of motors, making necessary connections with supplying G.I.Controller box and supplying 32mm dia PVC column pipe 42m length including earthing etc.as per direction of the EIC. i.)Solar Panel Configuration:MNRE approved make 4 panels of 325 Wp (72 cell) each (solar Panel to be installed on top of M.S. Supporting structure); ii) Arrangement for interfacing of data for remote control monitoring through Departmental server and Web Portal. iii.)Submersible pump capacity 1.00 HP,14 Stage,32mm outlet dia (preferably oil filled)KSB/Crompton or renowned brand (MNRE approved ) and including Operation and maintenance of entire installations for 5 years (excep day to day operation) which includes: a) Cleaning of site, checking of valves and pipes, checking of electrical connections, cleaning solar panel etc. Twice in a month; b) Replacement of damaged Valves, Bib cocks and any other parts of all units as and when necessary; c) Repair/replacement of pumping machinery i/c controller, PV panel, wiring, switches etc. as and when necessary; d) Painting of M.S. structure and all painted surface at the end of each year. e)Auto cleaning of solar panel has to be executed every 24 hours interval by additional solar panel as required to run DC pump for cleaning f) Online remote monitoring of controller providing GSM/GPRS data pack including SIM as per technical specification of NIeT.
Making wire net fencing around the solar panel platform by supplying fitting fixing of galvanized Ms angle of approved quality which will be grouted on Earth by cemetn concrete as per drawing including an arrangment for a gate with lock and key facility which will have to be provided as per direction of EIC
Supplying and erecting in postion Mild Steel (as per IS 800, 808 and other relevent code) Supporting structure, M.S plate (3.55 mm thick) at top platform (2.1 mx2.1 m), including M.S. Ladder (Suitably placed), for supporting PVC Tanks (including supply of 5000 lit. capacity PVC/HDPE tank of approved quality with closed top with lid (Black) - Multilayer as shown in the drawing) and Solar Panel, all necessary pipeline connections with all PVC pipes from Tubewell to delivery, specials, valves all complete as per approved drawing and specification and direction of Engineer in charge.(minimum weight 1050 kg)
Making distribution system with 40mm ф uPVC. Make - Supreme / Oriplast / Longlast
Making distribution system with 32mm ф uPVC. Make - Supreme / Oriplast / Longlast
Making distribution system with 25mm ф uPVC. Make - Supreme / Oriplast / Longlast
Making distribution system with 15mm ф uPVC. Make - Supreme / Oriplast / Longlast
Supply, delivery, fitting and fixing of Special GI fabricated water chamber as per specification over and above the third plate of the hand pump as per drawing including all fitting materials as per direction of EIC
Construction of RCC street stand post with platform and 1.00 mtr. Masonary drain etc. with ordinary cement concrete M-15 Mix (4:2:1) with 20 mm down local hard stone (crusher broken) including plastering 20mm (6:1) with neat cemeting to platform & drain as per dept. type & drain as per dept. type drawing and design including tapping the distribution main, supplying, fitting fixing 15mm brass ferule with necessary saddle piece with 20mm dia G.I. Pipes of approved make with specials and nipple, bib cock, reducing socket etc. all complete as per direction of EIC
Construction of masonary drain attached to platform of RCC Street Stand post with 12.5 cm thick brick work in cement mortar (1:4) over a layer of single brick flat soiling with sand filling, 150mm thick with WCC(6:3:1) with picket pieces (30mm size) including excavation of earth 15mm thick cement plaster (4:1) with neat cement punning all complete chamfering the edges as per drawing and direction of E.I.C.
Supply delivery storage and instalaltion of PVC tank with food grade inside lining of capactiy 5KL
Making double earthing arrangeemnt for the above pumping machinery and other electrical accessoreis
Supply delivery of India Mark-II hand pump set.
P K ENGINEERING
SUJOY RANJAN BHOWMICK
MENAKA ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .