Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LQualified 5 7 703 CITY POINT BUIDLING NAVABHARATH CIRCLE KODIALBAIL MANGALORE CITY KARNATAKA 575003 | DAKSHINA KANNADA | KARNATAKA | 575003 | L1 | Qualified | |
| 2 | L2₹1.3 L+₹2,555.70 (1.99%)Qualified 40 1094 SPA PLAZA OPP TO SHARDHA TALKIES OTC ROAD SADAR PATRAPPA RD ULSOORPET BANGALORE BANGALORE KARNATAKA 560002 | BENGALURU URBAN | KARNATAKA | 560002 | L2 | Qualified | |
| 3 | L3₹1.3 L+₹4,020 (3.12%) GROUND FLOOR 59 1 SOUTH END MAIN ROAD NAGASANDRA CIRCLE BASAVANAGUDI BANGALORE KARNATAKA 560004 | BENGALURU URBAN | KARNATAKA | 560004 | L3 | - | |
| 4 | Qualified NO 33 SECOND FLOOR SAI LOTUS 60 FEET ROAD CHANASANDRA RAJARESHWARI NAGAR BANGALORE KARNATAKA 560004 | BENGALURU URBAN | KARNATAKA | 560004 | - | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
26 Jul 2025, 11:00 amClosed
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6456892 Dated : 16-07-2025 Bid Document 1/7
-- Number of days for which Bid would be auto -- extended 7 Past Performance 40 % Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 27 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : DGM INSTALLATION HPCL Bengaluru Terminal (Alok Kumar Chakraborti) Splitting 2/7
8093988
GEM/2025/B/6456892
Two Packet Bid
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
730 days
560067, Hindustan Petroleum Corporation Limited, Bengaluru Terminal, Near Devanagonthi Railway Station, Hoskote Taluk
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
40%
Exempted
16 Jul 2025
16 Jul 2025
26 Jul 2025
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6456892 Dated : 16-07-2025 Bid Document 1/7
-- Number of days for which Bid would be auto -- extended 7 Past Performance 40 % Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 27 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : DGM INSTALLATION HPCL Bengaluru Terminal (Alok Kumar Chakraborti) Splitting 2/7
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8093988.pdf
GEM_BID
77Atd_4bdc3057-de83-4613-98571752649512273_buyer171.hpcl.ka.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .