Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC 71 P NEW MODEL TOWN EXT HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹4.1 L | L1 | Accepted-AOC ok |
| 2 | L2₹4.3 L+₹23,355 (5.68%)Rejected-Finance HSVP OFFICE COMPLEX SECTOR 13 HISAR | HISAR | HISAR | HARYANA | ₹4.3 L+₹23,355 (5.68%) | L2 | Rejected-Finance ok |
| Sl No | Description | Qty | Unit | The Hisar Balaji Coop. L and C Society Ltd., Hisar L1 | Sanjeet Kumar Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Hiring of Tractor with burma including cost of services of operating staff, lubricating oil, diesel/Petrol, other consumables for running the Tractor with burma set complete in all respect for sucking and disposal of rain water accumulated due to heavy rainfall complete in all respect including cost of material, labor, carriage, loading-unloading, excluding GST, other charges etc. as per the satisfaction of Engineer-in-charge.. | 865 | Per Hours | 475 ₹4,10,875 Lowest | 502 ₹4,34,230 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
8 Jun 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
ANNUAL MTC. ESTIMATE OF INTERNAL SEWERAGE SCHEME FOR SECTOR-1,4,3,5,13P,15,16-17, UE-II, 27-28, PLA, MGA and ODC HISAR (2026-27)
2026_HBC_525848_1
2026BF8EC7FB F02E 438C AB61 306F39B60918259HSV
Open Tender
Civil Works
Works
180 days
Hisar
Hiring of tractor with burma for the sucking and disposal of sewerage / rainwater during upcoming rainy season in Sector-Urban Estate-II, Hisar and all other works contingent thereto
2 documents required · 2 mandatory
₹500
Yes
₹10,000
Yes
25 Aug 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring of Tractor with burma including cost of services of operating staff, lubricating oil, diesel/Petrol, other consumables for running the Tractor with burma set complete in all respect for sucking and disposal of rain water accumulated due to heavy rainfall complete in all respect including cost of material, labor, carriage, loading-unloading, excluding GST, other charges etc. as per the satisfaction of Engineer-in-charge.. | 865 | Per Hours | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_604818.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .