Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹13.9 L+₹2.2 L (19.2%)Rejected-AOC 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | 2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical NO 1 3RD FLOOR HAMEEDIA COMPLEX 108 TRIPLICANE HIGH ROAD TRIPLICANE CHENNAI 600 005 | CHENNAI | CHENNAI | TAMIL NADU | 600005 | - | Rejected-Technical The tenderer withdrawn the offer. Hence the offer is Not considered for further evaluation. |
| Sl No | Description | Qty | Unit | SMU ENTERPRISES L1 | GAYATHRI ENGINEERING ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Removal of double layer lagging, plastering and cladding over the HP Heaters 5,6 & 7 and allied pipe lines and valves | 138 | m² | 1,03,500 ₹1,22,130 Lowest | 1,22,820 ₹1,44,927.6 |
| 2.00 | Re-insulation of double layer lagging, plastering and cladding over the HP Heaters 5,6 & 7 and allied pipe lines and valves | 138 | m² | 2,20,800 ₹2,60,544 Lowest | 2,48,400 ₹2,93,112 |
| 3.00 | Charges for disposal, cleaning and transportation of waste insulation material from work spot to ear marked area to dump | 2 | Nos | 11,000 ₹12,980 Lowest | 13,000 ₹15,340 |
| 4.00 | Charges for providing necessary scaffolding arrangement for dismantling and erection of wornout insulation around the HP Heaters 5, 6, & 7 at "0" mtr to 13.5mtr level elevation from the ground and removing after completion of work. (Each heaters 4 Qty) | 8 | Nos | 1,00,000 ₹1,18,000 Lowest | 1,20,000 ₹1,41,600 |
| 5.00 | Contractor Scope of Material:
Ceramic Blanket Size 3.81 x 0.61 x 50mm @ 100mm Thickness (Total lagging area for HP Heaters = 138 m²) For double layer lagging = 138 x 2 = 276 m² | 276 | M² | 4,00,200 ₹4,72,236 Lowest | 4,96,800 ₹5,86,224 |
| 6.00 | CAT-9 Self Setting cement Cement required for 1m²@ 8mm thickness = 20kgs. Total plastering area for HP Heater =164.26m² Therefore cement required for 164.26m² @ 8mm
= 164.26 x 20 =3285.2 Kg | 3,285.2 | Kg | 2,23,393.6 ₹2,63,604.45 Lowest | 2,62,816 ₹3,10,122.88 |
| 7.00 | Aluminium sheet 24 SWG (0.56MM) Thickness of 1Mtr width roll. (Weight for 1m² sheet = 1.51 Kg)(As per Aluminium Weight chart) Area required for cladding over the HP Heaters =164.26m²
Therefore weight for 164.26 m² = 164.26 x 1.51 = 248.03 Kgs | 248.03 | Kg | 1,04,172.6 ₹1,22,923.67 Lowest | 1,22,774.85 ₹1,44,874.32 |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
9 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004
TTPS Mech II TM I Unit I Removal and Re insulation over the HP Heaters 5 6 7 and allied pipe lines and valves including supply of insulation materials
2026_EB_717110_1
CE/TTPS/SE/M-II/ No.202/2026-27
Open Tender
Miscellaneous Works
Item Rate
10 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹7,600
Yes
28 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
9 Nov 2026
23 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of double layer lagging, plastering and cladding over the HP Heaters 5,6 & 7 and allied pipe lines and valves | 138 | m² | 55 | ₹7,590 |
| 2 | Re-insulation of double layer lagging, plastering and cladding over the HP Heaters 5,6 & 7 and allied pipe lines and valves | 138 | m² | 55 | ₹7,590 |
| 3 | Charges for disposal, cleaning and transportation of waste insulation material from work spot to ear marked area to dump | 2 | Nos | 55 | ₹110 |
| 4 | Charges for providing necessary scaffolding arrangement for dismantling and erection of wornout insulation around the HP Heaters 5, 6, & 7 at "0" mtr to 13.5mtr level elevation from the ground and removing after completion of work. (Each heaters 4 Qty) | 8 | Nos | 55 | ₹440 |
| 5 | Contractor Scope of Material:
Ceramic Blanket Size 3.81 x 0.61 x 50mm @ 100mm Thickness (Total lagging area for HP Heaters = 138 m²) For double layer lagging = 138 x 2 = 276 m² | 276 | M² | 55 | ₹15,180 |
| 6 | CAT-9 Self Setting cement Cement required for 1m²@ 8mm thickness = 20kgs. Total plastering area for HP Heater =164.26m² Therefore cement required for 164.26m² @ 8mm
= 164.26 x 20 =3285.2 Kg | 3,285.2 | Kg | 55 | ₹1,80,686 |
| 7 | Aluminium sheet 24 SWG (0.56MM) Thickness of 1Mtr width roll. (Weight for 1m² sheet = 1.51 Kg)(As per Aluminium Weight chart) Area required for cladding over the HP Heaters =164.26m²
Therefore weight for 164.26 m² = 164.26 x 1.51 = 248.03 Kgs | 248.03 | Kg | 55 | ₹13,641.65 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_861360.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .