Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹49.2 L+₹4.0 L (8.85%)Admitted-Finance 122 SAMHARIYA ASOPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | L2 | Admitted-Finance | ||
| 3 | L3₹49.4 L+₹4.2 L (9.36%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
9 Jun 2026, 6:00 pmClosed
CEO Zila Parishad Bikaner
Zila Parishad Bikaner
Gramin Vikas hetu Rajivika market vikas kendra bikaner
2026_PRD_560885_1
26
Open Tender
Miscellaneous Works
Percentage
90 days
As per document
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Zila Parishad Bikaner,MD RISL Jaipur
₹1 L
Yes
19 Jun 2026
20 May 2026
10 Jun 2026
20 May 2026
9 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in foundationexcavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. | - | Cum | 178.46 | - |
| 1.02 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix | - | Cum | 3,615.96 | - |
| 1.03 | Brick work in foundation and plinth using bricks of class designation-Ist in CM 1:6 | - | Cum | 4,338.97 | - |
| 1.04 | DPC with RCC IN 1:1.5:3 MIX | - | Cum | 5,594.85 | - |
| 1.05 | Brick work in super structue using bricks of class designation-Ist in CM 1:6 | - | Cum | 4,587.58 | - |
| 1.06 | Reinforced cement concrete work including curing compection ,finishing with rendering in cement sand morter 1:3 and making good and joints excluding cost of centering ,shuttring and reinforcement in 1:1.5:3… | - | Cum | 5,810.63 | - |
| 1.07 | Providing and Fabricating reinforcement for RCC work including cutting,bending, placing in position and binding .. | - | Kg | 97.94 | - |
| 1.08 | Centering and Shuttring with plywood or steel sheets including strutting , propping, bracing both ways with wooden members and removal of from work | - | Sqm | 319.04 | - |
| 1.09 | cememt conc on roof in 1:3:6mix | - | Cum | 3,899.51 | - |
| 2 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 | - | Sqm | 176.55 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 6.35 MB
BOQ_998286.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .