Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 CrRejected-Finance | ₹1.4 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 CrRejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹1.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.4 CrRejected-Finance | ₹1.4 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAJESH TRADERS L5 | M/S DHRUWA KUMAR SINGH L3 | VINAY KUMAR SINGH L2 | NIKHIL CONSTRUCTION L4 | M/S PAWAN KUMAR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 15,608.3 | M3 | 160 ₹24,97,328 | 180 ₹28,09,494 | 136 ₹21,22,728.8 | 152 ₹23,72,461.6 | 170 ₹26,53,411 |
| 2.00 | Dismantling of old stone masonry with cement mortar and its disposal within 60m including all labour ,T&P etc. as per direction of Engineer-in-charge. | 32.04 | M3 | 330 ₹10,573.2 | 351 ₹11,246.04 | 320 ₹10,252.8 | 350 ₹11,214 | 330 ₹10,573.2 |
| 3.00 | Dismantling of cement base concrete including stacking of dismantled materials within 60m as per direction of Engineer –in-charge. | 19.42 | M3 | 330 ₹6,408.6 | 390 ₹7,573.8 | 380 ₹7,379.6 | 400 ₹7,768 | 350 ₹6,797 |
| 4.00 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. | 2,638.85 | M3 | 72 ₹1,89,997.2 | 87 ₹2,29,579.95 | 82 ₹2,16,385.7 | 72 ₹1,89,997.2 | 75 ₹1,97,913.75 |
| 5.00 | Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work. | 4,256 | M2 | 20 ₹85,120 | 30 ₹1,27,680 | 31 ₹1,31,936 | 20 ₹85,120 | 28 ₹1,19,168 |
| 6.00 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 905.6 | M3 | 4,100 ₹37,12,960 | 3,851 ₹34,87,465.6 | 3,800 ₹34,41,280 | 4,500 ₹40,75,200 | 3,500 ₹31,69,600 |
| 7.00 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. | 1,375.1 | M3 | 4,300 ₹59,12,930 | 4,148 ₹57,03,914.8 | 4,350 ₹59,81,685 | 4,500 ₹61,87,950 | 3,800 ₹52,25,380 |
| 8.00 | Supplying and laying Dala Stone Grit 10-20mm. for inverted filter including all type of materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 3.42 | M3 | 3,200 ₹10,944 | 2,980 ₹10,191.6 | 3,500 ₹11,970 | 3,000 ₹10,260 | 2,700 ₹9,234 |
| 9.00 | Supplying and laying Shankargarh Stone Balast 20-40mm.for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 3.42 | M3 | 1,210 ₹4,138.2 | 1,168 ₹3,994.56 | 1,400 ₹4,788 | 1,000 ₹3,420 | 1,000 ₹3,420 |
| 10.00 | Supplying and laying coarse sand FM>2 for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 7.98 | M3 | 1,705 ₹13,605.9 | 2,084 ₹16,630.32 | 2,400 ₹19,152 | 1,500 ₹11,970 | 1,850 ₹14,763 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration and Pucca work of Itwa dy. from km 0.000 to km 4.100.
2026_UPIDC_1113784_3
05/SE/2025-26
Open Tender
Civil Works
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.6 L
24 Mar 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Dismantling of old stone masonry with cement mortar and its disposal within 60m including all labour ,T&P etc. as per direction of Engineer-in-charge.
Dismantling of cement base concrete including stacking of dismantled materials within 60m as per direction of Engineer –in-charge.
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge.
Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work.
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge.
Supplying and laying Dala Stone Grit 10-20mm. for inverted filter including all type of materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying Shankargarh Stone Balast 20-40mm.for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying coarse sand FM>2 for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of precast C.C. work with all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:2:4)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer in charge.
Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
Providing and Fixing of Steel Gate including cost of all materials labourT&P etc.
Providing and Fixing of boundary pillar along the canal every 200m interval including cost of all materia, labour and T&P etc. as per direction of Engineer in charge.
Laying precast C.C. block (450x450x225mm.) in D/S Canal Section including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
S/F 75 mm.dia PVC Pipe in weep hole in retaining wall and crest including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
DOC_Belan.pdf
Tender Documents • 2.59 MB
BOQ_2063924.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid