Tender Value
₹3.1 Cr
EMD Value
₹6.3 L
Closing Date
14 Oct 2026, 5:00 pm
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Rcc slab Covering of drain Different Places along Pocket-5A,1A,1B,5B and Pocket 5C in Sector-18 YEA WC-1
2026_YEIDA_1191731_4
YEA/GM(PROJECT)/2026/583 DT-28/09/2026
Open Tender
Civil Works
Fixed-rate
270 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents
5 documents required · 5 mandatory
₹4,900
₹6.3 L
1 Oct 2026
1 Oct 2026
16 Oct 2026
1 Oct 2026
14 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note:- Cement content considered in this item is @ 330kg/cum. Excess/less cement used as per design mix is payable/recoverable All work up to Plinth level. Based on UPPWD SOR-2020/5.33.1 | 1,472.58 | Cum | 7,849.65 | ₹1,15,59,237.6 |
| 2 | Centring and shuttering including strutting, Proping and removal of form for, wall (any thickness) including attached pillaster, butresses, Based on UPPWD/SOR-2020//5.9.6 | 1,974.05 | Sqm | 335.55 | ₹6,62,392.48 |
| 3 | Centring and shuttering including strutting, Proping and removal of form for, Edges of slab and breaks in floor and wallsUPPWD SOR-2020 | 11,031 | Rmt. | 127.4 | ₹14,05,349.4 |
| 4 | Centring and shuttering including strutting, Proping and removal of form for, Suspended floors, Roofs, Landing, balcony and excess platform complete Based on UP PWDSOR-2020 | 6,830.57 | Sqm | 399.7 | ₹27,30,178.83 |
| 5 | Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars UPPWD/SOR-2020/5.22.6 | 1,93,704.64 | Kg | 77.08 | ₹1,49,30,753.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
4.pdf
Tender Documents • 2.80 MB
BOQ_2248542.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .