| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 LAdmitted-Finance | ₹5.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Palak Electricals L1 | Ms Jhandel Singh Sisodia L2 |
|---|---|---|---|---|---|
| 1.01 | Regular Operation and Maintenance of Street Light Fixtures in entire Industrial Area including supply and replacing the required material and labour complete as per the following terms and conditions - (1) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, failing which two times of the maintenance charges payable for each fixture for the month shall be penalized and recovered from the contractor. (2) Contractor shall arrange at his cost for put on and off the street light fixture at appropriate time regularly as per instructions of Engineer in charge. A register shall be maintained at RIICO association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO Association office daily and comply the instructions and attend complaints regularly. (3) Contractor will have to employ trained and qualified electricians for the work. (4) Corporation shall not be responsible for any kind of accident during execution of work. (5) Contractor will be responsible for safety and security of fixtures and all concerned materials. (6) Contractor will be responsible for arrangement of all T and P required for the work (7) Cost of all labour and material like tube, rod, starter, ballast, wire will be born by contractor. All material required for the work shall equivalent to same standards as provided at start of work and in no case below the category II of concerned BSR item. (8) Contractor has to repair and maintenance tube light fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. (9) No extra payment will be made for fixing or removal of extra or existing fixture in the industrial area. (10) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill of the contractor. Payment of electricity bill will be made by RIICO. (11) Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintained the On and Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. (12) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. (13) Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair or replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. LED Fixture ( 40,80,120 Watt ) I/A Growth Center | 7,440 | Per Point Per month | 60 ₹4.5 L | 63.75 ₹4.7 L |
| 1.02 | Regular operation and maintenance of Street Light Fixtures in entire Ind. Area including Supply and replacing the required material and labour etc. complete. as per the following terms and conditions -(1) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, failing which two times of the maintenance charges payable for each fixture for the month shall be penalized and recovered from the contractor.(2) Contractor shall arrange at his cost for put on and off the street light fixture at appropriate time regularly as per instructions of Engineer in charge. A register shall be maintained at RIICO association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO Association office daily and comply the instructions and attend complaints regularly.(3) Contractor will have to employ trained and qualified electricians for the work.(4) Corporation shall not be responsible for any kind of accident during execution of work.(5) Contractor will be responsible for safety and security of fixtures and all concerned materials.(6) Contractor will be responsible for arrangement of all T and P required for the work(7) Cost of all labour and material like tube, rod, starter, ballast, wire will be born by contractor. All material required for the work shall equivalent to same standards as provided at start of work and in no case below the category II of concerned BSR item. (8) Contractor has to repair and maintenance tube light fixture with material in all cases like short circuit, phase to phase of JVVNL line etc.(9) No extra payment will be made for fixing or removal of extra or existing fixture in the industrial area.(10) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill of the contractor. Payment of electricity bill will be made by RIICO.(11) Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintained the On and Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment.(12) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor.(13) Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair or replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material.(14) Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100 per fixture per day will be imposed on the contractor.High mast light ( 12 LED lights of 150 W in Each ) - 2 Nos.Housing Colony | 24 | Per Highmast Per month | 2,075 ₹49,800 | 2,050 ₹49,200 |
Tender Value
₹6.9 L
EMD Value
₹13,848
Closing Date
27 Jan 2026, 6:00 pmClosed
Regional Manager
Office of the Regional Manager , RIICO , Jhalawar
Regular operation and maintenance of street lights with material for 1 year at Ind. Area Growth Centre, Jhalawar
2026_RIICO_527959_1
NIT No. 17/2025-26/3352-3354 dt 13.012026
Open Tender
Electrical Works
365 days
Ind. Area Growth Centre Jhalawar
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
RIICO Ltd Jhalawar
₹13,848
4 Feb 2026
17 Jan 2026
28 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
Regular Operation and Maintenance of Street Light Fixtures in entire Industrial Area including supply and replacing the required material and labour complete as per the following terms and conditions - (1) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, failing which two times of the maintenance charges payable for each fixture for the month shall be penalized and recovered from the contractor. (2) Contractor shall arrange at his cost for put on and off the street light fixture at appropriate time regularly as per instructions of Engineer in charge. A register shall be maintained at RIICO association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO Association office daily and comply the instructions and attend complaints regularly. (3) Contractor will have to employ trained and qualified electricians for the work. (4) Corporation shall not be responsible for any kind of accident during execution of work. (5) Contractor will be responsible for safety and security of fixtures and all concerned materials. (6) Contractor will be responsible for arrangement of all T and P required for the work (7) Cost of all labour and material like tube, rod, starter, ballast, wire will be born by contractor. All material required for the work shall equivalent to same standards as provided at start of work and in no case below the category II of concerned BSR item. (8) Contractor has to repair and maintenance tube light fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. (9) No extra payment will be made for fixing or removal of extra or existing fixture in the industrial area. (10) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill of the contractor. Payment of electricity bill will be made by RIICO. (11) Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintained the On and Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. (12) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. (13) Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair or replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. LED Fixture ( 40,80,120 Watt ) I/A Growth Center
Regular operation and maintenance of Street Light Fixtures in entire Ind. Area including Supply and replacing the required material and labour etc. complete. as per the following terms and conditions -(1) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, failing which two times of the maintenance charges payable for each fixture for the month shall be penalized and recovered from the contractor.(2) Contractor shall arrange at his cost for put on and off the street light fixture at appropriate time regularly as per instructions of Engineer in charge. A register shall be maintained at RIICO association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO Association office daily and comply the instructions and attend complaints regularly.(3) Contractor will have to employ trained and qualified electricians for the work.(4) Corporation shall not be responsible for any kind of accident during execution of work.(5) Contractor will be responsible for safety and security of fixtures and all concerned materials.(6) Contractor will be responsible for arrangement of all T and P required for the work(7) Cost of all labour and material like tube, rod, starter, ballast, wire will be born by contractor. All material required for the work shall equivalent to same standards as provided at start of work and in no case below the category II of concerned BSR item. (8) Contractor has to repair and maintenance tube light fixture with material in all cases like short circuit, phase to phase of JVVNL line etc.(9) No extra payment will be made for fixing or removal of extra or existing fixture in the industrial area.(10) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill of the contractor. Payment of electricity bill will be made by RIICO.(11) Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintained the On and Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment.(12) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor.(13) Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair or replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material.(14) Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100 per fixture per day will be imposed on the contractor.High mast light ( 12 LED lights of 150 W in Each ) - 2 Nos.Housing Colony
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
StreetlightTDwithconditions.pdf
Tender Documents • 0.99 MB
BOQ_942110.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid