Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.0 CrAccepted-AOC SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | 1 | Accepted-AOC Accepted | |
| 2 | 2₹28.4 Cr+₹1.3 Cr (4.90%)Rejected-Finance P AND C TOWERS 2ND FLOOR 140 PERUNDURAI ROAD ERODE 638 011 | ERODE | ERODE | TAMIL NADU | 638011 | 2 | Rejected-Finance L1 Lowest Tenderer can only be accepted. L2 is Rejected | |
| 3 | 3₹28.9 Cr+₹1.9 Cr (7.01%)Rejected-Finance PASUR ERODE | PASUR | ERODE | TAMIL NADU | 3 | Rejected-Finance L1 Lowest Tenderer can only be accepted. L3 is Rejected |
Tender Value
₹26.5 Cr
EMD Value
₹13.4 L
Closing Date
30 Sept 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer H C and M
The Superintending Engineer Highways Department Construction Maintenance 214 Tindivanam Road Tiruvannamalai 606 601
Widening from Two Lane to Four Lane and Strengthening at km 97/0 - 100/0 and only Widening from Two Lane to Four Lane at Km 101/0 - 103/0, 106/2 - 106/4 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road including CD works -TVM-92
2025_HWAY_599078_1
TN No 31 2025 26 HDO Dt 19 08 2025 TVM 92
Open Tender
Civil Works - Highways
Percentage
360 days
Tirupathur
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹13.4 L
Yes
Tiruvannamalai
20 Jan 2026
30 Aug 2025
30 Sept 2025
30 Aug 2025
30 Sept 2025
10 Sept 2025
4 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. (21774+1743+1743+348.60+522.90+36.31+547.18+795.33) | - | Cubic Metre | 131.89 | - |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401. For Grading-V Material (Filter/ Separation Layer at Bottom) (5309+159.55+307.47) | - | Cubic Metre | 2,130.16 | - |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401. For Grading-III Material (Drainage Layer at Top) (3933+118.18+32.20) | - | Cubic Metre | 2,403.19 | - |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (9831+295.46+410.58) | - | Cubic Metre | 2,600.83 | - |
| 5 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 (39324+1181.84+1642) | - | Square Metre | 86.68 | - |
| 6 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 (39324+1181.84+1642) | - | Square Metre | 20.06 | - |
| 7 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (17801+1540+900) | - | Square Metre | 28.9 | - |
| 8 | Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20mm, 0.35 cum of 13.20-2.36mm and 0.36 cum of 2.36mm & below size IRC metal with 71.30 kgs of VG-40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5 Grading-I | 118.18 | Cubic Metre | 10,558.89 | ₹12,47,849.62 |
| 9 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs. of VG-40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grading-V (4823+32.20+77.00) | - | Cubic Metre | 11,418.38 | - |
| 10 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grade-II. | 111.04 | Cubic Metre | 9,470.26 | ₹10,51,577.67 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Vol1in92.pdf
Tender Documents • 0.79 MB
BOQ_716074.xls
BOQ • 0.38 MB
Vol2in92.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .