| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance | -19.11% | ₹6.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 LAdmitted-Finance | -17.99% | ₹6.8 L | L2 | Admitted-Finance |
| 3 | L3₹7.0 LAdmitted-Finance | -14.99% | ₹7.0 L | L3 | Admitted-Finance |
| 4 | L4₹7.4 LAdmitted-Finance | -11.21% | ₹7.4 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹8.3 L
EMD Value
₹16,560
Closing Date
23 Feb 2026, 1:00 pmClosed
Executive Officer, Nagar Palika, Phagi
Executive Officer, Nagar Palika, Phagi
Construction of Chabutara and Tin Shade at Rampura Railway Shamshan in Municipal Area Phagi
2026_DLB_537217_14
NIT 5566 DATED 09/02/2026 NAGAR PALIKA PHAGI
Open Tender
Civil Works
60 days
Phagi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
E.O., Nagar Palika, Phagi / MD RISL Jaipur
₹16,560
Yes
6 Mar 2026
11 Feb 2026
25 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m chabutara 10x8 step
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).chabutara 10x8 floor
Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) first footing Second footing third footing
Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . 75mm thick.
Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 (1 cement : 4 fine/ coarse sand)
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.63 mm thick with zinc coating not less than 275gm/m²
Random rubble dry stone Kharanja (soling) under floor
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
Tendernotice_2.pdf
PDF • 1.45 MB
BOQ_957392.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid