| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | ₹5.2 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹5.6 L+₹38,947 (7.50%)Rejected-Finance AT PO SORANA PO TANGI DIST KHORDHA | ₹5.6 L+₹38,947 (7.50%) | L2 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 3 | L3₹5.8 L+₹63,924 (12.3%)Rejected-Finance AT RATANPURPATANA PO TANGI DIST KHORDHA | KHORDHA | ODISHA | 751001 | ₹5.8 L+₹63,924 (12.3%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
Tender Value
₹8.5 L
EMD Value
₹8,467
Closing Date
7 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
Repair to HL bridge over over Baunsanallah on PWD road -Mangalajodi to Tarimi- _Road_ Protection wall -both side-0.000 to 0.100
2026_CERWI_134023_1
Tender online- 08/2026-27 of BBSR
Open Tender
Civil Works - Roads
Percentage
60 days
Khordha
2 documents required · 2 mandatory
₹4,000
₹8,467
Yes
21 Sept 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
1 Jul 2026 - 7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed E.I.C. | 85.33 | Cum | 282.89 | ₹24,139 |
| 2 | Filling in foundation and plinth with sand watered and rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete | 14.22 | Cum | 1,355.61 | ₹19,276.77 |
| 3 | Providing Rainforced Cement Concrete of (M15) with 20mm to 40mm size stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. | 18.44 | Cum | 5,567.71 | ₹1,02,668.57 |
| 4 | Providing Plain/Reinforced Cement Concrete of (1:2.5:5) with 20mm to 40mm size stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials t | 95.57 | Cum | 5,627.48 | ₹5,37,818.26 |
| 5 | Providing weep holes in Brick masonary / Plain / Reinforced concrete abutment, wing wall / returning wall with 100mm dia AC pipe, extending through the full width of the structure with slope of IV : 20H towards drawing foce, complete as per the direction | 37.5 | Rmt | 188.52 | ₹7,069.5 |
| 6 | Costruction of embankment with approved material obtained from borrow pits with all leads & lifts transporting to site by mechanical means with a leads of 5 km spreading grading to required slope & compacting to meet requirement etc complete. | 250.31 | Cum | 146.36 | ₹36,635.37 |
| 7 | Providing Cement Concrete (1:2:4) with 12mm stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. | 16.88 | Cum | 7,053.91 | ₹1,19,070 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.50 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_599157.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .