Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹27.5 L+₹1.0 L (3.87%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹30.3 L+₹3.9 L (14.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹30.8 L+₹4.4 L (16.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹32.1 L+₹5.6 L (21.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹51.7 L
EMD Value
₹1.0 L
Closing Date
1 Jun 2026, 6:00 pmClosed
Er. Sandeep Gupta
XEN
Beautification and overall upgradation of the corridor and white washing and repair of college boundary wall and college lawn at SPMR College of Commerce
2026_PWDJK_310786_1
eNIT NO 15 of 2026-27 Dated 23-05-2026
Open Tender
Civil Works
Percentage
60 days
Jammu
BOQ
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD R and B Division
₹1.0 L
5 Jun 2026
23 May 2026
2 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead. With cement mortar 1:4 (1 cement : 4 fine sand) | 1,311.28 | Sqm | 441.4 | ₹5,78,798.99 |
| 2 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 829.83 | Sqm | 18.7 | ₹15,517.82 |
| 3 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 1 mm thick | 2,802.1 | Sqm | 138.1 | ₹3,86,970.01 |
| 4 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ liter, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats | 632.1 | Sqm | 109.9 | ₹69,467.79 |
| 5 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) | 2,134 | Sqm | 185.2 | ₹3,95,216.8 |
| 6 | Taking out doors, windows and clerestory window shutters (steel or wood)including stacking within 50 meters lead | - | - | - | - |
| 7 | :Of area beyond 3 sqm. | 1 | No | 145.75 | ₹145.75 |
| 8 | Of area of 3 sqm. and below | 11 | NO | 110.05 | ₹1,210.55 |
| 9 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge. | 12 | NO | 313.2 | ₹3,758.4 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Sal | 0.16 | Cum | 1,42,085.65 | ₹23,088.92 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1005232.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .