Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
5 Mar 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR NISER
NISER
Consultancy work for obtaining statutory Clearances from statutory authorities Fire authorities BDA as applicable for proposed LCS building at NISER JATNI 752050
2026_NISER_899341_1
NISER/SCoS/LCS/25-26/01/54
Open Tender
Civil Works - Others
Works
730 days
NISER Jatni
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
17 Jun 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
19 Feb 2026 - 23 Feb 2026
Obtaining statutory Clearances from concerned statutory authorities / BDA/ fire authority etc. including obtaining all prerequisite statutory clearances, from start to end. (i.e. from obtaining plan approvals, Commencement certificate, upto Obtaining Occupancy Certificate including all intermittent supporting clearances, if any) for the Construction of LCS building in the existing NISER campus. , complete, all as per requirement and instruction of Engineer-in-Charge(for built up area of 1500 sq.m approx.). a) Preparation of Architectural drawings including master plan, area statement etc. as per the requirement of Statutory authority i.e. BDA etc. based on preliminary drawings prepared by the Department. b) Getting structural drawings, design, analysis vetted by IIT or Govt. Institution as approved by the Statutory authority including submission of drawings/ any other details required by the statutory authority c) Preparation of drawings, design etc. for fire safety and any other services required for getting statutory approval. d) Periodic follow up with statutory authority including preparation and presentation to the building committee e) Getting all the approval and certificate from the Statutory authority from commencement to occupancy.The scope of the work includes:- Stage 1 : Obtaining all required statutory clearances for commencement of the work, up to and including issuance of the Commencement Certificate (CC).Stage 2 : Obtaining requirement of all the statutory clearances required for completion certificate and Occupation Certificate (OC) and submission for OC, including intermittent clearances, if any, required during execution of work.Stage 3 : Obtaining the Completion Certificate and Occupancy Certificate (OC) from the competent statutory authority.Payment schedule shall be as follows :After successful completion of stage 1 : 50% ,After successful completion of stage 2 : 20%,After successful completion of stage 3 : 30% Notes:-1) The work shall be carried out and necessaryclearances obtained, strictly in accordance withrequirements and other notifications publishedby the Statutory authorities from time to time.The quoted cost shall be inclusive of GST.All statutory fees payable to statutory authorities shall be borne by the Department.The consultancy fee shall remain unchanged for variation in built-up area up to ±10%. Charges beyond this area, if required, shall be paid on Pro-Rata Basis.Completion of each stage shall be certified by the Engineer-in-Charge.
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
NIT.pdf
Additional Documents • 0.47 MB
BOQ_945302.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .