Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹13.1 L
Closing Date
18 Aug 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tata Power Delhi Distribution Limited
RC for SITC of Control Relay Panel
200001982
TPDDL/ENGG/ENQ/200001982/26-27
Delhi
a) The bidder should have average annual turnover of minimum of Rs. 5.00 crores in last 3 financial years. Copy of audited P&L Account to be submitted in this regard.
b) The bidder/OEM should have executed at least 100 Nos Control & Relay Panels of 33kV or higher voltage rating panels during last five years. Copy of work order / completion certificate to be submitted in this regard.
c) The bidder/OEM should have performance certificates for similar works for 2 years satisfactory performance from at least 2 reputed companies for similar or higher rating. The work against these issued certificates should be completed in last seven years from the date of bid submission. In case the bidder has a previous association with Tata Power DDL for similar products and services, the performance feedback for that bidder by Tata Power DDL’s User Group shall only be considered irrespective of performance certificates issued by any third organization.
d) Bidder/OEM should have the In-house testing facilities for acceptance test as per TPDDL specifications. Bidder must submit undertaking in this regard.
e) Bidder must have all Statutory Compliance like Valid PAN, ESI registration, EPF registration & GSTN Registration.
f) The bidder should have Valid Electrical Contractor License issued by Govt of NCT of Delhi to execute the electrical works in Delhi. Bidder must submit the copy of license in this regard. In case bidder is not having this License, Bidder shall submit an undertaking that in case they are the successful bidder, same shall be obtained by them before execution of contract by TPDDL.1.8 Marketing Integrity We have a fair and competitive marketplace. The rules for bidders are outlined in the General Condition of Contracts. Bidders must agree to these rules prior to participating. In addition to other remedies available, TATA POWER-DDL reserves the right to exclude a bidder from participating in future markets due to the bidder’s violation of any of the rules or obligations c…
₹5,000
₹13.1 L
28 Jul 2026
28 Jul 2026
PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2
Bawana-6 Grid Scope Bhalswa-2 Grid Scope
PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-1006 Conventional BCPU-01Nos Conventional TDR-01Nos Process bus BCPU-01Nos Process bus TDR-01Nos Process bus TMU-01Nos LIU (Light interface Unit)-02Nos Process Bus Ethernet Switches-02Nos Station bus Ethernet Switches-02Nos Other IED's and contacts shall be as per specification. Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-1006 Conventional BCPU-01Nos Conventional TDR-01Nos Process bus BCPU-01Nos Process bus TDR-01Nos Process bus TMU-01Nos LIU (Light interface Unit)-02Nos Process Bus Ethernet Switches-02Nos Station bus Ethernet Switches-02Nos Other IED's and contacts shall be as per specification.
PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-1006 Merging unit-4Nos(HV-2,LV-2) 12port LIU--2Nos Other IED's and contacts shall be as per specification. Panel Merging unit for PTR Bay GIS Substation with 100% redundancy.This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs Merging unit-4Nos(HV-2,LV-2) 12port LIU--2Nos Other IED's and contacts shall be as per specification.
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
S. NO. Material Code Item Descr. UOM Quantity "A" Unit Rate (Rs.) "a" Applicable GST (in Rs.) "b" Price per Unit (in Rs.) "B"= a+b TPDDL Amt (in Rs.) C=A*B HSN/ SAC code
1 Part-A: Supply Part
1.01 101001109 PANEL C&R 66KV TX BAY 220V DC SCADA COMP -GIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006-01, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. Panel width shall be less than 800 mm. ##This item is for GIS Grid EA 10 0 0 0
1.02 301002402 PANEL C&R 66KV TX BAY 220V DC SCADA COMP-AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG- EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. ##This item is for AIS Grid EA 5 0 0 0
1.03 301002403 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-AIS Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control,metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 ##This item is for AIS Grid EA 3 0 0 0
1.04 101000273 C&R BUS COUPLER 66KV (SCADA COMPATIBLE)- AIS Supply of 66kV Bus Coupler CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of : 66kV Bus Coupler panel = 1 No. Note: The control, metering <(>&<)> protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation/SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames.Scope of CRP panels of 66 KV and 11 KV Switchgear and C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 · The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; · The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH <(>&<)> Elster A1621/Secure Premium300 · All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 · All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1 0 0 0
1.05 101000275 BUS BAR DIFFERENTIAL PROTECTION PANEL- AIS Supply of 66kV busbar protection CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of Bus Bar Protection with CT Swtching Scheme and provision of bypassing the protection as well. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005.Panels to be installed on base frames.Scope of CRP panels of 66KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: # The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 # The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; # The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH & Elster A1621/Secure Premium300 # All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 # All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1 0 0 0
1.06 101001150 PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1 0 0 0
1.07 101001152 PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-106 EA 1 0 0 0
1.08 101001149 Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300. ##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1 0 0 0
1.09 101001151 Panel Merging unit for PTR Bay GIS Substation with 100% redundancy. This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs EA 1 0 0 0
1.1 101000324 LINE DIFFERENTIAL RELAY 220 V EA 3 0 0 0
1.11 301002405 PANEL C&R 33KV TX BAY 50VDC SCADA COMPT Supply of 33kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per specification and data sheet comprising of : Transformer panel. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications ENG-EHV-1005 & ENG-EHV-1006 & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: · The 33 kV transformer feeder of the station: Both Satec + Premier 300. This item also includes following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, Tr. Diff. Relay and TMU of PTR-3 C&R Panel(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable(v) The 33 kV transformer feeder of the station: Both Satec + Premier 300. shall be used for metering purpose.(vi) Integration & Testing of new IEDs with existing RTU (vii) Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(viii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs(x) Communication Cables and Splitter for the integration of Elster make Energy Meters with existing system. EA 1 0 0 0
1.12 301002404 PANEL C&R 33KV LINE FDR 50VDC SCADA COMP Supply of 33kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per TPDDL specifications ENG-EHV-1005 & ENG-EHV-1006 and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .Control and relay panel board with LDR and compatible with SCADA to be provided.All the relays/IED communications shall be on IEC 61850 protocol.Panels to be installed on base frames.Scope includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 33 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm.with required accessories as per TPDDL specifications. The scope of this item also includes the following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, LDR(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable.(v) Integration & Testing of new IEDs with existing RTU(vi)Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(vii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs EA 1 0 0 0
1.13 101000325 LINE DIFFERENTIAL RELAY 50 V EA 1 0 0 0
1.14 101001113 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-GIS Panel Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm. ##This item is for GIS Grid EA 1 0 0 0
1A Sub Total Part-A 0
2 Part-B: Service Part
2.01 Installation, Testing & Commissioning of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per specification and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make REGDA/TAPCON MR) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: Satec PM 130EH & A1621/Secure premier 300 both Note: ITC of Transformer CRP with TMU EA 10 0 0 0
2.02 Installation of CRP spare panel. This item only includes fixing of base frame, mounting of panel on base frame and connection of AC and DC supply. EA 10 0 0 0
2.03 G-DISM-PROT-66-CRP Dismantling of existing 66 kV C/R panel, it includes tranportation of CONTROL AND RELAY PANELS (66/33kV C<(>&<)>R panels of any make) from TATA power-DDL site to the store/site including loading and unloading at both ends by using suitable T<(>&<)>P such asTripod/crane etc. for safe loading/unloading as per project in-charge instructions. It also includes testing of existing IEDs befo re handed over the same to Project In-Charge. "Dismantling of LDR from existing CR Panel: Note: For PP3: Dismantling of existing 02 nos LDR from old CRP installed at PP3 Grid of 66kV PP1 Ckt-1 & 2, For BWN-7: Dismantling of existing 02 nos LDR from old CRP installed at BWN-7 Grid of 220kV Bawana Ckt-1 & 2 EA 10 0 0 0
2.04 SITC CABLE COMMUNICATION 2 PAIR TWISTED M 1000 0 0 0
2.05 SITC SPLITTER-15 PORT RJ11 CONNECTOR EA 5 0 0 0
2.06 ITC of 66kV Transformer CR Panel EA 5 0 0 0
2.07 ITC of 66kV Line CR Panel with LDR EA 3 0 0 0
2.08 ITC of 66kV Bus coupler CR Panel EA 1 0 0 0
2.09 ITC of 66kV BUS BAR DIFFERENTIAL PROTECTION PANEL EA 1 0 0 0
2.1 ITC of LDR 220V EA 3 0 0 0
2.11 ITC of PANEL C&R 66KV PTR PROCESS BUS - AIS EA 1 0 0 0
2.12 ITC of PANEL MERGING UNIT FOR PTR -AIS SUBSTATION EA 1 0 0 0
2.13 ITC of PANEL MERGING UNIT FOR PTR -GIS SUBSTATION EA 1 0 0 0
2.14 ITC of PANEL C&R 66KV PTR PROCESS BUS - GIS EA 1 0 0 0
2.15 ITC of 33kV Transformer CR Panel EA 1 0 0 0
2.16 ITC of 33kV Line CR Panel with LDR EA 1 0 0 0
2.17 ITC of PANEL C&R 66KV LINE FDR 220VDC SCADA COM GIS EA 1 0 0 0
2.18 ITC of LDR 50V EA 1 0 0 0
2.19 SITC of following items for integration of CRP with the existing Bus Bar panel: SITC of CT Switching relays: 02 nos SITC of Bus Bar Trip Relay (96): 01 nos SITC of Bus Bar Supervision Relay: 01 nos EA 3 0 0 0
2A Sub Total Part-B 0
Total Total of Part 1A+2A 0
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
S.No. Material Code Description Unit Total Qty PR/D0000/00263 66/11 kV Kanjhawala DTC EV Grid to supply load of 6.975MVA to EV depot PR/D0000/00260 66/11 kV Rohini-III DTC EV Grid to supply load of 7 MVA to EV depot PR/D0000/00259 66/11 kV Rohini-IV DTC EV Grid to supply load of 6 MVA to EV depot. PR/D0000/00264 66/11 kV Ghevra Savda DTC EV Grid to supply load of 10 MVA to EV depot. PR/D0000/00261 66/11 kV Narela A-3 DTC EV Grid to supply load of 6MVA to EV Depot. PR/E0000/00361 Installation of two 66/11kV 31.5MVA PTR including line bay Equipment and PTR bays with associated 11kV Switchgear Panels Equipment at Rohini Sec-11 Grid for Power Evacuation from BESS Station PR/E0000/00360 Addition 66/11kV 31.5MVA PTR4 @ Bawana-1 Grid PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00372 Addition 66/11kV 31.5MVA PTR4 @ RG24 Grid PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2 PR/E0000/00366 Addition 66/11kV 31.5MVA PTR3@Bawana1Ph2 PR/E0000/00296 AUGMENTATION OF PTR-4 AT DSIDC NARELA-1 GRID PR/E0000/00238 Augmentation of 20MVA PTR-3 AT RG-4 GRID PR/E0000/00374 RG-6 PTR-3 Augmentation 20 to 31.5MVA PR/E0000/00375 Augmentation of 16MVA PTR-2 at 33/11kV Saraswati Garden Grid Emergency Scheme
Location - Grid Name Kanjhawala Grid Rohini-III Rohini-IV Ghevra Savda Grid Narela A-3 Grid Rohini Sec-11 Bawana-1 Grid Bawana-6 Grid Rohini-24 Grid Bhalswa-2 Grid Bawana-1 Ph-2 Grid Narela A-1 Grid Rohini-4 Grid Rohini-6 Grid Saraswati Garden Grid Any other location
5 Master trip relay(86) Supervision Relay EA 8.00 2.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00
6 LINE DIFFERENTIAL RELAY 220 V EA 2.00 2.00 0.00 0.00 0.00 0.00
7 Panel Merging unit for PTR Bay AIS Substation (Not Complete Panel only merging unit) EA 1.00 1.00 0.00 0.00 0.00 0.00
8 Panel Merging unit for PTR Bay GIS Substation (Not Complete Panel only merging unit) EA 1.00 1.00 0.00 0.00 0.00 0.00
9 Reason S20 EFS switch EA 1.00 1.00 0.00 0.00 0.00 0.00
10 SFP switch Multimode Transceiver module EA 5.00 5.00 0.00 0.00 0.00 0.00
11 Transformer Trouble Aux Relays EA 4.00 4.00 0.00 0.00 0.00 0.00
12 CT Switching Aux Relays EA 0.00 0.00 0.00 0.00 0.00
13 Busbar trip relay(96) EA 0.00 0.00 0.00 0.00 0.00
14 Busbar trip relay(96) Supervision Relay EA 0.00 0.00 0.00 0.00 0.00
15 Process Bus Ethernet Switch EA 1.00 1.00
16 Station Bus Ethernet Switch EA 1.00 1.00
17 Process Bus TMU EA 2.00 1.00 1.00
18 Process Bus BCPU EA 2.00 1.00 1.00
19 Process Bus TDR EA 2.00 1.00 1.00
20 Bus-bar protection relay for 66kV 220V DC EA 1.00 1.00
PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2
Bawana-6 Grid Scope Bhalswa-2 Grid Scope
PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-1006 Conventional BCPU-01Nos Conventional TDR-01Nos Process bus BCPU-01Nos Process bus TDR-01Nos Process bus TMU-01Nos LIU (Light interface Unit)-02Nos Process Bus Ethernet Switches-02Nos Station bus Ethernet Switches-02Nos Other IED's and contacts shall be as per specification. Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-1006 Conventional BCPU-01Nos Conventional TDR-01Nos Process bus BCPU-01Nos Process bus TDR-01Nos Process bus TMU-01Nos LIU (Light interface Unit)-02Nos Process Bus Ethernet Switches-02Nos Station bus Ethernet Switches-02Nos Other IED's and contacts shall be as per specification.
PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-1006 Merging unit-4Nos(HV-2,LV-2) 12port LIU--2Nos Other IED's and contacts shall be as per specification. Panel Merging unit for PTR Bay GIS Substation with 100% redundancy.This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs Merging unit-4Nos(HV-2,LV-2) 12port LIU--2Nos Other IED's and contacts shall be as per specification.
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
Service - Long Text (if TATA Power-DDL specifications for any item is not available then respective IS will be followed. In case of non-availability of IS, IEC will be followed. )
S.No. Material Code/Service Code Description Unit Total Quantity PR/D0000/00263 66/11 kV Kanjhawala DTC EV Grid to supply load of 6.975MVA to EV depot PR/D0000/00260 66/11 kV Rohini-III DTC EV Grid to supply load of 7 MVA to EV depot PR/D0000/00259 66/11 kV Rohini-IV DTC EV Grid to supply load of 6 MVA to EV depot. PR/D0000/00264 66/11 kV Ghevra Savda DTC EV Grid to supply load of 10 MVA to EV depot. PR/D0000/00261 66/11 kV Narela A-3 DTC EV Grid to supply load of 6MVA to EV Depot. PR/E0000/00361 Installation of two 66/11kV 31.5MVA PTR including line bay Equipment and PTR bays with associated 11kV Switchgear Panels Equipment at Rohini Sec-11 Grid for Power Evacuation from BESS Station PR/E0000/00360 Addition 66/11kV 31.5MVA PTR4 @ Bawana-1 Grid PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00372 Addition 66/11kV 31.5MVA PTR4 @ RG24 Grid PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2 PR/E0000/00366 Addition 66/11kV 31.5MVA PTR3@Bawana1Ph2 PR/E0000/00296 AUGMENTATION OF PTR-4 AT DSIDC NARELA-1 GRID PR/E0000/00238 Augmentation of 20MVA PTR-3 AT RG-4 GRID PR/E0000/00374 RG-6 PTR-3 Augmentation 20 to 31.5MVA PR/E0000/00375 Augmentation of 16MVA PTR-2 at 33/11kV Saraswati Garden Grid Emergency Scheme
Location - Grid Name Kanjhawala Grid Rohini-III Rohini-IV Ghevra Savda Grid Narela A-3 Grid Rohini Sec-11 Bawana-1 Grid Bawana-6 Grid Rohini-24 Grid Bhalswa-2 Grid Bawana-1 Ph-2 Grid Narela A-1 Grid Rohini-4 Grid Rohini-6 Grid Saraswati Garden Grid Any other location
1 101001109 PANEL C&R 66KV TX BAY 220V DC SCADA COMP -GIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006-01, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. Panel width shall be less than 800 mm. ##This item is for GIS Grid EA 10.00 2.00 2.00 2.00 2.00 2.00
2 301002402 PANEL C&R 66KV TX BAY 220V DC SCADA COMP-AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG- EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. ##This item is for AIS Grid EA 5.00 2.00 1.00 1.00 1.00
3 301002403 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-AIS Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control,metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 ##This item is for AIS Grid EA 3.00 3.00
4 101000273 C&R BUS COUPLER 66KV (SCADA COMPATIBLE)- AIS Supply of 66kV Bus Coupler CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic <(>&<)> annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of : 66kV Bus Coupler panel = 1 No. Note: The control, metering <(>&<)> protection system shall be compatible for performing the functions as per the electrical specifications <(>&<)> shall be fully compatible with Process Bus based Substation Automation/SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames.Scope of CRP panels of 66 KV and 11 KV Switchgear <(>&<)> C<(>&<)>R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 · The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; · The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH <(>&<)> Elster A1621/Secure Premium300 · All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 · All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1.00 1.00
5 101000275 BUS BAR DIFFERENTIAL PROTECTION PANEL- AIS Supply of 66kV busbar protection CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of Bus Bar Protection with CT Swtching Scheme and provision of bypassing the protection as well. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005.Panels to be installed on base frames.Scope of CRP panels of 66KV and 11 KV Switchgear & C<(>&<)>R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: # The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 # The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; # The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH & Elster A1621/Secure Premium300 # All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 # All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1.00 1.00
6 101001150 PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1.00 1.00
7 101001152 PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-106 EA 1.00 1.00
8 101001149 Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1.00 1.00
9 101001151 Panel Merging unit for PTR Bay GIS Substation with 100% redundancy.This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs EA 1.00 1.00
10 101000324 LINE DIFFERENTIAL RELAY 220 V EA 3.00 3.00
11 301002405 PANEL C&R 33KV TX BAY 50VDC SCADA COMPT Supply of 33kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per specification and data sheet comprising of : Transformer panel. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications ENG-EHV-1005 & ENG-EHV-1006 & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: · The 33 kV transformer feeder of the station: Both Satec + Premier 300. This item also includes following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, Tr. Diff. Relay and TMU of PTR-3 C&R Panel(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable(v) The 33 kV transformer feeder of the station: Both Satec + Premier 300. shall be used for metering purpose.(vi) Integration & Testing of new IEDs with existing RTU (vii) Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(viii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs(x) Communication Cables and Splitter for the integration of Elster make Energy Meters with existing system. EA 1.00 1.00
12 301002404 PANEL C&R 33KV LINE FDR 50VDC SCADA COMP Supply of 33kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per TPDDL specifications ENG-EHV-1005 & ENG-EHV-1006 and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .Control and relay panel board with LDR and compatible with SCADA to be provided.All the relays/IED communications shall be on IEC 61850 protocol.Panels to be installed on base frames.Scope includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 33 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm.with required accessories as per TPDDL specifications. The scope of this item also includes the following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, LDR(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable.(v) Integration & Testing of new IEDs with existing RTU(vi)Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(vii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs EA 1.00 1.00
13 101000325 LINE DIFFERENTIAL RELAY 50 V EA 1.00 1.00
14 101001113 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-GIS Panel Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm. ##This item is for GIS Grid EA 1.00 1.00
15 205686 Installation, Testing & Commissioning of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per specification and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make REGDA/TAPCON MR) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: Satec PM 130EH & A1621/Secure premier 300 both Note: ITC of Transformer CRP with TMU EA 10.00 2.00 2.00 2.00 2.00 2.00
16 Installation of CRP spare panel. This item only includes fixing of base frame, mounting of panel on base frame and connection of AC and DC supply. EA 10.00 2.00 2.00 2.00 2.00 2.00
17 206962 G-DISM-PROT-66-CRP Dismantling of existing 66 kV C/R panel, it includes tranportation of CONTROL AND RELAY PANELS (66/33kV C<(>&<)>R panels of any make) from TATA power-DDL site to the store/site including loading and unloading at both ends by using suitable T<(>&<)>P such asTripod/crane etc. for safe loading/unloading as per project in-charge instructions. It also includes testing of existing IEDs befo re handed over the same to Project In-Charge. "Dismantling of LDR from existing CR Panel: Note: For PP3: Dismantling of existing 02 nos LDR from old CRP installed at PP3 Grid of 66kV PP1 Ckt-1 & 2, For BWN-7: Dismantling of existing 02 nos LDR from old CRP installed at BWN-7 Grid of 220kV Bawana Ckt-1 & 2 EA 10.00 2.00 2.00 2.00 2.00 2.00
18 SITC CABLE COMMUNICATION 2 PAIR TWISTED M 1,000.00 200.00 200.00 200.00 200.00 200.00
19 SITC SPLITTER-15 PORT RJ11 CONNECTOR EA 5.00 1.00 1.00 1.00 1.00 1.00
20 209586 ITC of 66kV Transformer CR Panel EA 5.00 2.00 1.00 1.00 1.00
21 209585 ITC of 66kV Line CR Panel with LDR EA 3.00 3.00
22 new-1 ITC of 66kV Bus coupler CR Panel EA 1.00 1.00
23 new-2 ITC of 66kV BUS BAR DIFFERENTIAL PROTECTION PANEL EA 1.00 1.00
25 new-3 ITC of PANEL C&R 66KV PTR PROCESS BUS - AIS EA 1.00 1.00
26 new-4 ITC of PANEL MERGING UNIT FOR PTR -AIS SUBSTATION EA 1.00 1.00
27 new-5 ITC of PANEL MERGING UNIT FOR PTR -GIS SUBSTATION EA 1.00 1.00
28 new-6 ITC of PANEL C&R 66KV PTR PROCESS BUS - GIS EA 1.00 1.00
29 209587 ITC of 33kV Transformer CR Panel EA 1.00 1.00
30 209588 ITC of 33kV Line CR Panel with LDR EA 1.00 1.00
31 new-7 ITC of PANEL C&R 66KV LINE FDR 220VDC SCADA COM GIS EA 1.00 1.00
32 new-8 ITC of LDR 50V EA 1.00 1.00
33 new-9 SITC of following items for integration of CRP with the existing Bus Bar panel: SITC of CT Switching relays: 02 nos SITC of Bus Bar Trip Relay (96): 01 nos SITC of Bus Bar Supervision Relay: 01 nos EA 3.00 1.00 1.00 1.00
PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2
Bawana-6 Grid Scope Bhalswa-2 Grid Scope
PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-1006 Conventional BCPU-01Nos Conventional TDR-01Nos Process bus BCPU-01Nos Process bus TDR-01Nos Process bus TMU-01Nos LIU (Light interface Unit)-02Nos Process Bus Ethernet Switches-02Nos Station bus Ethernet Switches-02Nos Other IED's and contacts shall be as per specification. Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-1006 Conventional BCPU-01Nos Conventional TDR-01Nos Process bus BCPU-01Nos Process bus TDR-01Nos Process bus TMU-01Nos LIU (Light interface Unit)-02Nos Process Bus Ethernet Switches-02Nos Station bus Ethernet Switches-02Nos Other IED's and contacts shall be as per specification.
PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-1006 Merging unit-4Nos(HV-2,LV-2) 12port LIU--2Nos Other IED's and contacts shall be as per specification. Panel Merging unit for PTR Bay GIS Substation with 100% redundancy.This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs Merging unit-4Nos(HV-2,LV-2) 12port LIU--2Nos Other IED's and contacts shall be as per specification.
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
S.No. Material Code Description Unit Total Qty PR/D0000/00263 66/11 kV Kanjhawala DTC EV Grid to supply load of 6.975MVA to EV depot PR/D0000/00260 66/11 kV Rohini-III DTC EV Grid to supply load of 7 MVA to EV depot PR/D0000/00259 66/11 kV Rohini-IV DTC EV Grid to supply load of 6 MVA to EV depot. PR/D0000/00264 66/11 kV Ghevra Savda DTC EV Grid to supply load of 10 MVA to EV depot. PR/D0000/00261 66/11 kV Narela A-3 DTC EV Grid to supply load of 6MVA to EV Depot. PR/E0000/00361 Installation of two 66/11kV 31.5MVA PTR including line bay Equipment and PTR bays with associated 11kV Switchgear Panels Equipment at Rohini Sec-11 Grid for Power Evacuation from BESS Station PR/E0000/00360 Addition 66/11kV 31.5MVA PTR4 @ Bawana-1 Grid PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00372 Addition 66/11kV 31.5MVA PTR4 @ RG24 Grid PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2 PR/E0000/00366 Addition 66/11kV 31.5MVA PTR3@Bawana1Ph2 PR/E0000/00296 AUGMENTATION OF PTR-4 AT DSIDC NARELA-1 GRID PR/E0000/00238 Augmentation of 20MVA PTR-3 AT RG-4 GRID PR/E0000/00374 RG-6 PTR-3 Augmentation 20 to 31.5MVA PR/E0000/00375 Augmentation of 16MVA PTR-2 at 33/11kV Saraswati Garden Grid Emergency Scheme
Location - Grid Name Kanjhawala Grid Rohini-III Rohini-IV Ghevra Savda Grid Narela A-3 Grid Rohini Sec-11 Bawana-1 Grid Bawana-6 Grid Rohini-24 Grid Bhalswa-2 Grid Bawana-1 Ph-2 Grid Narela A-1 Grid Rohini-4 Grid Rohini-6 Grid Saraswati Garden Grid Any other location
5 Master trip relay(86) Supervision Relay EA 8.00 2.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00
6 LINE DIFFERENTIAL RELAY 220 V EA 2.00 2.00 0.00 0.00 0.00 0.00
7 Panel Merging unit for PTR Bay AIS Substation (Not Complete Panel only merging unit) EA 1.00 1.00 0.00 0.00 0.00 0.00
8 Panel Merging unit for PTR Bay GIS Substation (Not Complete Panel only merging unit) EA 1.00 1.00 0.00 0.00 0.00 0.00
9 Reason S20 EFS switch EA 1.00 1.00 0.00 0.00 0.00 0.00
10 SFP switch Multimode Transceiver module EA 5.00 5.00 0.00 0.00 0.00 0.00
11 Transformer Trouble Aux Relays EA 4.00 4.00 0.00 0.00 0.00 0.00
12 CT Switching Aux Relays EA 0.00 0.00 0.00 0.00 0.00
13 Busbar trip relay(96) EA 0.00 0.00 0.00 0.00 0.00
14 Busbar trip relay(96) Supervision Relay EA 0.00 0.00 0.00 0.00 0.00
15 Process Bus Ethernet Switch EA 1.00 1.00
16 Station Bus Ethernet Switch EA 1.00 1.00
17 Process Bus TMU EA 2.00 1.00 1.00
18 Process Bus BCPU EA 2.00 1.00 1.00
19 Process Bus TDR EA 2.00 1.00 1.00
20 Bus-bar protection relay for 66kV 220V DC EA 1.00 1.00
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
S.No. Material Code Description Unit Total Qty PR/D0000/00263 66/11 kV Kanjhawala DTC EV Grid to supply load of 6.975MVA to EV depot PR/D0000/00260 66/11 kV Rohini-III DTC EV Grid to supply load of 7 MVA to EV depot PR/D0000/00259 66/11 kV Rohini-IV DTC EV Grid to supply load of 6 MVA to EV depot. PR/D0000/00264 66/11 kV Ghevra Savda DTC EV Grid to supply load of 10 MVA to EV depot. PR/D0000/00261 66/11 kV Narela A-3 DTC EV Grid to supply load of 6MVA to EV Depot. PR/E0000/00361 Installation of two 66/11kV 31.5MVA PTR including line bay Equipment and PTR bays with associated 11kV Switchgear Panels Equipment at Rohini Sec-11 Grid for Power Evacuation from BESS Station PR/E0000/00360 Addition 66/11kV 31.5MVA PTR4 @ Bawana-1 Grid PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00372 Addition 66/11kV 31.5MVA PTR4 @ RG24 Grid PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2 PR/E0000/00366 Addition 66/11kV 31.5MVA PTR3@Bawana1Ph2 PR/E0000/00296 AUGMENTATION OF PTR-4 AT DSIDC NARELA-1 GRID PR/E0000/00238 Augmentation of 20MVA PTR-3 AT RG-4 GRID PR/E0000/00374 RG-6 PTR-3 Augmentation 20 to 31.5MVA PR/E0000/00375 Augmentation of 16MVA PTR-2 at 33/11kV Saraswati Garden Grid Emergency Scheme
Location - Grid Name Kanjhawala Grid Rohini-III Rohini-IV Ghevra Savda Grid Narela A-3 Grid Rohini Sec-11 Bawana-1 Grid Bawana-6 Grid Rohini-24 Grid Bhalswa-2 Grid Bawana-1 Ph-2 Grid Narela A-1 Grid Rohini-4 Grid Rohini-6 Grid Saraswati Garden Grid Any other location
5 Master trip relay(86) Supervision Relay EA 8.00 2.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00
6 LINE DIFFERENTIAL RELAY 220 V EA 2.00 2.00 0.00 0.00 0.00 0.00
7 101001152 Panel Merging unit for PTR Bay AIS Substation EA 1.00 1.00 0.00 0.00 0.00 0.00
8 101001151 Panel Merging unit for PTR Bay GIS Substation EA 1.00 1.00 0.00 0.00 0.00 0.00
9 Reason S20 EFS switch EA 1.00 1.00 0.00 0.00 0.00 0.00
10 SFP switch Multimode Transceiver module EA 5.00 5.00 0.00 0.00 0.00 0.00
11 Transformer Trouble Aux Relays EA 4.00 4.00 0.00 0.00 0.00 0.00
12 CT Switching Aux Relays EA 2.00 2.00 0.00 0.00 0.00 0.00
14 Busbar trip relay(96) Supervision Relay EA 1.00 1.00 0.00 0.00 0.00 0.00
15 Process Bus Ethernet Switch EA 1.00 1.00
16 Station Bus Ethernet Switch EA 1.00 1.00
17 Process Bus TMU EA 2.00 1.00 1.00
18 Process Bus BCPU EA 2.00 1.00 1.00
19 Process Bus TDR EA 2.00 1.00 1.00
20 Bus-bar protection relay for 66kV 220V DC EA 1.00 1.00
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
S. NO. Material Code Item Descr. UOM Quantity "A" Unit Rate (Rs.) "a" Applicable GST (in Rs.) "b" Price per Unit (in Rs.) "B"= a+b TPDDL Amt (in Rs.) C=A*B HSN/ SAC code
1 Part-A: Supply Part
1.01 101001109 PANEL C&R 66KV TX BAY 220V DC SCADA COMP -GIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006-01, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. Panel width shall be less than 800 mm. ##This item is for GIS Grid EA 10 0 0 0
1.02 301002402 PANEL C&R 66KV TX BAY 220V DC SCADA COMP-AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG- EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. ##This item is for AIS Grid EA 5 0 0 0
1.03 301002403 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-AIS Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control,metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 ##This item is for AIS Grid EA 3 0 0 0
1.04 101000273 C&R BUS COUPLER 66KV (SCADA COMPATIBLE)- AIS Supply of 66kV Bus Coupler CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of : 66kV Bus Coupler panel = 1 No. Note: The control, metering <(>&<)> protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation/SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames.Scope of CRP panels of 66 KV and 11 KV Switchgear and C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 · The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; · The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH <(>&<)> Elster A1621/Secure Premium300 · All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 · All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1 0 0 0
1.05 101000275 BUS BAR DIFFERENTIAL PROTECTION PANEL- AIS Supply of 66kV busbar protection CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of Bus Bar Protection with CT Swtching Scheme and provision of bypassing the protection as well. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005.Panels to be installed on base frames.Scope of CRP panels of 66KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: # The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 # The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; # The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH & Elster A1621/Secure Premium300 # All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 # All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1 0 0 0
1.06 101001150 PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1 0 0 0
1.07 101001152 PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-106 EA 1 0 0 0
1.08 101001149 Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300. ##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1 0 0 0
1.09 101001151 Panel Merging unit for PTR Bay GIS Substation with 100% redundancy. This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs EA 1 0 0 0
1.1 101000324 LINE DIFFERENTIAL RELAY 220 V EA 3 0 0 0
1.11 301002405 PANEL C&R 33KV TX BAY 50VDC SCADA COMPT Supply of 33kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per specification and data sheet comprising of : Transformer panel. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications ENG-EHV-1005 & ENG-EHV-1006 & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: · The 33 kV transformer feeder of the station: Both Satec + Premier 300. This item also includes following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, Tr. Diff. Relay and TMU of PTR-3 C&R Panel(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable(v) The 33 kV transformer feeder of the station: Both Satec + Premier 300. shall be used for metering purpose.(vi) Integration & Testing of new IEDs with existing RTU (vii) Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(viii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs(x) Communication Cables and Splitter for the integration of Elster make Energy Meters with existing system. EA 1 0 0 0
1.12 301002404 PANEL C&R 33KV LINE FDR 50VDC SCADA COMP Supply of 33kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per TPDDL specifications ENG-EHV-1005 & ENG-EHV-1006 and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .Control and relay panel board with LDR and compatible with SCADA to be provided.All the relays/IED communications shall be on IEC 61850 protocol.Panels to be installed on base frames.Scope includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 33 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm.with required accessories as per TPDDL specifications. The scope of this item also includes the following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, LDR(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable.(v) Integration & Testing of new IEDs with existing RTU(vi)Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(vii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs EA 1 0 0 0
1.13 101000325 LINE DIFFERENTIAL RELAY 50 V EA 1 0 0 0
1.14 101001113 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-GIS Panel Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm. ##This item is for GIS Grid EA 1 0 0 0
1A Sub Total Part-A 0
2 Part-B: Service Part
2.01 Installation, Testing & Commissioning of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per specification and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make REGDA/TAPCON MR) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: Satec PM 130EH & A1621/Secure premier 300 both Note: ITC of Transformer CRP with TMU EA 10 0 0 0
2.02 Installation of CRP spare panel. This item only includes fixing of base frame, mounting of panel on base frame and connection of AC and DC supply. EA 10 0 0 0
2.03 G-DISM-PROT-66-CRP Dismantling of existing 66 kV C/R panel, it includes tranportation of CONTROL AND RELAY PANELS (66/33kV C<(>&<)>R panels of any make) from TATA power-DDL site to the store/site including loading and unloading at both ends by using suitable T<(>&<)>P such asTripod/crane etc. for safe loading/unloading as per project in-charge instructions. It also includes testing of existing IEDs befo re handed over the same to Project In-Charge. "Dismantling of LDR from existing CR Panel: Note: For PP3: Dismantling of existing 02 nos LDR from old CRP installed at PP3 Grid of 66kV PP1 Ckt-1 & 2, For BWN-7: Dismantling of existing 02 nos LDR from old CRP installed at BWN-7 Grid of 220kV Bawana Ckt-1 & 2 EA 10 0 0 0
2.04 SITC CABLE COMMUNICATION 2 PAIR TWISTED M 1000 0 0 0
2.05 SITC SPLITTER-15 PORT RJ11 CONNECTOR EA 5 0 0 0
2.06 ITC of 66kV Transformer CR Panel EA 5 0 0 0
2.07 ITC of 66kV Line CR Panel with LDR EA 3 0 0 0
2.08 ITC of 66kV Bus coupler CR Panel EA 1 0 0 0
2.09 ITC of 66kV BUS BAR DIFFERENTIAL PROTECTION PANEL EA 1 0 0 0
2.1 ITC of LDR 220V EA 3 0 0 0
2.11 ITC of PANEL C&R 66KV PTR PROCESS BUS - AIS EA 1 0 0 0
2.12 ITC of PANEL MERGING UNIT FOR PTR -AIS SUBSTATION EA 1 0 0 0
2.13 ITC of PANEL MERGING UNIT FOR PTR -GIS SUBSTATION EA 1 0 0 0
2.14 ITC of PANEL C&R 66KV PTR PROCESS BUS - GIS EA 1 0 0 0
2.15 ITC of 33kV Transformer CR Panel EA 1 0 0 0
2.16 ITC of 33kV Line CR Panel with LDR EA 1 0 0 0
2.17 ITC of PANEL C&R 66KV LINE FDR 220VDC SCADA COM GIS EA 1 0 0 0
2.18 ITC of LDR 50V EA 1 0 0 0
2A Sub Total Part-B 0
Total Total of Part 1A+2A 0
TENDER NO: TPDDL/ENGG/ENQ/200001982/26-27
DESCRIPTION: 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
TYPE OF TENDER: OPEN TENDER
Last Date of receipt of pre-bid queries, if any
Sr. No. Detailed Reference to Tata Power Technical Document. Please specify Document No / Clause No / Page No Description as per Bid Document Query / Clarification Tata Power DDL Reply Vendor name Email ID phone number
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
Service - Long Text (if TATA Power-DDL specifications for any item is not available then respective IS will be followed. In case of non-availability of IS, IEC will be followed. )
S.No. Material Code/Service Code Description Unit Total Quantity PR/D0000/00263 66/11 kV Kanjhawala DTC EV Grid to supply load of 6.975MVA to EV depot PR/D0000/00260 66/11 kV Rohini-III DTC EV Grid to supply load of 7 MVA to EV depot PR/D0000/00259 66/11 kV Rohini-IV DTC EV Grid to supply load of 6 MVA to EV depot. PR/D0000/00264 66/11 kV Ghevra Savda DTC EV Grid to supply load of 10 MVA to EV depot. PR/D0000/00261 66/11 kV Narela A-3 DTC EV Grid to supply load of 6MVA to EV Depot. PR/E0000/00361 Installation of two 66/11kV 31.5MVA PTR including line bay Equipment and PTR bays with associated 11kV Switchgear Panels Equipment at Rohini Sec-11 Grid for Power Evacuation from BESS Station PR/E0000/00360 Addition 66/11kV 31.5MVA PTR4 @ Bawana-1 Grid PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00372 Addition 66/11kV 31.5MVA PTR4 @ RG24 Grid PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2 PR/E0000/00366 Addition 66/11kV 31.5MVA PTR3@Bawana1Ph2 PR/E0000/00296 AUGMENTATION OF PTR-4 AT DSIDC NARELA-1 GRID PR/E0000/00238 Augmentation of 20MVA PTR-3 AT RG-4 GRID PR/E0000/00374 RG-6 PTR-3 Augmentation 20 to 31.5MVA PR/E0000/00375 Augmentation of 16MVA PTR-2 at 33/11kV Saraswati Garden Grid Emergency Scheme
Location - Grid Name Kanjhawala Grid Rohini-III Rohini-IV Ghevra Savda Grid Narela A-3 Grid Rohini Sec-11 Bawana-1 Grid Bawana-6 Grid Rohini-24 Grid Bhalswa-2 Grid Bawana-1 Ph-2 Grid Narela A-1 Grid Rohini-4 Grid Rohini-6 Grid Saraswati Garden Grid Any other location
1 101001109 PANEL C&R 66KV TX BAY 220V DC SCADA COMP -GIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006-01, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. Panel width shall be less than 800 mm. ##This item is for GIS Grid EA 10.00 2.00 2.00 2.00 2.00 2.00
2 301002402 PANEL C&R 66KV TX BAY 220V DC SCADA COMP-AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG- EHV-1005. The process bus based Transformer Monitoring Unit (A-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV transformer feeder of the station: Both Satec + Premier 300. ##This item is for AIS Grid EA 5.00 2.00 1.00 1.00 1.00
3 301002403 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-AIS Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control,metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 ##This item is for AIS Grid EA 3.00 3.00
4 101000273 C&R BUS COUPLER 66KV (SCADA COMPATIBLE)- AIS Supply of 66kV Bus Coupler CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic <(>&<)> annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of : 66kV Bus Coupler panel = 1 No. Note: The control, metering <(>&<)> protection system shall be compatible for performing the functions as per the electrical specifications <(>&<)> shall be fully compatible with Process Bus based Substation Automation/SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames.Scope of CRP panels of 66 KV and 11 KV Switchgear <(>&<)> C<(>&<)>R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 · The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; · The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH <(>&<)> Elster A1621/Secure Premium300 · All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 · All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1.00 1.00
5 101000275 BUS BAR DIFFERENTIAL PROTECTION PANEL- AIS Supply of 66kV busbar protection CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architectur and data sheet comprising of Bus Bar Protection with CT Swtching Scheme and provision of bypassing the protection as well. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005.Panels to be installed on base frames.Scope of CRP panels of 66KV and 11 KV Switchgear & C<(>&<)>R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: # The 33 and/or 66 kV line feeders connecting internal station from the new Grid: Elster A1621, Secure Premium300 # The 33 and/or 66 kV line feeders connecting DTL/BSES station from the new Grid: Elster A1800; # The 33 and/or 66 kV transformer feeder of the station: Both Satec PM 130EH & Elster A1621/Secure Premium300 # All feeders in 11 kV side, Incomers and Outgoings and Capacitor Bank:Elster A1621 # All 33/66/11 kV Bus Couplers and Bus Sections: Satec PM 130 EH Panel width shall be less than 1000 mm. EA 1.00 1.00
6 101001150 PANEL C&R 66KV PTR PROCESS BUS - AIS Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005,ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for AIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1.00 1.00
7 101001152 PANEL MERGING UNIT FOR PTR -AIS SUBSTATION Panel Merging unit for PTR Bay AIS Substation with 100% redundancy.This panel is for outdoor installtion (IP65) and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs ENG-EHV-1005,PEC-GEN-106 EA 1.00 1.00
8 101001149 Supply of 66kV Transformer CR Panel Indoor floor mounted, simplex typecontrol and relay panels, with mimic & annunciation panel for 66kVsystem as per latest version of TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDLProcess Bus based System Architecture and data sheet comprising ofTransformer panel. Note: The control, metering & protection system shallbe compatible for performing the functions as per the electricalspecifications & shall be fully compatible with Process Bus basedSubstation Automation /SCADA as defined in specifications of completionof works in totality including merging unit and outdoor marshallingcubicle. All the relays/IED communications shall be on IEC 61850 Ed.2protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. The Process Bus based Transformer Monitoring Unit (A-eberlemake RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCCpanel on Control and relay panel. Panels to be installed on base frames.Scope of CRP panels of 66 KV includes provisions required to meetfollowing requirement of Metering Philosophy of TPDDL for all futureGrids:The 66 kV transformer feeder of the station: Both Satec + Premier 300.##This item is for GIS GridPanel width shall be less than 1000 mm. ENG-EHV-1005 PEC-GEN-106 EA 1.00 1.00
9 101001151 Panel Merging unit for PTR Bay GIS Substation with 100% redundancy.This panel is for indoor installtion and will include Aux Relays , Trip supervision Relay , DC supervision Relay , Transformer Trouble Relays , Master 86 Relay , PT Changeover Schemes , LIUs EA 1.00 1.00
10 101000324 LINE DIFFERENTIAL RELAY 220 V EA 3.00 3.00
11 301002405 PANEL C&R 33KV TX BAY 50VDC SCADA COMPT Supply of 33kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per specification and data sheet comprising of : Transformer panel. Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications ENG-EHV-1005 & ENG-EHV-1006 & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make RE-GDA/SEL-2414 & SEL-2505) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: · The 33 kV transformer feeder of the station: Both Satec + Premier 300. This item also includes following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, Tr. Diff. Relay and TMU of PTR-3 C&R Panel(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable(v) The 33 kV transformer feeder of the station: Both Satec + Premier 300. shall be used for metering purpose.(vi) Integration & Testing of new IEDs with existing RTU (vii) Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(viii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs(x) Communication Cables and Splitter for the integration of Elster make Energy Meters with existing system. EA 1.00 1.00
12 301002404 PANEL C&R 33KV LINE FDR 50VDC SCADA COMP Supply of 33kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 33kV system as per TPDDL specifications ENG-EHV-1005 & ENG-EHV-1006 and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .Control and relay panel board with LDR and compatible with SCADA to be provided.All the relays/IED communications shall be on IEC 61850 protocol.Panels to be installed on base frames.Scope includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 33 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 33 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm.with required accessories as per TPDDL specifications. The scope of this item also includes the following :(ii) Parameterization, Integration, Testing & Commissioning of IEDs viz., BCPU, LDR(iv) Proposed IEDs should own Redundant RJ45 Port at its rear side to communicate with RTU over CAT-6 Cable.(v) Integration & Testing of new IEDs with existing RTU(vi)Supply of Control Cable for extending AC and DC Power Supply from ACDB and DCDB to RTU Panel(vii) Supply of CAT-6 Cable, FOC and RS485 Cable for the integration of existing IEDs and new IEDs EA 1.00 1.00
13 101000325 LINE DIFFERENTIAL RELAY 50 V EA 1.00 1.00
14 101001113 PANEL C&R 66KV LINE FDR 220VDC SCADA COM-GIS Panel Supply of 66kV Line CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per TPDDL specifications ENG-EHV-1005, ENG-EHV-1006, TPDDL Process Bus based System Architecture and data sheet comprising of Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with Process Bus based Substation Automation /SCADA as defined in specifications of completion of works in totality including merging unit and outdoor marshalling cubicle. Control and relay panel board with LDR and compatible with Process Bus based SCADA to be provided. All the relays/IED communications shall be on IEC 61850 Ed.2 protocol and IO Capacity of proposed IEDs should be as specified in ENG-EHV-1005. Panels to be installed on base frames. Scope of CRP panels of 66 KV and 11 KV Switchgear & C&R panels includes provisions required to meet following requirement of Metering Philosophy of TPDDL for all future Grids: · The 66 kV line feeders connecting internal station from the new Grid: Satec + Premier 300 · The 66 kV line feeders connecting DTL/BSES station from the new Grid: Satec + Premier 300 / Apex 150 Panel width shall be less than 1000 mm. ##This item is for GIS Grid EA 1.00 1.00
15 205686 Installation, Testing & Commissioning of 66kV Transformer CR Panel Indoor floor mounted, simplex type control and relay panels, with mimic & annunciation panel for 66kV system as per specification and data sheet comprising of Transformer panel Note: The control, metering & protection system shall be compatible for performing the functions as per the electrical specifications & shall be fully compatible with substation automation /SCADA as defined in specifications of completion of works in totality .All the relays/IED communications shall be on IEC 61850 protocol.The microprocessor based Transformer monitoring relay (a-eberle make REGDA/TAPCON MR) shall be provided in place of RTCC panel on Control and relay panel.Panels to be installed on base frames. The 33 and/or 66 kV transformer feeder of the station: Satec PM 130EH & A1621/Secure premier 300 both Note: ITC of Transformer CRP with TMU EA 10.00 2.00 2.00 2.00 2.00 2.00
16 Installation of CRP spare panel. This item only includes fixing of base frame, mounting of panel on base frame and connection of AC and DC supply. EA 10.00 2.00 2.00 2.00 2.00 2.00
17 206962 G-DISM-PROT-66-CRP Dismantling of existing 66 kV C/R panel, it includes tranportation of CONTROL AND RELAY PANELS (66/33kV C<(>&<)>R panels of any make) from TATA power-DDL site to the store/site including loading and unloading at both ends by using suitable T<(>&<)>P such asTripod/crane etc. for safe loading/unloading as per project in-charge instructions. It also includes testing of existing IEDs befo re handed over the same to Project In-Charge. "Dismantling of LDR from existing CR Panel: Note: For PP3: Dismantling of existing 02 nos LDR from old CRP installed at PP3 Grid of 66kV PP1 Ckt-1 & 2, For BWN-7: Dismantling of existing 02 nos LDR from old CRP installed at BWN-7 Grid of 220kV Bawana Ckt-1 & 2 EA 10.00 2.00 2.00 2.00 2.00 2.00
18 SITC CABLE COMMUNICATION 2 PAIR TWISTED M 1,000.00 200.00 200.00 200.00 200.00 200.00
19 SITC SPLITTER-15 PORT RJ11 CONNECTOR EA 5.00 1.00 1.00 1.00 1.00 1.00
20 209586 ITC of 66kV Transformer CR Panel EA 5.00 2.00 1.00 1.00 1.00
21 209585 ITC of 66kV Line CR Panel with LDR EA 3.00 3.00
22 new-1 ITC of 66kV Bus coupler CR Panel EA 1.00 1.00
23 new-2 ITC of 66kV BUS BAR DIFFERENTIAL PROTECTION PANEL EA 1.00 1.00
25 new-3 ITC of PANEL C&R 66KV PTR PROCESS BUS - AIS EA 1.00 1.00
26 new-4 ITC of PANEL MERGING UNIT FOR PTR -AIS SUBSTATION EA 1.00 1.00
27 new-5 ITC of PANEL MERGING UNIT FOR PTR -GIS SUBSTATION EA 1.00 1.00
28 new-6 ITC of PANEL C&R 66KV PTR PROCESS BUS - GIS EA 1.00 1.00
29 209587 ITC of 33kV Transformer CR Panel EA 1.00 1.00
30 209588 ITC of 33kV Line CR Panel with LDR EA 1.00 1.00
31 new-7 ITC of PANEL C&R 66KV LINE FDR 220VDC SCADA COM GIS EA 1.00 1.00
32 new-8 ITC of LDR 50V EA 1.00 1.00
Annexure-1 (Schedule of Item)
NIT No - TPDDL/ENGG/ENQ/200001982/26-27
NIT Description - 1 Year RC for SITC works of 66KV & 33KV Control Relay and Panels for Deposit and CAPEX Schemes
S.No. Material Code Description Unit Total Qty PR/D0000/00263 66/11 kV Kanjhawala DTC EV Grid to supply load of 6.975MVA to EV depot PR/D0000/00260 66/11 kV Rohini-III DTC EV Grid to supply load of 7 MVA to EV depot PR/D0000/00259 66/11 kV Rohini-IV DTC EV Grid to supply load of 6 MVA to EV depot. PR/D0000/00264 66/11 kV Ghevra Savda DTC EV Grid to supply load of 10 MVA to EV depot. PR/D0000/00261 66/11 kV Narela A-3 DTC EV Grid to supply load of 6MVA to EV Depot. PR/E0000/00361 Installation of two 66/11kV 31.5MVA PTR including line bay Equipment and PTR bays with associated 11kV Switchgear Panels Equipment at Rohini Sec-11 Grid for Power Evacuation from BESS Station PR/E0000/00360 Addition 66/11kV 31.5MVA PTR4 @ Bawana-1 Grid PR/E0000/00371 Addition 66/11kV 31.5MVA PTR4 @ Bawana-6 PR/E0000/00372 Addition 66/11kV 31.5MVA PTR4 @ RG24 Grid PR/E0000/00373 Addition 66/11kV 31.5MVA PTR3@ Bhalswa-2 PR/E0000/00366 Addition 66/11kV 31.5MVA PTR3@Bawana1Ph2 PR/E0000/00296 AUGMENTATION OF PTR-4 AT DSIDC NARELA-1 GRID PR/E0000/00238 Augmentation of 20MVA PTR-3 AT RG-4 GRID PR/E0000/00374 RG-6 PTR-3 Augmentation 20 to 31.5MVA PR/E0000/00375 Augmentation of 16MVA PTR-2 at 33/11kV Saraswati Garden Grid Emergency Scheme
Location - Grid Name Kanjhawala Grid Rohini-III Rohini-IV Ghevra Savda Grid Narela A-3 Grid Rohini Sec-11 Bawana-1 Grid Bawana-6 Grid Rohini-24 Grid Bhalswa-2 Grid Bawana-1 Ph-2 Grid Narela A-1 Grid Rohini-4 Grid Rohini-6 Grid Saraswati Garden Grid Any other location
5 Master trip relay(86) Supervision Relay EA 8.00 2.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00
6 LINE DIFFERENTIAL RELAY 220 V EA 2.00 2.00 0.00 0.00 0.00 0.00
7 101001152 Panel Merging unit for PTR Bay AIS Substation EA 1.00 1.00 0.00 0.00 0.00 0.00
8 101001151 Panel Merging unit for PTR Bay GIS Substation EA 1.00 1.00 0.00 0.00 0.00 0.00
9 Reason S20 EFS switch EA 1.00 1.00 0.00 0.00 0.00 0.00
10 SFP switch Multimode Transceiver module EA 5.00 5.00 0.00 0.00 0.00 0.00
11 Transformer Trouble Aux Relays EA 4.00 4.00 0.00 0.00 0.00 0.00
12 CT Switching Aux Relays EA 2.00 2.00 0.00 0.00 0.00 0.00
14 Busbar trip relay(96) Supervision Relay EA 1.00 1.00 0.00 0.00 0.00 0.00
Supplier Sustainability Index Questionnaire
Vendor Name : Vendor Code : Date : Vendor Code
Parameter Category (Marks) S. No. Questions Detail Description Max Score Scoring Criteria
Marks Gain Response by BA Remark By BA
Environment (100) Carbon Footprint (20) 1 Does your organization calculate GHG emissions? Please select the suitable option (Select any one response): a) Yes, we calculate the GHG emissions and data is available since FY ….... b) No, but we have plans to start GHG inventorization from FY ….... c) No, we do not compute GHG emissions, nor we have any plans in near future to do so. 5 a) 5 b) 2 c) 0
2 Which GHG emissions your organization has computed and what is their value? Please select the suitable option (multiple responses can be selected): a) Scope-1 (Direct GHG emissions from sources owned or controlled by the organization); Emissions for FY 25: .................. b) Scope-2 (Indirect GHG emissions from the generation of purchased electricity, steam, heating, and cooling consumed by the organization) Emissions for FY 25: .................. c) Scope-3 (Indirect emissions from activities upstream and downstream of the value chain, i.e. with purchasers and suppliers) Emissions for FY 25: .................. 10 a) 4 b) 4 c) 2
3 Has your organization set targets & programs to reduce carbon footprint in its overall logistic operation? Please select the suitable option (Select any one response): a) Yes, our organization has set targets and programs to reduce carbon footprint. b) No, our organization does not have set targets and programs to reduce carbon footprint. c) Partially, our organization has some initiatives but no specific targets or programs in place. d) Unsure/ Not applicable 5 a) 5 b) 0 c) 3 d) 0
Energy Consumption and Efficiency (10) 4 How does your organization manage and optimize energy consumption? Please select the suitable option (multiple responses can be selected): a) We regularly conduct energy audits and implement energy-efficient technologies. b) We have designated energy management teams to monitor and improve energy usage. c) We actively promote energy-saving practices and provide employee training on energy conservation. d) We have implemented automated systems to track and control energy consumption. e) Our organization does not have specific measures in place to manage or optimize energy consumption. 5 a) 2 b) 1 c) 1 d) 1 e) 0
5 Does the organization monitor Stack Emissions (source specific) and/ or Ambient Air Emissions (area wide) in its premises? a) Yes, the organization regularly monitors both Stack and Ambient Air Emissions b) Yes, the organization monitors Stack Air Emissions only c) Yes, the organization monitors Ambient Air Emissions only d) No, the organization does not monitor Stack or Ambient Air Emissions 5 a) 5 b) 3 c) 3 d) 0
Waste Management/ Packaging (10) 6 What are the different categories of waste which your organization generates? Please select the suitable option (multiple responses can be selected): a) Hazardous Waste and/or Battery Waste b) Plastic Waste c) Metal Waste d) Biomedical Waste e) Municipal Soild Waste & other waste streams 5 a) 1 b) 1 c) 1 d) 1 e) 1
7 Does your organization has a process to recycle these waste categories either in-house or through external agency? a) Yes, all types of waste generated by us is recycled b) Yes, ....% of our waste goes for recycling c) We are not aware if any of our waste is recycled 2 a) 2 b) 1 c) 0
8 How does the organization incorporate packaging reduction, reuse, and recycling in its purchasing practices? Please select the suitable option (multiple responses can be selected): a) We actively seek suppliers who offer minimal packaging or sustainable packaging options b) We prioritize reusable packaging solutions when available and feasible c) We have established policies to encourage recycling of packaging materials d) Our organization does not specifically address packaging reduction, reuse, or recycling in purchasing practices 3 a) 1 b) 1 c) 1 d) 0
Water Management (15) 9 Has your organization set specific targets to reduce water consumption? a) Yes, our organization has set specific targets to reduce water consumption b) Our organization has some standalone initiatives to reduce water consumption, but no specific targets are set c) No standalone initiatives or targets are there to reduce water consumption 3 a) 3 b) 2 c) 0
10 Do you have a functional Rainwater Harvesting System at your facility? a) Yes with a capacity of …….KLD in …... sqm of catchment area b) No, but we have plans to put a RWH system by …..... c) No, we do not have any plans of putting up RWH in our premises 2 a) 2 b) 1 c) 0
11 What is the source wise consumption of water in your organization? Please select the suitable option (multiple responses can be selected): a) Underground Borewell approved by local authority; ..... KL b) Underground Borewell not approved by local authority; ..... KL c) Piped Municipal water supply; ..... KL d) Water Tanker; ...... KL e) Packaged Drinking Water; ...... KL f) Treated Waste Water; ..... KL g) Water consumption is not monitored in our organization 7 a) 1 b) 1 c) 1 d) 1 e) 1 f) 2 e) 0
12 Do you have any waste water treatment facility in your organization? a) Yes, we have waste water treatment facility of ….... KLD b) No, we do not have waste water treatment facility 3 a) 3 b) 0
Innovation for Sustainability (20) 13 How is your organization fostering innovation to address sustainability challenges? Please select the suitable option (multiple responses can be selected): a) By investing in internal R&D initiatives focused on sustainability. b) By establishing cross-functional teams dedicated to innovation in sustainability. c) By partnering with external stakeholders such as startups, research institutions, or NGOs. d) By encouraging employee-led sustainability projects and ideas. e) By participating in industry collaborations or consortia focused on sustainability innovation. f) Unsure/ Not applicable 10 a) 2 b) 2 c) 2 d) 2 e) 2 f) 0
14 Please share examples in support of the above. free text 10 5 marks of each example (mention any two examples)
Continuous Improvement (15) 15 Has your organization set specific ESG targets, and how are they monitored? a) Yes, our organization has set specific ESG targets, and they are monitored through regular performance assessments via well defined KPIs. b) Partial - While we do not have specific targets, but we monitor key parameters related to ESG. c) No, our organization has not set any specific ESG targets. 5 a) 5 b) 2 c) 0
16 How does your organization engage in continuous improvement in sustainability practices? Please select the suitable option (multiple responses can be selected): a) By conducting regular sustainability audits and assessments. b) By implementing feedback mechanisms from stakeholders on sustainability initiatives. c) By setting and reviewing sustainability goals on a regular basis. d) By participating in sustainability-focused training and education programs. e) By benchmarking against industry best practices on sustainability. f) By integrating sustainability considerations into decision-making processes. g) Other (Please specify) ________________________ 5 1 mark for each response with a maximum of 5 marks
17 Has the organization taken any initiative(s) to improve the Recyclability Ration of its products (End of Life Treatment) to reduce the impact of manufactured products on the environment and society? a) Yes [please share the details] b) No 5 a) 5 b)0
Renewable Energy (10) 18 Has your organization installed solar panels in the facility for renewable power generation? a) Yes for ….. KW b) No, but we purchase solar power from outside c) No, we do not have solar power in our energy mix 5 5 if details are provided else 0
19 Please provide the % share of solar in overall energy consumption (if response to previous question is Yes) …. %
20 Are you using Electric Vehicles in your organization setup? a) Yes, we have …... nos. of EVs deployed b) No, we do not have any EV in our setup 5 5 if details are provided else 0
21 In case response to previous question is "Yes", please share the details of EVs deployed in your organization setup with respect to type of usage etc. free text
Social (50) Labor Practices (20) 22 How does your organization ensure fair wages, working hours, and safe working conditions? Please select the suitable options (multiple responses can be selected): a) By implementing regular wage reviews and adjustments to ensure fair compensation. b) By adhering to legal regulations and industry standards regarding working hours. c) By conducting regular workplace inspections and safety audits to maintain safe working conditions. d) By providing training and education on labor rights and safety protocols to employees. e) By establishing grievance mechanisms for employees to report concerns about wages or working conditions. f) By collaborating with labor unions or worker advocacy groups to address labor-related issues. 10 a) 2 b) 2 c) 2 d) 1 e)2 f) 1 Maximum 10 marks
23 Does your organization have a presence of an Internal Review Committee and Policies to ensure the workplace is free of physical abuse, corporal punishment, physical contact with the intent to injure or intimidate, and disciplinary measures that cause physical discomfort? a) Yes, our organization has an Internal Review Committee and Policies in place to ensure the workplace is free from physical abuse and corporal punishment. b) Yes, our organization has Policies in place to ensure the workplace is free from physical abuse and corporal punishment, but there is no specific Internal Review Committee. c) No, our organization does not have specific Policies or an Internal Review Committee addressing physical abuse and corporal punishment. 5 a) 5 b) 3 c) 0
24 Can you provide information on diversity, equity, and inclusion within your workforce? a) Yes, our organization actively collects and reports data on diversity, equity, and inclusion metrics within our workforce. b) Yes, our organization has implemented initiatives and programs to promote diversity, equity, and inclusion within our workforce but does not currently collect or report data on diversity, equity, and inclusion within our workforce. c) No, our organization does not have specific initiatives or programs focused on diversity, equity, and inclusion within our workforce. 5 a) 5 b) 3 c) 0
Supply Chain Labor Standards (10) 25 How do you ensure that your suppliers adhere to fair labor practices? Please select the suitable option (multiple responses can be selected): a) By conducting regular audits or assessments of suppliers' labor practices. b) By requiring suppliers to sign agreements or contracts that include provisions for fair labor practices. c) By providing training and guidance to suppliers on fair labor standards and expectations. d) By engaging with suppliers in dialogue and collaboration to address any issues related to fair labor practices. e) By sourcing from suppliers with recognized certifications or accreditations related to fair labor practices. 5 a) 1 b) 1 c) 1 d) 1 e) 1
26 What steps are taken to address human rights issues in your supply chain? Please select the suitable option (multiple responses can be selected): a) Regular audits or assessments of suppliers' human rights practices. b) Requiring suppliers to adhere to codes of conduct or standards that include human rights provisions. c) Providing training and guidance to suppliers on human rights standards and expectations. d) Engaging with suppliers in dialogue and collaboration to address human rights issues. e) Sourcing from suppliers with recognized certifications or accreditations related to human rights practices. 5 a) 1 b) 1 c) 1 d) 1 e) 1
Community Engagement (20) 27 To promote social responsibility in its value (supply) chain, is there any visible commitment from the Top Management of the organization to integrate ESG criteria under a Responsible Supply Chain Policy/Program such as but not limited to Ethical, Social, Environmental and Gender Equality criteria, and health and safety, in its purchasing, distribution and contracting policies and practices to improve consistency with social responsibility objectives. a) Yes, there is visible commitment from Top Management to integrate ESG criteria into a Responsible Supply Chain Policy/ Program. b) Partially, there is some commitment from Top Management, but not all aspects of ESG criteria are integrated into the Responsible Supply Chain Policy/Program. c) No, there is no visible commitment from Top Management to integrate ESG criteria into a Responsible Supply Chain Policy/Program. 10 a) 10 b) 5 c) 0
28 Describe your organization's initiatives for supporting local communities where you operate. Please select the suitable option (multiple responses can be selected): a) We actively participate in community outreach programs and events. b) We contribute to local charities or nonprofits through donations or volunteer work. c) We collaborate with local stakeholders to address community needs and concerns. d) We provide employment opportunities and skill development programs for community members. e) We sponsor or support local educational or environmental initiatives. 10 a) 2 b) 2 c) 2 d) 2 e) 2
Governance (50) Ethics and Anti-Corruption (20) 29 Does the organization measure the following information:- Total number of substantiated complaints received concerning breaches of customer privacy? a) Yes, it is measured, there were ….. nos. in FY 25 b) No, it is not measured 5 a) 5 b) 0
30 Does the organization measures the following information:- Total number of identified leaks, thefts, or losses of customer data? a) Yes, it is measured, there were ….. nos. in FY 25 b) No, it is not measured 5 a) 5 b) 0
31 How does your organization prevent and address corruption risks? Please select the suitable option (multiple responses can be selected): a) By implementing robust anti-corruption policies and procedures. b) By conducting regular training on anti-corruption measures for employees. c) By establishing clear channels for reporting corruption concerns. d) By conducting periodic risk assessments to identify and mitigate corruption risks. e) By collaborating with law enforcement agencies or regulatory bodies to address corruption issues. 5 a) 1 b) 1 c) 1 d) 1 e) 1
32 Has the organization established a Code of Business Ethics, endorsed by senior management indicating organization’s values, principles, standards, and norms of behavior? a) Yes, our organization has established a Code of Business Ethics endorsed by senior management. b) No, we do not have any Code of Business Ethics endorsed by our senior management as of now, but we plan to introduce it by FY ...... c) No, we do not have any Code of Business Ethics endorsed by our senior management, nor we have any immediate plans for the same. d) Unsure/ Not applicable. 5 a) 5 b) 2 c) 0 d) 0
Transparency and Reporting (15) 33 How does your organization communicate its ESG efforts to stakeholders? Please select the suitable option (multiple responses can be selected): a) Through regular reports or publications dedicated to ESG initiatives. b) By hosting stakeholder meetings or forums specifically focused on ESG topics. c) Via dedicated sections on the company website or sustainability reports. d) Through social media platforms or other digital communication channels. e) By participating in industry conferences or events focused on sustainability. 5 a) 1 b) 1 c) 1 d) 1 e) 1
34 Is there a well-established governance structure for regulating/governing its policies? a) Yes, there is a well-established governance structure in place. b) Partially, there is some governance structure, but it's not well-established. c) No, there is no well-established governance structure in place, but we intend to establish the same by FY ..... d) No, there is no well-established governance structure in place, nor do we have any plans to establish the same in near future. 5 a) 5 b) 3 c) 1 d) 0
35 Are all labor, health, and safety policies, practices, and expectations communicated to all employees and suppliers in local or appropriate languages? a) Yes, all policies, practices, and expectations are communicated in local or appropriate languages. b) Partially, some policies, practices, and expectations are communicated in local or appropriate languages, but not all. c) No, not all policies, practices, and expectations are communicated in local or appropriate languages. 5 a) 5 b) 3 c) 0
Certifications (15) 36 Does your organization have following certifications (valid till date-please mention validity) Please select the suitable option (multiple responses can be selected): a) ISO 9001 accreditation b) ISO 20400:2017 or equivalent c) SA 8000 or equivalent d) ISO 14001 certification e) ISO 18001/45001 or equivalent f) ISO/IEC 27001 or equivalent g) Other (Please specify) ________________________ 15 a) 1 b) 5 c) 4 d) 2 e) 1 f) 1 g) 1
What is GHG emission?
GHG emission stands for Greenhouse Gas emission, which refers to the release of gases into the Earth's atmosphere that trap heat and contribute to global warming and climate change.
Key Greenhouse Gases (GHGs):
1. Carbon dioxide (CO₂) – from burning fossil fuels like coal, oil, and gas.
2. Methane (CH₄) – from agriculture (e.g., livestock), landfills, and natural gas leaks.
3. Nitrous oxide (N₂O) – from fertilizers, agricultural activities, and combustion.
4. Fluorinated gases – synthetic gases from industrial processes (e.g., HFCs, PFCs, SF₆).
🔥 Why GHG Emissions Matter:
GHGs act like a blanket around the Earth. They trap heat in the atmosphere, which leads to:
· Rising global temperatures
· Melting glaciers and rising sea levels
· More extreme weather (storms, droughts, floods)
· Disruption of ecosystems and food supply
📏 Measuring GHG Emissions:
GHG emissions are usually measured in tonnes of carbon dioxide equivalent (tCO₂e) to account for the different warming potentials of each gas.
· 1 tonne of methane (CH₄) = ~28–36 tonnes of CO₂e over 100 years
· 1 tonne of nitrous oxide (N₂O) = ~265–298 tonnes of CO₂e
📊 Types of GHG Emissions (Scopes):
Scope Description Examples
Scope 1 Direct emissions from owned/controlled sources Company vehicles, fuel combustion on-site
Scope 2 Indirect emissions from purchased energy Electricity used in buildings or factories
Scope 3 All other indirect emissions in the value chain Business travel, waste, supply chain emissions
🏭 Why Are GHG Emissions Important?
Climate Change: GHGs are the primary drivers of global warming.
Regulatory Compliance: Many countries require GHG reporting.
Sustainability Goals: Companies track emissions to reduce their carbon footprint.
Investor & Customer Pressure: Transparency and climate responsibility matter.
Scope 1 Emission:
Scope 1 emissions refer to direct greenhouse gas (GHG) emissions from sources that are owned or controlled by an organization. These include:
Sources of Scope 1 Emissions:
1. Stationary Combustion – e.g., fuel burned in boilers, furnaces, generators.
2. Mobile Combustion – e.g., fuel used in company-owned vehicles.
3. Process Emissions – e.g., emissions from chemical processes in manufacturing.
4. Fugitive Emissions – e.g., leakage from refrigerants or gas pipelines.
Scope 1 Emission Calculation Formula:
Scope 1 Emissions (tCO₂e)=∑(Fuel Quantity×Emission Factor)
Fuel Quantity is the amount of fuel used (in litres, m³, kg, etc.).
Emission Factor is a standard value indicating how much CO₂ (or CO₂e) is emitted per unit of fuel used. These values are typically provided by:
IPCC (Intergovernmental Panel on Climate Change)
National databases (e.g., US EPA, UK DEFRA, India’s CEA)
Example Calculation:
Scenario: A company uses 10,000 litres of diesel in generators annually.
Emission Factor (diesel): ~2.68 kg CO₂/litre
10,000 litres×2.68 kg CO₂/litre=26,800 kg CO₂=26.8 tCO₂
So, the Scope 1 emissions from diesel use = 26.8 tonnes CO₂e
Scope 2 Emission:
🔌 Scope 2 Emissions – What Are They?
Scope 2 emissions are indirect greenhouse gas emissions from the generation of purchased electricity, steam, heating, or cooling consumed by your organization.
Even though these emissions occur at the power plant (not on-site), they are accounted for by the buyer of the energy to reflect true carbon responsibility.
📐 Scope 2 Emission Calculation Formula
Scope 2 Emissions (tCO₂e)=Electricity Consumed(kWh)×Emission Factor (kg CO₂e/kWh)÷1000
Electricity Consumed: in kilowatt-hours (kWh)
Emission Factor: varies by country and source (coal, gas, hydro, renewables, etc.)
Conversion factor ÷ 1000 to convert kg to tonnes (tCO₂e)
📊 Example Calculation
Your organization consumes 100,000 kWh of grid electricity annually
Emission factor for your grid = 0.82 kg CO₂e/kWh (common in coal-heavy grids like India)
📌 Emission Factor References (Typical Values)*:
Region Grid Emission Factor (kg CO₂e/kWh)
India (CEA, 2023) ~0.82
USA (EPA Avg.) ~0.40
Renewable Energy ~0.0
Scope 2 GHG emission calculation:
If require want help of chatgpt for calculation:
e.g. type below sentence in chatgpt
“My factory annual electricity consumption is 12000 kwh in india. calculate scope 2 GHG emission value for me.”
It will give below reply:
Thanks! Based on your input:
Annual electricity consumption = 12,000 kWh
Location = India
Grid Emission Factor (India, CEA 2023) = 0.82 kg CO₂e/kWh
📊 Scope 2 Emissions Calculation:
Scope 2 Emissions = 12,000 kWh×0.82 kg CO₂e/kWh=9,840 kg CO₂e
9,840kg CO₂e ÷ 1000 = 9.84tonnes CO₂e (tCO₂e)
Your factory’s Scope 2 GHG emissions = 9.84 tCO₂e per year
Scope 3 Emission:
🌐 Scope 3 Emissions – What Are They?
Scope 3 emissions are all other indirect GHG emissions that occur in your value chain — both upstream (supplier side) and downstream (customer side). These do not come from owned or directly controlled sources but are a major part of your overall carbon footprint.
🔍 Examples of Scope 3 Activities:
Category Examples
Upstream Purchased goods & services, transportation, business travel, waste
Downstream Use of sold products, product disposal, downstream transport, franchises
Employee-related Commuting, leased assets
📐 How to Calculate Scope 3 Emissions
Because Scope 3 involves many sources, each category may use a different approach:
✅ General Formula:
Emissions (tCO₂e)=Activity Data×Emission Factor
· Activity Data = e.g., amount of goods purchased, km traveled, tonnes of waste
· Emission Factor = standard GHG factor for that activity (from sources like DEFRA, GHG Protocol, etc.)
📊 Example Calculation – Purchased Goods
· Your factory purchases 5 tonnes of steel per year
· Emission factor for steel production = 1.9 tCO₂e per tonne
5 tonnes×1.9 tCO₂e/tonne=9.5 tCO₂e5
You would repeat this process for each major activity under Scope 3.
✏️ To Calculate Scope 3 for Your Factory, if require you can use open source available on web & provide below detail for calculation of scope 3:
1. Purchased goods (type and quantity)
2. Waste generated (in tonnes or kg)
3. Business travel data (km, flights, etc.)
4. Employee commuting (approximate number, distance, transport type)
5. Transport of goods (inbound/outbound, km and tonnes)
6. Other relevant Scope 3 activities
🌫️ Stack and Ambient Air Emissions – Overview
In air pollution control and environmental compliance, stack emissions and ambient air emissions refer to two key concepts for monitoring and managing air quality.
🔥 1. Stack Emissions (Point Source Emissions)
These are air pollutants emitted from a fixed source, such as a chimney, furnace, or exhaust stack of a factory, boiler, or power plant.
🏭 Key Characteristics:
· Controlled and measurable
· Emitted directly into the atmosphere
· Subject to environmental regulation and pollution control norms
📋 Typical Stack Pollutants:
· Particulate Matter (PM10, PM2.5)
· Sulphur Dioxide (SO₂)
· Nitrogen Oxides (NOx)
· Carbon Monoxide (CO)
· Carbon Dioxide (CO₂)
· Volatile Organic Compounds (VOCs)
· Heavy metals (e.g., lead, mercury, cadmium)
· Dioxins and furans
🧪 Measurement Method:
· Stack monitoring is done using Continuous Emission Monitoring Systems (CEMS) or manual stack sampling as per CPCB/MoEF norms.
· Results are usually reported in mg/Nm³ or ppm.
🌍 2. Ambient Air Emissions (Ambient Air Quality)
These refer to the quality of the air in the environment outside the facility — i.e., the air people breathe in surrounding areas. These include emissions from multiple sources (industry, vehicles, construction, etc.).
📋 Key Ambient Pollutants Monitored:
· NH₃ (Ammonia)
· Benzene, Benzo(a)pyrene
🧪 Measurement Method:
· Ambient Air Quality Monitoring is done using Ambient Air Quality Monitoring Stations (AAQMS).
· Reported in µg/m³ as per National Ambient Air Quality Standards (NAAQS) in India.
✅ Regulatory Standards (India – CPCB):
Pollutant Stack Limit (Typical) Ambient Air Limit (24-hr avg, Industrial Area)
PM 150 mg/Nm³ (stack) 100 µg/m³ (PM10), 60 µg/m³ (PM2.5)
SO₂ 100 mg/Nm³ 80 µg/m³
NOx 50–300 mg/Nm³ 80 µg/m³
CO 100 mg/Nm³ 2 mg/m³ (1-hr avg)
Limits vary by industry type, fuel, and state-specific rules.
Aspect Stack Emissions Ambient Air Emissions
Source From industrial stacks or chimneys From all sources in the open environment
Purpose Regulatory compliance & pollution control Public health & environmental monitoring
Monitoring Stack analyzers or sampling Ambient air monitoring stations
ESG stands for Environmental, Social, and Governance — a framework used to assess an organization’s sustainability, ethical impact, and corporate responsibility beyond traditional financial metrics.
📊 The Three Pillars of ESG:
1. Environmental (E)
Focuses on how a company impacts the natural environment.
· Carbon footprint (GHG emissions)
· Energy and water usage
· Waste management
· Pollution control (air, water, soil)
· Biodiversity and conservation
· Climate risk and adaptation
Looks at how a company manages relationships with employees, communities, and stakeholders.
· Labor practices and human rights
· Health and safety
· Diversity, equity & inclusion (DEI)
· Community engagement
· Customer satisfaction
· Supply chain responsibility
3. Governance (G)
Relates to the structure, ethics, and accountability of corporate leadership.
· Board composition and diversity
· Business ethics and anti-corruption
· Transparency and disclosure
· Executive compensation
· Shareholder rights
· Compliance and risk management
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure II – Technical Specifications_ENG-EHV-1004_Specification of Line Differential Relay (LDR).pdf
Tender Document • 4.12 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure II – Technical Specifications_ENG-EHV-1005_Protection+Specifications.pdf
Tender Document • 5.29 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure II – Technical Specifications_ENG-EHV-1006-01_Automation+Specifications.pdf
Tender Document • 10.20 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure II – Technical Specifications_ENG-EHV-1016_Approved Make List.pdf
Tender Document • 1.18 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure X – GCC_Composite Work.pdf
Tender Document • 2.87 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure XIV – Safety Bid Document.pdf
Tender Document • 0.28 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure-I Schedule of Item_BOQ.pdf
Tender Document • 0.44 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Annexure-I Schedule of Item_BOQ.xlsx
Tender Document • 0.02 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Pre-Bid_Query_Format_TPDDL-ENGG-ENQ-200001982-26-27.xlsx
Tender Document • 0.01 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Scheme Wise-Location Wise BOQ Detail.xlsx
Tender Document • 0.02 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Spares Detail (Scheme wise).xlsx
Tender Document • 0.01 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_Supplier Sustainability Index (SSI) Questionnaire Format.xlsx
Tender Document • 0.03 MB
Tender Document_SITC of CRP_20260726205519527_Tender Document_TPDDL-ENGG-ENQ-200001982-26-27_SITC of CRP.pdf
Tender Document • 0.93 MB
Corrigendum Notification_20260826102259394.pdf
Corrigendum • 0.24 MB
Revise BOQ_20261013095750762_Revise BOQ_BOQ Clarification Annexure.xlsx
Corrigendum • 0.01 MB
Revise BOQ_20261013095750762_Revise BOQ_Revise Annexure-I Schedule of Item_BOQ.pdf
Corrigendum • 0.47 MB
Revise BOQ_20261013095750762_Revise BOQ_Revise_Price Bid Format_Annexure-I Schedule of Item_BOQ.xlsx
Corrigendum • 0.02 MB
Revise BOQ_20261013095750762_Revise BOQ_Revise_Scheme Wise-Location Wise BOQ Detail.xlsx
Corrigendum • 0.03 MB
Revise BOQ_20261013095750762_Revise BOQ_Revise_Spares Detail (Scheme wise).xlsx
Corrigendum • 0.01 MB
Revise BOQ_20261013095750762_Corrigendum Notification -2.pdf
Corrigendum • 0.50 MB
Revise BOQ_20261013095750762.zip
Corrigendum • 0.98 MB
Corrigendum Notification_20260826102259394.pdf
Corrigendum • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .