Tender Value
₹46.9 L
EMD Value
₹48,000
Closing Date
24 Jul 2020, 3:00 pmClosed
The Project Director
The Project Director
Renovation of 5 no of Ponds/Ooranies,Kulam/Kuttai in Kaniyambadi Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package No 69.
2020_RDTN_171252_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA vellore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹48,000
Yes
3 Aug 2020
14 Jul 2020
24 Jul 2020
14 Jul 2020
24 Jul 2020
14 Jul 2020
Amount
1. Improvements to pattinathar kulam, Palathuvannan Panchayat
Clearing julliflorra Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Bathing Ghat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Steps over Bund
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Inlet and Outlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
2. Improvements to AD Colony kulam, Salamanatham Panchayat
Clearing julliflorra Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Bathing Ghat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Steps over Bund
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
3. Improvements to Bairava kuttai, Kammasamudhram Panchayat
Clearing julliflorra Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Bathing Ghat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Steps over Bund
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Inlet and Outlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
4. Improvements to Kaniyambadi kulam , Kaniyambadi Panchayat
Clearing julliflorra Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Bathing Ghat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Steps over Bund
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
Inlet and Outlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
5. Improvents to kuppanag kulam at perumal pettai in kammavanpet panchayat (S.F.No.575)
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Sub estimate for Bathing Ghat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
K. SOMESAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .