Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | Rejected-Technical The firm is not fulfilled the eligibility criteria as per tender condition and not recommended by the Tender Committee for further evaluation |
Tender Value
Refer Docs
EMD Value
₹10,760
Closing Date
28 Mar 2023, 2:30 pmClosed
The Chief Mechanical Engineer
O/o. The Chief Mechanical Engineer Chennai Port Authority, 7th Floor, Centenary Building, No.1, Rajaji Salai, Chennai - 600 001.
Reconditioning of CU4A Pump at Old Pump House and Twin Screw Foam Pump at BD III pertaining to Fire Fighting System of Oil Dock
2023_ChPT_744024_1
MEE/08/2023/Dy.CME (MP and OH)
Open Tender
Pumps/Motors
Works
45 days
OIL DOCK, ROYAPURAM
As per Tender conditions.
12 documents required · 12 mandatory
₹0
₹10,760
Yes
13 Jul 2023
6 Mar 2023
29 Mar 2023
6 Mar 2023
28 Mar 2023
20 Mar 2023
CU 4A Pump - Horizontal single stage centrifugal Pumps (split casing) –Engine driven Charges for dismantling suction/Delivery lines , priming lines, de-couple the pump from the prime mover and remove the pump from the base frame. Recondition the pump with all required spare parts , like Ball bearings, gun metal wear rings, Brass bushes , lock nut, cast iron end covers, other accessories, required fasteners, gaskets,etc., assemble the pump, install the pump on the base frame and connect suction/delivery/priming lines ,Drive and Non-drive end gland packing to be changed, etc., check the alignment, testing for gland leaks and commissioning of pump set , painting base plate and pump set with one coat of epoxy zinc rich primer and two coats final epoxy base painting with colours mentioned below: as detailed in Schedule-A Base plate : Grey Pump: Yellow (All the required materials for the above work shall be arranged by the contractor)
Twin screw Pump – Motor driven Charges for dismantling suction/Delivery lines, priming lines, de-couple the pump from the Motor and remove the pump from the base frame. Recondition the pump with all required spare parts, like Ball bearings, Mechanical seals, fasteners, gaskets, etc., assemble the pump, install the pump on the base frame and connect suction/delivery/priming lines, couple the pump with motor, check the alignment, testing and commissioning of pump set painting base plate and pump set with one coat of epoxy zinc rich primer and two coats final epoxy base painting with colours mentioned below: as detailed in Schedule-A Base plate: Grey Pump: Yellow (All the required materials for the above work shall be arranged by the contractor)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .