| 1 | L1₹10.0 LAdmitted-Fee/PreQual/Technical/Finance NO 64 PERUMALPALAYAM PUDHUR THALAVAIPETTAI POST BHAVANI TALUK ERODE DISTRICT 638 312 | ERODE | TAMIL NADU | 638312 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹11.0 L+₹96,094.21 (9.62%)Admitted-Fee/PreQual/Technical/Finance 74 T N H B COLONY NEAR BALAMURUGAN TEMPLE MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SAKTHI ENGINEERS L1 | Sri Sivaram and co L2 |
|---|---|---|---|---|---|
| 1.00 | Providing sthabathi elevation work in the top of for a 340 mm width, 120 mm thick using brickwork in 1:5 Cement Mortar with curved nosing of 150 mm at the front edge. The rate includes cost of all materials, scaffolding charges, Labour charges, etc. The entire work has to be completed statisfactorily as per the direction of the officers concerned. | 68 | Rm | 808 ₹54,944 Lowest | 880 ₹59,840 |
| 2.00 | Providing sthabathi elevation work in the columns by providing Ornamental Projected band of width 35 cm, thickness 12mm. The rate includes cost of all materials scaffolding charges, Labour charges, scaffolding if necessary, the entire work has to be completed statisfactorily as per the direction of officers concerned. | 177 | Rm | 600 ₹1,06,200 Lowest | 660 ₹1,16,820 |
| 3.00 | Providing sthabathi elevation work using Projected band around window opening for a width 75 mm, thickness 12mm. The rate includes cost of all materials, scaffolding charges, Labour charges, etc. The entire work has to be completed statisfactorily as per the direction of the officers concerned. | 96 | Rm | 350 ₹33,600 Lowest | 385 ₹36,960 |
| 4.00 | Painting the wall with Texture Finish Paint including labour charges etc., complete complying with standard specifications | 84 | Sq.m | 415 ₹34,860 Lowest | 453 ₹38,052 |
| 5.00 | Supplying and fixing of GI Galvanized Fully Panelled steel door with Size 1.50m x 2.10m Door Thickness 70mm Frame thickness 230mm ,GI Sheet thickness 1.4mm, Frame thickness 1.8mm, Multipoint locking system 16 bullet lock and baby lock, Lens provided on both the side of the door,etc…, Complete complying with standard specification and as direct by the Departmetal Officers. | 1 | No | 69,500 ₹69,500 Lowest | 75,900 ₹75,900 |
| 6.00 | Labour charges for Drilling / Boring towards provide under reamed cast in situ pile of 250mm dia to a depth of 0m to 4.50m depth from the Existing Ground level with single bulb including cost of machinery, labour charges and other materials required etc., complete complying with the standard specification and as directed by the departmental officers. (Concrete and Steel reinforcement shall be measured and paid seperately) | 293.4 | Rm | 650 ₹1,90,710 Lowest | 715 ₹2,09,781 |
| 7.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 37 | Cu.m | 260 ₹9,620 Lowest | 283 ₹10,471 |
| 8.00 | Supplying and filling in foundation, basement, etc with Gravel in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 9.72 | Cu.m | 480 ₹4,665.6 Lowest | 528 ₹5,132.16 |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 7 | Cu.m | 6,000 ₹42,000 Lowest | 6,610 ₹46,270 |
| 10.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 26 | Sq.m | 695 ₹18,070 Lowest | 755 ₹19,630 |
Tender Value
₹8.8 L
EMD Value
₹9,000
Closing Date
16 Sept 2026, 3:00 pmClosed
Executive Engineer
Projects Divison, GCE Campus,Tirunelveli
Finishing front elevation for the work of Construction of Hostel building with 50 Rooms for 150 Students (MBA) Government Arts College at Paramakudi in Ramanathapuram District.
2026_HE_697954_1
03/2026-2027/Projects-Tvl
Open Tender
Civil Works - Buildings
Lump-sum
30 days
Paramakudi
Please Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹9,000
18 Sept 2026
28 Aug 2026
16 Sept 2026
28 Aug 2026
16 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing sthabathi elevation work in the top of for a 340 mm width, 120 mm thick using brickwork in 1:5 Cement Mortar with curved nosing of 150 mm at the front edge. The rate includes cost of all materials, scaffolding charges, Labour charges, etc. The entire work has to be completed statisfactorily as per the direction of the officers concerned. | 68 | Rm | 256.77 | ₹17,460.36 |
| 2 | Providing sthabathi elevation work in the columns by providing Ornamental Projected band of width 35 cm, thickness 12mm. The rate includes cost of all materials scaffolding charges, Labour charges, scaffolding if necessary, the entire work has to be completed statisfactorily as per the direction of officers concerned. | 177 | Rm | 5,333.35 | ₹9,44,002.95 |
| 3 | Providing sthabathi elevation work using Projected band around window opening for a width 75 mm, thickness 12mm. The rate includes cost of all materials, scaffolding charges, Labour charges, etc. The entire work has to be completed statisfactorily as per the direction of the officers concerned. | 96 | Rm | 5,333.35 | ₹5,12,001.6 |
| 4 | Painting the wall with Texture Finish Paint including labour charges etc., complete complying with standard specifications | 84 | Sq.m | 622.39 | ₹52,280.76 |
| 5 | Supplying and fixing of GI Galvanized Fully Panelled steel door with Size 1.50m x 2.10m Door Thickness 70mm Frame thickness 230mm ,GI Sheet thickness 1.4mm, Frame thickness 1.8mm, Multipoint locking system 16 bullet lock and baby lock, Lens provided on both the side of the door,etc…, Complete complying with standard specification and as direct by the Departmetal Officers. | 1 | No | 623.39 | ₹623.39 |
| 6 | Labour charges for Drilling / Boring towards provide under reamed cast in situ pile of 250mm dia to a depth of 0m to 4.50m depth from the Existing Ground level with single bulb including cost of machinery, labour charges and other materials required etc., complete complying with the standard specification and as directed by the departmental officers. (Concrete and Steel reinforcement shall be measured and paid seperately) | 293.4 | Rm | 369.81 | ₹1,08,502.25 |
| 7 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 37 | Cu.m | 370.81 | ₹13,719.97 |
| 8 | Supplying and filling in foundation, basement, etc with Gravel in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 9.72 | Cu.m | 623.39 | ₹6,059.35 |
| 9 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 7 | Cu.m | 623.39 | ₹4,363.73 |
| 10 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 26 | Sq.m | 143 | ₹3,718 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_839033.xls
BOQ • 0.41 MB
FRONTELEVATIONPARAMAKUDI.pdf
Tender Documents • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .