Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹20.1 L
EMD Value
₹40,240
Closing Date
22 Jul 2020, 4:00 pmClosed
Executive Engineer PWD
Executive Engineer PWD
Upgradation of Jandrola to Zairat Thanpeer Road Treatment of Patches and Pot Holes by way of Providing Laying WBM Grade-II, WBM III 25 mm thick Open Graded Premix Carpet including 6mm thick seal Coat
2020_PWDJK_100201_5
e-NIT No. 22/2020-21 dated 11-07-2020
Open Tender
Civil Works
Item Rate
60 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer PWD Poonch
₹40,240
Yes
29 Jul 2020
11 Jul 2020
23 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm. On plan, depth up to 1.5 mtr. Including disposal of excavated earth up to 1 mtr. from cutting edge, disposed earth is to be leveled neatly dressed in: all kinds of soil .
Hand packed stones in zinc coated gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120mm and wire dia 2.70 mm selvedge wire dia 3.4 mm & lacing wire dia 202 mm crates including supply of stones , cost of zinc coated gabions crates and all leads/lifts , carriages , handling and re-handling ( Complete job)
Providing and laying WBM-GR- II 75 mm thick with broken Nallah/Crusher stone aggregate of 63 to 45mm size including screening of 13.2 mm size and using good earth as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, all lead and lift for complete job.
Providing and laying WBM-GR- III with broken Nallah /Crusher stone aggregate of 53 to 22.4mm size including screening of 11.2 mm size and usingcrusher dust as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, octroi, sale tax, service tax all lead and lift for complete job .
Providing,& laying open graded premix carpet of 25 mm average compacted thickness with bitumen of 80/100(VG-10) grade @ 5%(percentage by weight of total mix) on prepared surface with specified graded crushed stone aggregates for wearing course including loading of aggregate with F.E loader and hot mixing of bitumen with filler and stone aggregates in hot mix plant , transporting the mixed material by tippers to paver and laying the mixed material with mechanical paver finisher fitted with electronic sensing device to the required level and grade and rolling with road rollers as per MORTH specifications and direction of Engineer-in-Charge to achieve the desire density and compaction including the cost of brooming , primer/tack coat , all leads/lifts , carriages , loading & unloading ( Complete job)
Strenthening of shoulders/berms of the road by way of river bed/grandular material/mixed with earth , sand , stone agg. below 20 mm nominal size including sources to site of work,spreading & laying in layers not exceding 20 cm in depth,watering,rolling each layer with road roller/steel rammers complete in all respect.
ZAFFAR AHMED
SHAZAD SHABNAM
M/s Ghai Stone Crusher
M/s Sehrash Rafiq
M/s Khurshid Ahmed
ABDUL RASHID
Abdul Razak
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .