| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.8 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹5.1 L+₹24,900 (5.15%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹5.1 L+₹27,900 (5.78%)Accepted-Finance AASHIYANA SECTOR N 304 KILA CHAURAHA KANPUR ROAD AASHIYANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L-3 | Accepted-Finance Admitted |
Tender Value
₹6.4 L
EMD Value
₹7,000
Closing Date
18 Oct 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, 220 KV S/S Campus Natwa, Mirzapur
Installation of 63 MVA, 132/33 KV Transformer (Atlanta make) by replacing 40 MVA, 132/33 KV T/F (Accurate Make) along with other associated works at 132 KV S/S Robertsganj under ETD, Robertsganj.
2022_UPTCL_730829_1
short term T. No. 38/2022-23/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
20 days
Robertsganj
As per tender specification
2 documents required · 2 mandatory
₹826
Executive Engineer, ETD, Mirzapur
₹7,000
16 Nov 2022
22 Sept 2022
19 Oct 2022
22 Sept 2022
18 Oct 2022
22 Sept 2022
Amount
Dismantling of 40 MVA, 132/33 KV T/F Accurate make, after opening of jumpers and cable connections draming out T/F oil into 209 Ltrs capacity empty drums/rank , removal of all rediators, conservator tank, oil pipe lines, all bushing, turrates, marshlling box RTCC panel etc. blanking the radiators pipe lines, conservator tank, with proper gaskets along with nuts & bolts to complete the jobs statisfactorily including proper stacking, all labour, T&P shall be provided by contractor on his own cost.
Removal of earthing for neutral and main tank of transformer by cutting of welding and removal of supports etc.
Shifting of main tank of 40 MVA, 132/33 KV, ACCURATE make transformer from plinth to stacking place distance approx,. 100 meter outside of switchyard including turning of to tank, if required , including all T&P and work required to complete the job satisfacorily one job equal to 05 MTR.
Dissmantling of existing 33 KV T/F Bus bar (RYB) of ACSR moose conductor along with tension fitting and disc insulators including shifting & proper stacking of dismantled mterials in the store of 132 KV substation Robertsganj.
Stringing of new 33 KV T/F bus bar of twin moose conductor and tightening with gentry along with horsting. Clamping and fixing of all hardware & fittings including all other accociated work.
shifting of main tank of 63MVA, 132/33 KV transformer from unloading point to distance upto the plinth approx. 120 meter distance, inculding turning to tank, if required including all T&P and work required to complete the job satisfactorily at 132 KV S/S Robertsganj. One job equal to 05 Mtr.
Carriage of 20 KL transformer Oil tank from 220 KV S/S, Natwa, Mirzapur upto 132 KV S/S Robertsganj And shifting back of the same upto 220 KV S/S, Natwa, Mirzapur after completion of the centrifuging work contractor will arrange truck/tailer for safe transportation approx distance 95 Km.
Complete errection of 132/33 KV, 63 MVA T/F by erection of radiators, conservator tank all bushing with their turrerts, connecting oil pipe, cooling fans, motor drive mechanism with tap changer. RTCC panel, and associated oil pipe line etc to complete the job satisfactorily, including first filling of T/F oil (already centrifuged transformer oil in the 20 KL tank and topping up fo T/F oil for circulation in transformer, Radiator pipe lines, conservator tank etc and attending oil leakage, if any and all other associated work so that transformer result are achieved to complete the erection including cost of labour T&P etc.
Certrifuging of T/F oil of 63 MVA transformer after erection at 132 KV Substation Robertsganj in tank and circulation in conservator tank OLTC and radiator to achieve perquiste B.D.V. above 65 KV and all other parameter.
earthing of neutral and main tank of transformer by way of cutting bending welding and conncerned terminal of transformer.
Dismantling of 33 KV, 800/400/1A current transformer by way of cutting bending, welding and connecting to concerned terninal of transformer.
Dismantling of 33 KV, 1250 A Rating BSI by removal of earthing opening of jumpers and shifting to store including all associated work.
Installation of 2000A Rating 33 KV BSI on its structures, Earthing, opening of jumpers and shifting to store including all associated work.
Installation of 2000/1200/1A current transformer in place of 800/400/1A CT on its structures, earthing of the same, making connection of jumpers and control cable etc. including shifting from stacking place to erection place including all associated work.
Jumpering of transforer with HV side by way of cutting of conductor and on LV side with twin moose conductor from bushing to Bus. Bus to CT, CT to CB, CB to BSI etc including all associated work.
Laying and termination of control cable in DCDB, MB and RTCC panel and T/F C&R panel and its termination at transformer and control room both sides to complete the job in all respect (2x2.5 mm 24 Nos, 4x2.5 mm 230 nos., 6x2.5 mm 210 Nos, 10x2.5 mm 26 Nos.)
M/S ACCURATE ENGINEERING
SMV POWER SOLUTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .